SAJUL MANSOOR. K.K, , 050-7488183
CURRICULUM VITAE
PERSONAL DETAILS
ADDRESS:SAJUL MANSOOR.K.K
P.O BOX9123,
PARSONS;
Dubai, U.A.E.
Nationality:Indian
Passport No:F-2602159
Profession:QuantitySurveyor
EDUCATIONAL QUALIFICATION
- LLM in Construction Law, Adjudication & Arbitration from Robert Gorden University (RGU): 2014
- Fellow of Chartered Institute of Arbitrators(FCIArb)- Membership No: - 30635 : 2012
- Member of Royal Institution of Chartered Surveyors(MRICS)-Membership No: 1272052–2009
- Completed accredited degree for RICS Eligibility from College of Estate Management with 3 modules of BSc in Quantity Surveying - 2008
- Diploma in Civil Engineering fromState Board of Technical Education, Government of Kerala-1995
TRAININGS ATTENDED
- Completed Advanced course in Contract Administration (6 Modules) - 2010.
- Completed a course of Sound Contract Administration (10 Modules) - 2007.
- Performing as an assessor in Royal Institute of Chartered Surveyors (RICS) APC Interviews.
COMPUTER KNOWLEDGE
Spread Sheets:MS Excel
Planning: Primavera
Drafting: Auto CAD
Others:MS Word & Power Point, etc.
USED CONDITIONS OF CONTRACT / METHOD OF MEASUREMENTS
RTA – Conditions of Contract (Modified FIDIC 1987).
DIP - Conditions of Contract (Modified FIDIC 1987).
AbudhabiMunicipality - Conditions of Contract.
CESMM3: Civil Engineering Standard Method of Measurement – Edition 3.
POM (I): Principles of Measurements (International).
AbudhabiMunicipality–Method of Measurements.
PROFESSIONAL EXPERIENCE
Total 18 Years Experience in United Arab Emirates with Leading Companies, currently working in ParsonsOverseas Ltd-Dubai.
EMPLOYMENT RECORD
M/s Parsons Overseas Ltd, Dubai – Design & Supervision Consultant in Dubai.
M/s GHANTOOT Transport & Gen. Cont. Est. – Road Section,Abu Dhabi – General Contracting
M/s UTCC WADE ADAMS LLC. , Dubai- General Contracting
ASSIGNMENTS
Mar 2010 toTilldate:PARSONS De Leuw Cather Overseas Ltd.DUBAI
Position:Quantity Surveyor
Duties in general(Part of Post-Contract Commercial Team):
To evaluate Contractor’s Monthly Statements, New Rates, Variation Orders etc. Prepare Interim Payment certificate and submit to the Client. To Estimate and point out New Rates and Variation Orders such as Additional Works, Abortive works, Day works etc. To prepare Reconciliation and Recapitulation of the entire project up on client’s request. To assist to prepare statement at completion, Final certificate and evaluation of contractor’s Claims.
Assisted Claims Evaluation:
SD-0411.B.47 (DHCC):- Contractor’s Claim for Termination due the Non-payment by the Employer (Engineer’s Determination).
TRD114/1(RTA):- Contractor’s Claim for Termination by the Employer (Engineer’s Determination).
R881/2C (RTA):- Contractor’s claim for suspension/slow-down due to the Non-payment by the Employer (Engineer’s Decision).
R800/3B(RTA):- Contractor’s Claim for Temporary power supply provided by the Contractor at Taking-over stage (Engineer’s Determination).
R829/1(RTA):- Contractor’s Claim for Temporary power supply provided by the Contractor at Taking-over stage (Engineer’s Determination).
R800/3A (RTA):- Contractor’s Claim for Temporary power supply provided by the Contractor at Taking-over stage (Engineer’s Determination).
Projects-in-charge :Contract R800/3A:-Ras Al Khor Crossing, Contract – 3A
Contract R881/2C: - Comprehensive Improvements of Parallel Roads
Contract R800/6:– Improvement of Interchange No.1 @Shk Zayed Rd.
Scope of Works :R800/3A
The project R800-3A is a part of the overall Fourth Creek Crossing Scheme. This project comprises of 11 Bridges grouped into 2 major groups of interchanges which connect the new Ras Al Khor Main Road to the existing Oud Metha and 2nd Za’beel Roads. The project consists of Nearly 5 Km of 5-lane dual carriageway and related widening of existing Roads. The project also involves extensive relocation of utility services away from the Project area and into specified reservations. A 40m wide, 842m long, 8 lane dual carriageway Undepass with long 102m long tunnel section was added to the Scope of the Project as an Additional Work.
