TC 155 – Plastics piping systems and ducting systems - Leuven, Belgium.
The 52nd meeting was held in Leuven, Belgium on the 20th and 21st November 2012. A total of 60 delegates, liaisons and officers from 19 member countries attended the meeting.
4 members from the Commission and CEN also attended including Mr Bedotti, Amilcar DA Costa, and Goncalo Asensao.
The UK delegation comprised Steve Beech, Convenor of WG 12, Bob March (GRP) and Frank Jones head of delegation.
The Plenary was divided into five sessions: Non-pressure, General Matters Relating to Pressure and Non Pressure, Pressure, Liaison Reports and Matters Relating to Harmonisation.
Some guidance to CEN procedures is included at the end of this report.
Page Subject
1-2 General/Non-pressure
2 General/Pressure
2 -3 Pressure/Industrial
3-4 Liaison reports/CE marking
All TC Docs including WG’s, TG’s and AHG’s will be published on CEN live link. (Password protected).
For the first time we have included the TC document number. If you wish to see the document please contact me or Carol on
Non–pressure
WG 1 – Installation, Pressure and Non-Pressure 3839
CEN/TR 1046 - Thermoplastics piping systems – systems outside building structures for the conveyance of water or sewerage. Practices for underground installation issued for TCA process closing date February 8th 2013.
It has been agreed that TC/155 will have input into the TC/165 documents EN 1295 (Structural design of Buried Pipelines) and EN 1610 (Construction and Design of Drains and Sewers), both of which are currently under revision.
TS 1046 can be withdrawn in 3 years if there is a suitable EN 1610 outcome.
The revision of TS 15223 (Plastic piping systems-Validated design parameters design of buried thermoplastic piping systems) has started. It will be kept as a preliminary work item until the progress of CEN TC 165/WG 12 “Structural design of pipelines (EN 1295-4) is known.
WG 6 – PVC-U Soil and Waste and Drains and Sewers 3849
EN 1329-1 (PVC-U soil and waste) – revised taking into account TPE joints, consistency of dimensions between metric series and inch series. Referenced to the ISO documents. Clarification of products covered.
Now ready for UAP procedure.
Work to revise EN 1453 (Soil and waste PVC-U)-1 and -2 to be started shortly.
ENV 13801 (soil and waste recommended practice for installation) revised in conjunction with WG 10 convenor. Now ready for CEN Enquiry as a TR!
Next meetings: February 2nd and 3rd in Paris. June (Porto) date tbc.
WG 10 - Non-PVC Soil and Waste and Drains and Sewers 3844
EN 12666-2 (PE non-pressure underground drainage and sewerage) – Assessment of Conformity published 2102 -08-29.
WG 13 - Structured Wall Systems 3855
Revision of EN 13476-4 (Structured wall pipes Assessment of Conformity) under periodic review. Approved
EN 13476 -1,-2 and part 3 will be subjected to a focussed review, concentrating on:
Larger diameters, editorial update, attempt to align with CEN TS 14541, take account of reprocessable and recyclable materials.
WG 15 Rainwater Systems 3853
Alastair Walmsley re-appointed convenor of WG 15 in place of Phil Turner to review 12200-1.
UK to confirm AW’s appointment or find another chair by the end of Jan 2013.
WG 20 – Ancillaries Non Pressure 3854
Alastair Walmsley reappointed Convenor of WG 20 in place of Phil Turner.
UK to confirm AW appointment or find another.
WG 26 - Systems for Storm Water Handling 3851
Convenor K Strom
WI 00155766 Specification for boxes used for infiltration, attenuation and storage systems made of un-plasticised PVC-U and PP.
Commission Internal Ballot (CIB) closes 2012 -11-23.
Ad Hoc Groups established:
AHG 1 – Mechanical Strength
WI 00155783 Test method for strength of boxes closes 2012-11-23.
AHG 2 – Material
WI 00155784. Test method for short term compression strength of boxes CIB closing 2012-11-23.
· General
WG 14 – GRP Associated Projects 3850
prEN 15383 (GRP manholes and inspection chambers) – approved being prepared for formal vote.
EN 1796 and EN 14364 (pipe product standards) vote closed Nov 13. No discussion.
TS 14807 (Structural analysis) – Ready for vote January 2013.
EN 1226 (initial ring stiffness to be confirmed).
