PG&E performing temporary shoofly installation of Overhead Electrical Lines

Installation of temporary K-Rail along detour alignment

Installation of temporary pedestrian gawk screen

Installation of MacArthur temporary traffic signals

Closure of Existing 11th Street Bridge

Public Traffic using new temporary detour alignment

Installation of storm drain manhole No. 9

Installation of storm drain system No. 3

Removal of unsuitable materials in the WSID canal

Placement of temporary pedestrian sidewalk at N. MacArthur intersection

Placement of rock bedding for new WSID irrigation piping

Completed temporary pedestrian walkway at N. MacArthur intersection

Installation of Storm Drain Junction Structure No. 1

Installation of Storm Drain Junction Structure No. 1

Demolition and removal of existing 11th Street Bridge Decking

Demolition and removal of existing 11th Street Bridge Decking over UPRR Tracks

Demolition and removal of existing 11th Street Bridge Decking over UPRR Tracks

Demolition and removal of existing 11th Street Bridge Decking over UPRR Tracks

Demolition and removal of existing 11th Street Bridge Decking over UPRR Tracks

Placement of storm drain system No. 1

Demolition and removal of existing 11th Street Bridge Decking & Stems

Demolition and removal of existing 11th Street Bridge Decking & Stems

Demolition and removal of existing 11th Street Bridge Decking over UPRR Tracks

View from Below with existing bridge decking removed

Concrete debris being processed to remove all the reinforcing steel