R881/2C
The project is considered as the main continued connectivity link of the West parallel to Sheikh Rashid Road where it is consequently linked to Al-Garhoud & Al Makhtoum Bridges. This consists of constructing two parallel viaducts (2-lanes each) in addition to flyover with a total length of 4.2km by using segmental bridges construction technique, while remaining 0.5 km bridges will be constructed by the conventional cast-in-situ method. The project also includes new road network / links in addition to improving the existing roads and stripping of the existing links / ramps of sheikh Rashid Road.
R800/6
The project is a component of the overall R800 Project “Ras Al Khor Crossing Corridor” and matches with R800/5 Contract on one side. It involves the construction of a major grade-separated interchange to replace the existing interchange No.1 at Shaikh Zayed Road. The new interchange involves the construction of several bridges and underpasses to allow free flow of traffic and caters for the high volume of traffic that will access new developments such as the Burj Dubai Development, BusinessBay and Dubai International Financial Center (DIFC) from Shailh Zayed Road. The bridges of this project are connected to the elevated viaducts above Doha Road that will be built as part of Contract R800/5. The existing Interchnge No.1 structure will be demolished as part of this project.
The project will also include the construction of roadway signage and pavement marking, landscaping, streetlighting, irrigation ducts, diversion and/or protection of services such as DEWA-ED, DEWA, Water, Etisalat, Sewerage, Storm Water Drainge and Irrigation Systems.
Contract Values:AED 613 Million; AED 692 Million& AED 618 Millions respectively.
Contractor:Hedley International Emirates Cont LLC & Salini Construttori SpA
Client:Roads & Transport Authority (RTA)
Nov 2009 to Feb 2010:PARSONS De Leuw Cather Overseas Ltd.DUBAI
Project:Contract – R659/11:-JumeirahLakeTowers Iinterchange (IC-5.5)
Scope of Works :R659/11
The Project is a component of the overall R659 Project “Comprehensive improvements of Sheikh Zayed Road”. This contract matches R659/10 Contract (Interchange 5) on the North side and The Garden Interchange and Interchange 6 on the south side. It includes major five leg multi level freeway to arterial interchange and three span bridges over DubaiMarinaCanal. Five elevated viaducts above Sheikh Zayed Road carrying two or three lanes of traffic in each direction will allow access to and from the Dubai Marina, Jumeirah Beach Residence, JumeirahLakeTowers, and Canal point developments. Eastern leg of the interchange will connect to the planned West Parallel Road, East Parallel Road, and further to the Emirates Ring Road. The interchange provides accommodation for the proposed alignment of the Dubai Metro Light Rail Red Link. The Service road that runs along the East side of the Sheikh Zayed Road is also part of the interchange project. Four lane bridges over DubaiMarinaCanal will provide direct access to and from Jumeirah Beach Residence development to the proposed interchange.
Contract Value:AED 525 Millions
Contractor:Dutco Balfour Beatty LLC, DUBAI
Client:Roads & Transport Authority (RTA)
Jan 2007 toSep 2009:PARSONS De Leuw Cather Overseas Ltd.DUBAI
Project:Contract – SD-0411-B.47B.48
Roads & Services for Area: 1, 2, 3, 4&5, Dubai Health Care City- Phase-2
Scope of Works :The scope of work for the awarded contracts viz, SD-0411.B.47 &
B.48 comprises the development of infrastructure facilities, within the project bounded areas. This includes basically construction of Roads and Utilities such as sewer, drainage, water, fire fighting, irrigation, telecommunication, electrical sub-stations, Underground Irrigation tank,Drainage Pumping station and Drainage Interceptor.
Contract Value:AED 255 Millions + 83 Millions (Additional Works)
Contractor:WADE ADAMS LLC, DUBAI
Client:DubaiHealthCareCity (DHCC).
Mar 2006 to Dec 2006:GHANTOOT TPT. & GEN. CONT. EST. (ROAD SECTION), ABU DHABI.
Position:Senior Quantity Surveyor
Project:Contract - 2000
Roads & Infrastructure works for Abudhabi International Shooting Club.
Nature of Work :New Construction of Roads and Parking for 18 Km , contains Earthworks, Curbstone , Interlocking Tiles , all type of Utility Ducts , Storm Water drainage System , Street Lighting/Flood Lighting, Etisalat, Irrigation, and Storm water drainage Relocation Works for 1600mm & 1800mm Lines, Underground tank and Pumping station, Landscaping as per Contours. Construction of Earth Bund, Go-cart, Moto-Cross, Sub-base Tracks & Sand Tracks. Construction of Pedestrian Under passes, Retaining Walls & Modular Blocks.