Next Meeting: 22nd and 23rd January 2013 in Berlin.
WG 17 – Renovation 3842
Note the ISO 138 Committee has become a full SC.
Existing EN standards to be updated and replaced by equivalent EN ISO standards.
Parallel voting on prEN ISO 11297-1 (D&S under pressure-general) and -3 (D&S under pressure – lining with close fit pipes) ended 16th October 2012.
New work items ISO 11296-7 (Drainage & Sewerage lining with spirally wound pipes), ISO 11299-1 (Gas general) and ISO 11299-3 (Gas close fit pipe), UAP started 26th July 2012 ends 26th December 2012.
WG 21 – Assessment
No new activity.
WG 25 – Recycling of PVC-U, PE and PP Materials 3840
Review of CEN/TS 14541.
Circulated as TS.
WG 27 Environmental Aspects 3835
Application
1st Priority: pressurised buried systems.
2nd Non- Pressurised buried systems.
3rd In house non pressure.
4th In house systems pressure.
5th Ducting systems.
Work will be based upon EN15804.
The aim is to develop a single document per application when developing a LCA /EPD for plastic piping systems.
AHG 47 – Wall Construction Definitions 3841
ISO/DTR 27165 – Thermoplastic piping systems – Guidance for definitions of wall constructions for pipes. Published 2102-10-15.
· Pressure
AHG 37 Policies Relating to Drinking Water Issues 3859
Mandate M/136 (water intended for human consumption.)
Although CEN/TC 155 took a resolution during its last plenary meeting stating that it is the
task of AHG 37 to prepare an answer to mandate M/136 rev. 2, it is too early to prepare any document as further information is required.
It is expected that progress will be made at the January 2013 meeting.
WG 8 – PVC-U (Solid Wall) Pressure 3847
Part 7 EN 1852-7 (assessment of conformity) – failed TCA due to be reissued for 2nd TCA
prEN ISO 13844 Elastomeric sealing rings test method for leak tightness under negative pressure.
Under preparation for CD vote.
prEN ISO 13845 Test method for leak tightness under internal pressure and angular deflection.
Under preparation for CD vote.
WG 12 – Systems of PO Material for Pressure Drainage, Water Supply and Gas Supply. 3836
Parts 1/2/3/5 of the revision of EN 1555 were published in October 2010 and Part 4 in May2011.
The discussion of the revision of CEN/TS 1555-7 now agreed and ready for publication.
Water
EN 12201-1/2/3/5 (for the revision of EN 12201 series and to incorporate EN 13244)
Published in October 2011
EN 12201-4 was published Feb 2012
The EN13244 series has been withdrawn.
The revision of CEN/TS 12201-7 has started and will include an annex on fabricated fittings.
Size range extended to 2500mm.
Questions were raised re testing procedure for the larger diameters.
A new AHG group was formed to look at testing of large diameter pipes.
WG16 – Hot and Cold Water Applications 3845
Revision of EN ISO 15874 Parts 1, 2, 3 and 5 (PP for hot water), including the Part 3 Amendment.
The documents have been submitted FV closing 04/12/2012
WG23 - Industrial
Applications 3852
Review of EN ISO 15494 Rev (Plastic piping systems for industrial applications PB, PE and PP).
Doc under preparation for parallel vote prEN ISO/DIS.
· Liaison
CEN TC 236 GAS
prEN 12007-1 &-2 are subject to FV closing end 05/12.
Part 5 subject to informal consultation.
CEN TC 249 WG 16 Thermoplastics Welding
TC 155 is preparing an inventory of the needs for standardization in welding, butt fusion and electrofusion of PE welding systems.
Mandate M/366 –
Dangerous Substances
TC 351(Construction Products: Release of Dangerous substances) has commenced work.
Mr Peereboom Liaison report from CEN/TC 351/WG1
CE Marking: The Final Frontier!!
This topic was, for the first time, right at the start of the meeting after the normal routine reports.
With the Consultant, Mr Bedotti, Mr Amilcar Da Costa and Goncalo Asensao present it was possible to have a well-informed debate.
The concept of Cluster hENS with supporting product standards and methods of tests is now accepted.
hEN 15014 Pressure is being rewritten and configured to accommodate the product standards. This document once agreed will become the “model” for the other hEN’s.
