MEMPHIS REFINERY STANDARD PROCEDURES
Revision Date: / Marine Emission Control SystemAnnual Test Procedures / Annual Certification Date
Original Date: Oct. 2001
2009
2009 / 2010
2010 / 2011
2011 / 2012
2012 / 2013
2013
ANNUAL TEST PROCEDURE
LSH, LSHH – Vessel High Level and Overfill
PSL, PSLL – Pressure Switch Low, Pressure Switch Low Low
PSH, PSHH – Pressure Switch High, Pressure Switch High High
PDSH, PDSL – Pressure Differential Switch High (Back flow at Detonation Arresters)
TSH – Temperature Switch High (at Detonation Arrestor)
FSL – Sample Low Flow to O2 Analyzers
ASH, ASHH – High Oxygen Concentration, High High Oxygen Concentration
ESD – Emergency Shutdown Push Button
LSHH, LSH – Liquid levels; Knockout Drum
TSH; Detonation Arrester
TSL – Pilot Low Temperature
BL – Vapor Blower Failure
ANNUAL TEST PROCEDURE MEMPHIS REFINERY
MARINE EMISSION CONTROL SYSTEM
TimeDateInitial
1.______LSH, LSHH – Vessel High Level and Overfill:
Using jumpers in the vessel end of the connection cable, the high level alarm and the overfill protection shall be checked by removing the jumpers from the plug, causing an alarm and then a shutdown. The shutdown will close the liquid loading and the vapor valves and shutdown the blower.
2.______PSL, PSLL – Pressure Switch Low, Pressure Switch Low Low
Using the pressure test equipment and test meters, a vacuum will be induced on the pressure switches to cause an alarm condition and then a shutdown condition. The shutdown will close the liquid loading and vapor valves and shutdown the blower.
3.______PSH, PSHH – Pressure Switch High, Pressure Switch High High
Using the pressure test equipment and test meters, a positive pressure will be induced on the pressure switches to cause an alarm and the shutdown condition. The shutdown will close the liquid loading and vapor valves and shutdown the blower.
4.______PDSH, PDSL – Pressure Differential Switch High (Back flow at Detonation Arresters)
Using pressure test equipment and test meters, a positive pressure will be induced on the low-pressure side, causing a back flow condition. The shutdown will close the liquid loading and vapor valves and shutdown the blower.
5.______TSH – Temperature Switch High (at Detonation Arrestor)
Using a JOFRA 202 Temperature Calibrator (or equal), a high temperature will be induced on the temperature switches. The shutdown will close the liquid loading and vapor valves and will shutdown the blower.
6.______FSL – Sample Low Flow to O2 Analyzers
By manual closing off the flow, a low flow condition will be induced at the flow switch. The shutdown will close the liquid loading and vapor valves and will shutdown the blower.
7.______ASH, ASHH – High Oxygen Concentration, High High Oxygen Concentration
Using air or span gas (es), the oxygen level in the stream to the analyzers will be raised to the alarm set point and then to the shutdown set point. The shutdown will close the liquid loading and vapor valves and will shutdown the blower.
8.______ESD – Emergency Shutdown Push Button
By actuating the ESD push button, the liquid loading and vapor valves will close and the blower will shutdown . The flare will also be shutdown.
9.______LSHH, LSH – Liquid levels; Knockout Drum
Using water, the liquid level in the vessel will be raised to cause a high level in the vessel for the alarm condition. Then the level will be raised to cause a high high level condition that will close the liquid loading valve and the vapor block valves and shutdown the blower.
10.______TSH; Detonation Arrester
Using JOFRA Temperature Calibrator (or Equal), a high temperature will be induced on the temperature switch, causing a shutdown of the entire system.
11.______TSL – Pilot Low Temperature
Using a millivolt signal generator, a signal will be induced onto the temperature switches, causing an alarm and then a shutdown condition. The shutdown will cause the flare to shutdown, closing the flare block valves and shutdown the entire system
12.______BL – Vapor Blower Failure
Manual trip motor starter, causing shutdown of vapor blower, closing liquid, vapor and natural gas block valves.
Pg. 1
RD MECS Annual Tests.docMay 18, 2009