Construction, completion and Furnishing of Buildings – Substations, Gate house, garbage depot and ammunition store.
Contract Value:AED125 Millions
Consultant:WS Atkins & Partners Overseas.
Client:Abu DhabiMunicipality
Duties :Submission of JMS for approval and liaison with Consultant. Prepare BOQ for Variations, Change Orders,Monthly Progress reports &Cash Flows to the Consultant. Deal with in-house financial reports; Sub-contractors enquiries, quotationsand Prepare comparative statements & Sub contractor Payments. Preparation of New- rates, Final Change Orders, Final Measurements.
Jul 2005 to Mar 2006:GHANTOOT TPT. & GEN. CONT. EST. (ROAD SECTION), ABU DHABI.
Position:Senior Quantity Surveyor
Project:Contract - BA/2/L/2876
Road Maintenance & Rehabilitation Works for Abu Dhabiwestern Region.
Nature of WorkMaintenance & Rehabilitation Works for Roads & BridgesIncludes Junction Improvements, Bridge Repair Works, storm water Drainagefor Road Works, Street Lighting, Etisalat, Irrigation, Water and Sewerage Relocation Works.
Contract Value:AED 40 Millions
Consultant:DIWI CONSULT (EMIRATES)
Client:Abu DhabiMunicipality
Duties :Submission of JMS for approval and liaison withConsultant. To prepare BOQ for Initial Work Order’s, Monthly Progress reports & Cash Flows. Deal with in-house financial reports; Sub-contractors for enquiries, quotationsand Prepare comparative statements & Sub contractor Payments.Preparation of New-rates, Change Orders, Final Work orders, Payments.
Nov 2004 –Jun 2005:GHANTOOT TPT. & GEN. CONT. EST. (ROAD SECTION),ABU DHABI.
Position:Senior Quantity Surveyor
Project:Al Bahya Residential area Roads / Ras Ajeej -Stage (3),Contract No: 2019/3
Nature of Work:Construction of Internal Roads& R/A,including Streetlighting and Electrical distribution works; storm water drainage and water works.
Contract Value:AED 51 Millions
Consultant:ITAL CONSULT. ABU DHABI.
Client:Abu DhabiMunicipality
Duties :Submission of JMS for approval and liaison with Consultant. To prepare interim payments, Monthly Progress reports, Cash Flows. Deal with in-house financial reports; Sub-contractors for enquiries, quotations, prepare comparative statements & Sub contractor Payments. Prepare New-rates, final Change Orders, Final measurements and final payments.
Dec 2003 to Oct 2004:GHANTOOT TPT. & GEN. CONT. EST. (ROAD SECTION), ABU DHABI.
Position:Senior Quantity Surveyor
Project:Contract - BA/2/L/2560
Maintenance, Rehabilitation Works and Minor Projects for Roads & Bridges in Greater Abu Dhabi - Mainland
Nature of Work:Maintenance & Rehabilitation Works for Roads & Bridges includes junctions improvements, Bridge repair Works, S/Water Drainage; Street lighting, Etisalat Irrigation, water and sewerage relocation Works.
Contract Value:AED 60 Millions
Consultant:Hyder Consulting Middle East Ltd.
Client:Abu DhabiMunicipality
Duties:Submission of JMS for approval and liaison with Consultant. Prepare BOQ for
Initial Work Order’s, Monthly Progress reports, Cash Flows.Deal with in-house financial reports; Sub-contractors;Prepare comparative statements and Sub contractor Payments. Prepare New-rates, Final Change Orders, Final W/O & Final Payments.
Dec 2002 to Dec 2003:GHANTOOT TPT. & GEN. CONT. EST. (ROAD SECTION),ABU DHABI.
Position:Quantity Surveyor
Project:Contract - BA/2/L/2115
Maintenance,Rehabilitation Works and Minor Projects for Roads & Bridges in Greater Abu Dhabi - East Zone – II
Nature of Work:Maintenance & Rehabilitation Works for Roads & Bridges includes junctions improvements, Bridge repair Works, S/Water Drainage; Street lighting, Etisalat Irrigation, water and sewerage relocation Works.
Contract Value:AED 40 Millions
Consultant:Ace International Consulting Engineers
Client:Abu DhabiMunicipality
Duties:Submission of JMS for approval and liaison with Consultant. Prepare BOQ for
Initial Work Order’s, Monthly Progress reports, Cash Flows. Deal with in-house financial reports; Sub-contractors; Prepare comparative statements and Sub contractor Payments. Prepare New-rates, Final Change Orders, Final W/O & Final Payments.
