AE Senior ThesisSandy Vondrak

Table of Figures

FigureSource

Cover Page & Abstract Renderings...... The Austin Company

Project Background and Introduction (pp 1-5)

  • Figure 1.1: St. Jude Facility in December, 2002...... The Austin Company
  • Figure 1.2: Overlay of Facility on Existing Parking Lot...... The Austin Company
  • Figure 1.3: St. Jude Campus Master Plan...... St. Jude Children’s ResearchHospital
  • Figure 1.4: Project Organization Chart...... Sandy Vondrak
  • Figure 1.5: Personnel Organization Chart...... The Austin Company (modified)

Architectural Considerations & Design (pp 7-10)

  • Figure 2.1: VontzCenter (Cincinnati, OH)......
  • Figure 2.2: Salk Institute (La Jolla, CA)......
  • Figure 2.3: Conventional vs. Interstitial Sections......
  • Figure 2.4: South Elevation with Interstitial Spaces...... The Austin Company (modified)
  • Figure 2.5: Additional Building Volume...... Sandy Vondrak
  • Figure 2.6: Façade Material Surface Areas...... Sandy Vondrak

Structural Considerations & Design (pp 11-16)

  • Figure 3.1: Schematic of Building Areas...... Sandy Vondrak
  • Figure 3.2: Interstitial Space with Catwalk...... United States Steel
  • Figure 3.3: Typical Bay with Tributary Areas...... Sandy Vondrak
  • Figure 3.4: Beam Designs for Typical Bay...... Sandy Vondrak

Mechanical Considerations & Design (pp 17-21)

  • Figure 4.1: 21st Century Lab Interstitial Space......
  • Figure 4.2: Conventional Laboratory...... The Austin Company
  • Figure 4.3: Interstitial Laboratory...... The Austin Company
  • Figure 4.4: Typical Laboratory Module...... EELab Online Guide
  • Figure 4.5: St. Jude Facility Purification Lab...... The Austin Company
  • Figure 4.6: HAP Analysis Elevations...... Sandy Vondrak

Table of Figures (continued)

FigureSource

Construction Management Analysis (pp 23-33)

  • Figure 5.1: BoyneSchool of Dental Science in Nebraska......
  • Figure 5.2: GoodSamaritanHospital......
  • Figure 5.3: Salk Institute......
  • Figure 5.4: Construction Sequencing...... Dr. Riley AE 472 Course Notes
  • Figure 5.5: St. Jude Pre-Stocked Drywall...... The Austin Company
  • Figure 5.6: St. Jude Metal Stud Installation...... The Austin Company
  • Figure 5.7: Duct Testing...... The Austin Company
  • Figure 5.8: Additional Floor Construction Schedule...... Sandy Vondrak
  • Figure 5.9: 10% Productivity Savings Schedule...... Sandy Vondrak
  • Figure 5.10: Simultaneous Work in Spaces...... Sandy Vondrak
  • Figure 5.11: Interstitial Floor Take-Off...... Sandy Vondrak

Interstitial Space Research (pp 34-43)

  • Figure 6.1: Kansas City New Surgical Suite......
  • Figure 6.2: MadiganArmyMedicalCenter......
  • Figure 6.3: Phase 1 – Wintraub & Hutchinson......
  • Figure 6.4: Phase 2 – Thomas Building......
  • Figure 6.5: Survey Question 3 – Advantages...... Sandy Vondrak
  • Figure 6.6: Survey Question 4 – Disadvantages...... Sandy Vondrak
  • Figure 6.7: Survey Question 6 – Reason for Use...... Sandy Vondrak
  • Figure 6.8: Survey Question 7 – Project Outcome...... Sandy Vondrak
  • Figure 6.9: Survey Question 8 – Criteria for Use...... Sandy Vondrak

April 15, 2003vii