512-IR-1
U.S. DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
512 – Forage and biomass Planting
implementation requirements
Client / DateFarm/Tract / Field(s)
Location/MLRA / Acres
Planner / County
4Eta Zone / Soil Map Unit
This practice shall be completed in accordance with the following maps/drawings, specifications and special requirements. NO CHANGES ARE TO BE MADE IN THE SPECIFICATIONS and REQUIREMENTS WITHOUT PRIOR APPROVAL OF THE NRCS TECHNICAL SPECIALIST.
List of Maps or Drawings: Location of fields or areas within fields to be planted, Soils Map.
List of Specifications: __512__, ______,
1. Objectives of this Practice:
2. Description of competing vegetation:
3. Seedbed Preparation, Fertilizers or Amendments:
4. Date Range: Planting shall be performed within the period: ______
5. PLANNED: Species, Planting Methods, Seeding Rate (PLS),Date of Planting, and Depth of Seeding
Species / Method / PLS Rate (lbs/ac) / Planting Date / Seeding Depth / Field Number / Acres6.Early establishment requirements:(Grazing deferment, harvest plans/deferment).
7. Special Requirements (Limiting Elements):
8. Installation Documentation:Specify actualspecies planted, method of planting, PLS rate, planting date, seeding depth, and acres for each field planted. Matrix provided in Practice Certification section below.
Design Job Approval:
Practice code /Practice
/ LeadDiscipline
/Controlling factor
/ Units / Job classI / II / III / IV / V
512 /
Forage & Biomass Planting
/Range SpecialistAgronomist
/ Soil Limitations / Number / 1 / 2 / 3 / 4 / All512 /
Forage & Biomass Planting
/Range SpecialistAgronomist
/ Area / Acres / <40 / 40-160 / >160 / All / AllThis practice is classified as Job Class (check one):
Design Approved by: /s/ Date:
Job title:
Client’sAcknowledgementStatement:
TheClientacknowledgesthat:
a.Theyhavereceivedacopyofthemaps or drawings, specifications, and implementation requirements,andunderstandthecontents.
b.Documentationof seed tag, PLS, planting depth, planting method, seeding rate and any soil amendments and/or fertilizersprovidedtoNRCSbytheclientbeforeplanting, during planting and post-planting before thispracticecanbecertifiedasapplied.
c.Itshallbetheresponsibilityoftheclienttoobtainallnecessarypermitsand/orrights,andtocomplywithallordinancesandlawspertainingtotheapplicationofthispractice.
Acceptedby:/s/Date:
NRCS, CA
December 2015
550-3
Practice Certification:
LANDOWNER TO NOTIFY NRCS OFFICE:
During Seedbed Preparation
During Planting
When Planting is Completed
Installation documentation showing what was done on site. Must be completed for practice certification.
Refer to Item 8, above.
Species / Method / PLS Rate (lbs/ac) / Planting Date / Seeding Depth / Field Number / AcresPractice Completion:
I have made an on-site inspection during planting and at completion of the planting practice, and have determined that the job, as installed,conforms to the drawings, specifications, and implementation requirements.
Completion Certification by:
- Seedbed Preparation: /s/______Date: ______
- During Planting:/s/______Date: ______
- After Planting: /s/______Date: ______
NRCS, CA
November 2015