June '2002 to Dec 2002:PAULING MIDDLE EAST EST. ABU DHABI
Position Held:Quantity Surveyor
Project:TRIP Contract -983 Multistorey CarPark in Sector E-6 and Additional Work A2-75 - Al Falah & Hazza Bin Zayed Street Widening.
Nature of Work:Multi Storey Underground Car Parking Structures with Pre-Cast Units and
screeding concrete.
Additional Works Includes Junction improvements of Al Falah Streetwith Air port Road, East Road, Baniyas Street & Salam Street(Road, Drainage, Street Lighting, Etisalat, Irrigation, WaterSewerage)
Contract Value:AED 45 Millions
Consultant:De Leuw Cather International Ltd. ABU DHABI
Client:Abu DhabiMunicipality
Duties:Submission of JMS for approval and liaison withConsultant. To prepare
Interim Payments, Monthly progress Reports, Cash Flows.Deal with in-house financial reports; Sub-contractors; prepare comparative statements & Sub Contractor Payments. Prepare New-rates, Change Orders, Final Measurements & Final Payments.
Nov 2001 to May 2002:PAULING MIDDLE EAST EST. ABU DHABI
Position Held:Quantity Surveyor
Project:Road Network in Abu Al Abyad Island
Contract-2 Asphalt & Incidental Works.
Nature of Work:125 K.M Roads inside the Island, beforeafter Boat jetty 30 KM rehabilitation Works, including roundabouts with street lighting and storm water drainage.
Contract Value:AED 31 Millions
Consultant:ITAL CONSULT. ABU DHABI
Client:Abu DhabiMunicipality
Duties:Submission of JMS for approval and liaison with Consultant. To prepare
Interim Payments, Monthly progress Reports, Cash Flows. Deal with Sub-contractors; prepare comparative statements & Sub Contractor Payments. Prepare New-rates, Change Orders, and Final Measurements & Final Payments.
Feb 2000 to OCT2001:AL NABOODAH CONTRACTING CO.LLC, DUBAI
Position Held:Quantity Surveyor
Project:R 577/4 - Dubai Ring Road Phase-1
Nature of WorkRoads and Bridge construction in Hatta- Dubai Road near Awir froots and vegetable market includes rigid pavements for truck junctions; various utilities; protection slabs for 700mm diameters Irrigation mains.
Contract Value:AED 49 Millions
Consultant:De Leuw Cather Overseas Ltd. DUBAI
Client:DubaiMunicipality
To prepare Monthly Valuations,Progress reports & Financial ReportsDeal with Subcontractors and Sub contractor Payments. To prepare final quantities and final statement.
Oct 1998 -Jan 2000:U.T.C.C-WADE ADAMS LLC, DUBAI
Position Held:Quantity Surveyor
Project:R 625 - Several Carparks in Dubai Phase-2
Nature of Work:Car Parking and surrounding Roads atLamcyPlaza,Karama Lulu Centre,
KhawaneejSchools, Egyptian Club & Construction of Umm Harrier Park in Bur Dubai.
Contract Value:AED 25 Millions
Consultant:JOUSY AND PARTNERS
Client:DubaiMunicipality
To prepare Monthly Valuations, Progress reports & Financial Reports Deal with Subcontractors and Sub contractor Payments. To prepare As-built quantities and final statement.
Aug 1997 –SEP 1998:U.T.C.C-WADE ADAMS LLC, DUBAI
Position Held:Quantity Surveyor
Project:R 572 - Roads in Nadd Al Hammar Phase-1
Nature of Work:Sector Roads in Naad Al Hammar, Widening 4km Nadd Al Hammar Road;
T-Junction; Constructionof 4 Km of Al Ramool Road.
Contract Value:AED 28 Millions
Consultant:ACER FREEMAN FOX INT'L., DUBAI
Client:DubaiMunicipality
Duties:To prepare Monthly Valuations,Progress Reports & Financial Reports.
Deal with Subcontractors and Sub contractor Payments. Prepare finalquantities and Final Payments.
Apr 1996-July 1997:U.T.C.C-WADE ADAMS LLC, DUBAI
Position Held:Quantity Surveyor
Project:DS 56/8 Drainage and Sewerage in Jumeirah and Umm Suqeim Area.
Nature of Work:Drainage Sewerage Gravity Pipe Lines in Open cut Excavation, Micro-
tunneling & thrust Boring Methods and manhole Constructions of Different types and diameters.
Contract Value:AED 56 Millions
Consultant:Khatib & Alami Consulting LTD. DUBAI
Client:DubaiMunicipality
DutiesTo Submit RFA’s of work done, Joint Measurement Sheets and Assisting monthly valuation and Monthly reports.
*********************************************
- 1 -