NZQA Expiring unit standard / 24175 version 3
Page 1 of 2
Title / Complete building inspections for small buildings
Level / 5 / Credits / 25
Purpose / This unit standard is for Building Control Surveyors who are required to complete building inspections for small buildings. People credited with this unit standard are able to: complete the pre-inspection process of building inspections for small buildings; complete building inspections for small buildings; and complete the post-inspection process of building inspections for small buildings.
Classification / Compliance and Law Enforcement > Building Control Surveying
Available grade / Achieved

Guidance Information

None.

Outcomes and performance criteria

Outcome 1

Complete the pre-inspection process of building inspections for small buildings.

Performance criteria

1.1Documents required for inspecting a small building are obtained in accordance with the requirements of the quality management system (QMS).

1.2Equipment required for inspections is operated in accordance with manufacturers’ instructions and QMS.

Rangeequipment includes moisture meter and any four of the following – probe, post hole borer, penetrometer, sheer vane tester, inclinometer, measuring tape, personal protective equipment (PPE), levels.

1.3The process for booking building consent inspections is completed in accordance with QMS.

Outcome 2

Complete building inspections for small buildings.

Performance criteria

2.1Compliance of small buildings is established with the building consent approved documents and Project Information Memorandum (PIM) in accordance with QMS.

Rangeincludes but is not limited to – building materials, construction, type, size, and spacing of all building components.

2.2Compliance of small buildings is established with the Building Code and manufacturers’ product specifications and warranties.

2.3Compliance of small buildings is established in terms of bulk and location requirements in accordance with the District Plan.

2.4Any amendments to the approved consent documents are made according to the Building Act 2004, District Plan, and QMS.

Outcome 3

Complete the post-inspection process of building inspections for small buildings.

Performance criteria

3.1The inspection is documented in accordance with QMS.

3.2The compliance actions are documented in accordance with QMS.

3.3Documents are stored in accordance with the Building Act 2004 and QMS.

Replacement information / This unit standard replaced unit standard 7227.

This unit standard is expiring. Assessment against the standard must take place by the last date for assessment set out below.

Status information and last date for assessment for superseded versions

Process / Version / Date / Last Date for Assessment
Registration / 1 / 25 January 2008 / 31 December 2019
Revision / 2 / 17 October 2008 / 31 December 2019
Review / 3 / 23 November 2017 / 31 December 2019