SECTION 23 05 55

PENETRATION SEALANTS FOR HVAC SYSTEMS

PART - GENERAL

SUMMARY

Section Includes: Include labor, materials, equipment, and accessories required to furnish and install throughpenetration firestop systems at wall, floor and roof openings.

SUBMITTALS

Instructions: Submit manufacturer's instructions for applying sealant.

Certification:

Submit manufacturer's certifications that materials meet or exceed specified requirements.

23 05 55 - 1

Penetration Sealants For HVAC Systems

MPS Master

SECTION 23 05 55

Submit documentation of manufacturer's acceptance of applicator.

Provide certification stating that sealant has been completed in full accordance with requirements to provide necessary fireresistance ratings.

Provide [(3)] [(7)] [__] copies of certified test reports of:

Fire test reports of sealant application to substrate materials shall be similar to project conditions.

Reports from reputable independent testing agencies of product proposed for use, indicating conformance with ASTM E814.

QUALITY ASSURANCE

Qualifications: Applicator shall be acceptable to sealant manufacturer.

Regulatory Requirements:

State Building Code Division

Local Codes and Ordinances

Local Authority having jurisdiction

PART - PRODUCTS

MANUFACTURERS

Acceptable Manufacturers: Subject to compliance with requirements of the Contract Documents, acceptable manufacturers are as follows:

BioFireshield, Inc.

Carborundum Company

Dow Corning Corporation

General Electric Company, Silicone Products Division

HiltiCibaGeigy

Metalines Industries

Nelson Electric, a Unit of General Signal Corporation

Rectorseal Corporation

3M Company

Tremco, Inc.

MATERIALS

Description: Penetration sealant shall be a single component ceramic fiber based putty fill, void or cavity material fire barrier caulk, putty strip, and sheet forms.

23 05 55 - 1

Penetration Sealants For HVAC Systems

MPS Master

SECTION 23 05 55

Applications: Flame Spread/Smoke Contribution shall be 0/0 in accordance with ASTM E84. Underwriters' Laboratories rated material classified for use in ThroughPenetration Firestop Systems shall be used for, but not limited to, the following:

Metal Pipe: UL rated material classified for use in ThroughPenetration Firestop System.

Pneumatic Tubing; carborundum material is not acceptable in this application.

Glass Pipe / Plastic PVC / CPVC / Polypropylene; UL rated material for use in throughpenetrations firestop system; carborundum material is NOT ACCEPTABLE in this application.

Ductwork: Vertical and horizontal ductwork passing through floors and fire rated walls shall have space between duct and sleeve filled with an approved, fire rated caulk.

PART - EXECUTION

EXAMINATION

Verification of Conditions:

Confirm compatibility of surfaces to receive sealant materials. Verify that openings are sound, clean, dry, and ready to receive application of sealants. Verify that penetration elements are securely fixed and properly located, with a minimum of 1/2inch space between penetrations and surfaces of openings. Beginning of installation means acceptance of existing conditions.

PREPARATION

General Requirements: Protect adjacent surfaces and equipment from damage. Clean contact surfaces of dirt, dust, grease, oil, loose material or other matter which may affect bond of sealant. Remove incompatible materials which affect bond by scraping, brushing, scrubbing, or sand blasting.

MOCKUP

General Requirements: Apply one seal on representative substrates onsite for each fire rating required at each type of wall, floor and roof construction. Confirm requirements of fire ratings.

Application shall be in accordance with Project requirements as to thickness and density to achieve fire rating.

Acceptance: Product and application shall be approved by governing authorities prior to continuing with the Work.

Approved mockup may remain as part of the completed Work.

APPLICATION

23 05 55 - 1

Penetration Sealants For HVAC Systems

MPS Master

SECTION 23 05 55

General Requirements: Apply sealant in strict accordance with manufacturer=s instructions. Apply sealant in sufficient thickness to achieve required rating. Pack material solidly around penetrations, and fill openings to a depth of 1inch or in accordance with scheduled fire ratings.

FIELD QUALITY CONTROL

General Requirements: Perform inspection to verify that work is in accordance with requirements. Correct unacceptable work and provide further inspection to verify that work meets requirements.

CLEANING

General Requirements: Remove excess material, drippings, and debris. Remove sealant from materials and surfaces not specifically required to be sealed.

PROTECTION

General Requirements: Protect applied sealant from damage.

END OF SECTION