IBM DeCentralize File (DCF) Reference Table

DCF Process Rules:
•Rule 1- DCF report will transmit all IBM PNs with a logistics of BuySell (BS), DirectSource (DS) and DirectBuy (DB) and will contain the data elements when NO error is found.
•Rule 2 - DCF report will only transmit the following data when an inaccurate contract or price data is found. These errors will be reported to GCMs for correction.
•Rule 3- DCF report will only transmit the following data when a valid Price is available and Quota (Award split) is invalid. These errors will be reported to GCMs for correction
‘Y' indicates data will be included in DCF
' * ' indicates field(s) may or may not have data, until the data is corrected
Field name / Rule 1 / Rule 2 / Rule 3 / Field Description
BS / DS / DB / BS / DS / DB / BS / DS
1 / IBM PN / Y / Y / Y / Y / Y / Y / Y / Y / IBM 12 or 7 alphanumeric material part label
2 / Logistics / Y / Y / Y / Y / Y / Y / Y / Y / Purchasing method like Buy Sell, Direct Source or Direct Buy
3 / CM Name / Y / Y / Y / Y / Y / Y / Y / Y / Contract Manufacturer who requires the partnumber
4 / Council Name / Y / Y / Y / Y / Y / Y / Y / Y / IBM council name the parts belongs to
5 / Commodity / Y / Y / Y / Y / Y / Y / Y / Y / Type of part
6 / Part Desc / Y / Y / Y / Y / Y / Y / Y / Y / Technical description of the part
7 / Vendor Name / Y / Y / Y / Supplier Name who supplies the part
8 / Vendor No. / Y / Y / IBM code which represents the Supplier number
9 / Order Base / Y / Y / * / * / Contract ship on order base agreement
10 / Lead Time / Y / Y / Y / Y / * / Number of days allowed for the order to be placed to the delivery date.
BS logistics will use worst case LT.
11 / MOQ Per Line / Y / Y / Minimum order quantity Per Line Item
12 / Vendor Mult. / Y / Y / Order quantity
13 / Cancellation Terms / Y / Y / Number of calendar days to cancel an order.
‘999’ =non cancellable once POs are loaded
‘888’ = TBD
14 / Resch Terms / Y / Y / Number of calendar days to reschedule before order receive date
‘999’ =non reschedulable once POs are loaded
‘888’ = TBD
15 / Currency / Y / Y / Y / * / Type of money the price is displayed in
16 / Period 1 Price / Y / Y / Y / Current Price
17 / Period 1 Award / Y / Y / Current percent split Award
18 / Period 1 Start Date / Y / Y / Y / Y / Y / Y / Y / Y / Current Period 1 award Start Date
19 / Period 1 End Date / Y / Y / Y / Y / Y / Y / Y / Y / Current Period 1 award End Date
20 / Period 2 Price / Y / Y / Future Price
21 / Period 2 Award / Y / Y / Future Period 2 percent split Award
22 / Period 2 Start Date / Y / Y / Future Period 2 forecasted Start Date
23 / Period 2 End Date / Y / Y / Future Period 2 forecasted End Date
24 / Period 3 Price / Y / Y / Future Price
25 / Period 3 Award / Y / Y / Future Period 3 percent split Award
26 / Period 3 Start Date / Y / Y / Future Period 3 forecasted Start Date
27 / Period 3 End Date / Y / Y / Future Period 3 forecasted End Date
28 / Period 4 Price / Y / Y / Future Price
29 / Period 4 Award / Y / Y / Future Period 4 percent split Award
30 / Period 4 Start Date / Y / Y / Future Period 4 forecasted Start Date
31 / Period 4 End Date / Y / Y / Future Period 4 forecasted End Date
32 / VID Change Date / Y / Y / Y / Y / Y / Y / Y / Y / When one of the Very Important Date (VID) Keys ( IBM PN, Logistics, CM Name, Council Name, Vendor Name, Lead Time, MOQ, Vendor Mult., Cancellation Terms, Resch Terms, Period 1 Price, Period 1 Award ,C&R Desc, EOL Date ) found changed or a new add shows up, that date is placed here
33 / VID Change Description / Y / Y / Y / Y / Y / Y / Y / Y / Display VID Key changes in VID key order. See VID Change Date and Change Description next page for VID key order list.
34 / Risk Acceptance / Y / List the unqualified part with acceptance text when product is in either New Product Introduction (NPI) or System Integration Test (SIT).
35 / Cancel & Reschedule Description / Y / Y / Y / BS Logistic only - Descriptions for cancel and reschedule terms.
36 / IBM Contacts / Y / Y / Y / Y / Y / IBM contact name
37 / Contract # / Y / IBM Contract # for DS logistics only
38 / EOL / Y / Y / Y / BS and DS Logistics - End Of Life date is last buy date for supplier parts
DB Logistics – End Of Life date is partnumber EOL

VID Change Date and VID Change Description

The VID Change Description fields will highlight specific field change by displaying the character "Y" in the field position. Character "N" means no change.

Field #33 - Very Important Date (VID) Description Field position order:

1.IBM PN

2.Logistics

3.CM Name

4.Council Name

5.Vendor Name

6.Lead Time

7.MOQ

8.Vendor Mult.

9.Cancellation Terms

10.Resch Terms

11.Period 1 Price

12.Period 1 Award

13.C&R Desc

14.EOL Date

Example: VID Change Date and Change Description (Field #32 and Field #33):

VID Date VID Change Description

2008-09-25 NNNNNYYNNNNNYN

The VID Date shows a change to one of the DCF key field(s) on Sept 25, 2008. The VID Change Description field will show no changes made to key fields 1-5, 8-12, 14 and changes to field 6,7,13

The VID Date and VID change Description stays the same until next change made to one of the VID key field(s).

Page 1 of 3