Plan for Helicoflex Seals
5 Apr 06
At RAL
Martin (keep Patrick informed in light of visit to Garlock):
- Verify compression of Seals actually achieved with “setting plastic”.
- Interact with John on Washer design. Check Washer design.
- Investigate additional DurAl compression plates for qualification.
- Post mortem on failed seal.
- Look at surface under microscope.
- Try to seal again
- Measure thickness of qualified seals and compressed seals – info to Bill.
- Photo of Deltas and bump on thick seal – info to Bill.
- Ask Metrology to look at profile of Delta’s on Seals (unsquashed, squashed etc)
- Qualify Washers with Seals.
John
- Design Washer
- Dimensions – watch obscuring fluid flow or touching Seal.
- Consider some different seals of thickness 0.3 to 0.2 mm thickness.
- Tolerances
- Surface finish
- Material – CuNi or Cu
- Schedule – days rather than weeks.
- Investigate possibility of some quick washers from Workshop
- John Spencer(x6683) for fast turn round on a few (6+??) for initial tests. (Produce some, then discuss additional numbers for qualification.)
- Source material for John – discuss with him.
- Identify company for production.
Martin’s movements:
- If Washers can be available 10-13 Apr, Martin should cancel CERN trip.
- If not, Martin should probably go to CERN, unless there is something very useful which can be done to move Seal Project forwards.
Canceling CERN trip (10-13 Apr):
- Cancel flight
- Cancel Hotel
- Cancel taxi
- Ask Paul to prepare RS Wing #2 (CF part) in prep for Brian:
- Holes
- Grounding Tabs
- Ensure Paul has improved drawings
John’s priorities
- Washers
- Complete RS Assy drawings – Martin to check
- Complete Wiring (OTE, PPF1)
- Stiffener – 10-13 Apr
PTO
Garlock
Patrick would like to visit Garlock in St. Etienne on 11 or 12 April.
UK Rep – –0777 599 6919
Some useful links at:
Additional thoughts
Andy Nichols has some thoughts (always worth consulting):
- Cu plating not good because Ni layer will crack.
- Peek ?
- Silicone rubber – rad hard concerns less significant now; what about reaction with C3F8 ?
Other things
HEX
Jason hopes to finish Wed 5 Apr.
He will be away 6-10 Apr; back 11 Apr.
Transport of Liverpool Equipment
Collection in Liverpool Fri 7 Apr.
Leave RAL Mon 10 Apr.
Arrive CERN Tue 11 Apr.
Liverpool contacts: Tim, Joost, Ashley, Dave Muskett.
RAL Transport: Mike Evason x 5544
RAL Shipping Documentation: Andy Napper x6663
CERN end:Mary Elizabeth Shewry
Current plan (as of 10.30 5 Apr): unload everything at Bat 904 (Prevessin)
Belleville Springs
- Tommy Farr has asked for quote from Belleville Springs – will be sent to you.
- Should be for few £100’s. Material must be Iconel 718.
- Please complete order (RFS) – Martin could help.