This process should be completed end of February.
There will be a meeting in February 2013 with the CEN Consultant.
At this stage we should have a fair idea of the total new CE marking timetable. However several CEN members may still not support the expected structure!
For the first time I found that Mr Bedotti was accepting the “Cluster hEN’s” along with the products standards.
He was clear that after July 1st 2013 when the CPR takes over from the CPD that CE marking will become mandatory for these products with a harmonised standard that has been published in the Official Journal.
Products without an approved Harmonised Standard can still be placed on the market.
He was clear that other marks can be used alongside the CE Marking including Quality Marks.
The Customer can he said “specify the name of the driver of the truck if he wants to”!!!
Meaning CE marking, where possible, must be called up by the specifier / purchaser and other Marks / requirements can be used
Time scale:
Assuming that we can agree the model hEN for pressure then the other 3 hEN’s can be adapted accordingly.
We may need to change some of the standards / methods of test.
However, these would be moving requirements etc. into the Hens from the method of test or the product standard.
Given that the nature of the work is editorial then it is possible that the whole task is completed in 30 to 36 months.
Thus we are looking at CE circa 2015.
Until then we must keep our customers informed about the progress and the FACT THAT OUR PIPES AND FITTINGS CAN LEGITIMATLEY BE PLACED ON THE MARKET WITHOUT CE MARKING UNTIL OUR hENS ARE HARMONISED AND PUBLISHED IN THE OFFICIAL JOURNAL.
Watch this space. CE was due to be introduced in 1993!!
We are getting there!!
Future meetings
CEN TC 155 Plenary –
Bulgaria - Sofia 15th and 16th May 2013.
Autumn: 20th and 21st Nov 2013. No location.
Spring: 14th and 15th May or 20th and 21st May 2014.
CEN Procedures
TC Doc
This indicates that the standard is at a very early stage in its development. It is still in the hands of the WG or AHG and is not sufficiently advanced to proceed to the next stage.
prEN
This is the stage of the CEN inquiry where the documents should be available in three languages: English, French and German.
The documents are sent out to all CEN members and are subjected to an enquiry. It is then up to the Convenor to decide if the WG can take into account the comments made and if so the revised documents will be sent to the formal vote.
Formal Vote
The documents are issued by CEN for the Formal Vote, which is taken on a weighted vote basis. Editorial comments only allowed.
UAP
The document does not come out for enquiry but goes straight to Formal vote. Editorial and technical comments allowed.
If the documents pass the Formal Vote/UAP then the Member Bodies are obliged to withdraw any conflicting national standards within 6 months.
The term conflicting National Standards is very loose and only refers to standards produced by the CEN Member Body
Every EN can have a National Foreword, which gives guidance from the National viewpoint. These are drafted at prEN stage.
TCA
Voting by correspondence – applicable to TS’s.
Structure of ENs
For the Non pressure ENs the following Part numbers indicate:
Part 1 The actual standard for pipes and fittings.
Part 2 Guide to the Assessment of conformity PUBLISHED AS A TS.
Part 3 Guide to installation practice and PUBLISHED AS A TS.
For the pressure Ens the following Part Numbers indicate:
Part 1 General requirements
Part 2 Pipes
Part 3 Fittings
Part 4 Valves (if required)
Part 5 Fitness for purpose
Part 6 Installation practice WILL BE PUBLISHED AS A TS. (Except for GAS see EN 1555).
Part 7 Guide to the Assessment of conformity WILL BE PUBLISHED AS A TS.
TS Technical Specification
TC 155 originally decided to use the ENV and then the TR for all Assessment of Conformity documents.
The decision has been taken to now use the TS format and all existing TRs/ENVs for assessment of Conformity are being converted into TS’s.
The TS is a voluntary document and as such the national codes of practice or other National standards / codes DO NOT have to be withdrawn.
CEN TS are approved and published in the same way as the former ENV.
This was the last meeting of TC 155 chaired by Karl Johan Strom after chairing some 35 Plenary meetings and many ad-hoc / organised meetings with other TC Chairs, The Commission and CEN.
Karl played a major role in developing our range of standards that form the bedrock of our industry. We wish him well in the future.
Herman Renier is the new chairman of TC 155. We wish him every success in this key role for our industry. He will be our “leader” as we introduce CE marking and many of the environmental requirements for the future.