APPLICATION FORM
BUILDING INFORMATION MODEL (BIM) FUNDV2 (July 2015)
INSTRUCTION
(PLEASE READ THE FOLLOWING BEFORE FILLING UP THE APPLICATION FORM)
- Applicant is to submit the BIM Fund application and get BCA in-principle approval first before committing or signing any contract with the software vendor or service provider.
- Eligibility criteria: Applicant must be Singapore-registered firm, and
Applicant must be a member of an on-going or upcoming constructionproject.
- Applicant can applyup to 3 applicationsfrom July 2015.
- Level of Support: up to 50% or 70% of the training, consultancy services, hardware and software costs. Maximum grant is $30,000 per applicant. GST is not supported.BCA reserves the right to determine the supportable items, and which discipline(s) an applicant belongs to.
- Applicant must carry out the BIM Collaboration on an on-going or upcoming local construction project with GFA not less than 5,000 sqm over at least a 6 month period.
- BIM Collaboration must involve at least 2 different disciplines from unrelated applicant firms.
- Coordinated BIM models, BIM Execution Plan Template and joint Completion Report must be submitted aspart of the claim.
- Applicant involved in the BIM Collaboration must invite BCA officer(s) to attend at least1 of the project coordination meeting.
- All fields in this form are required. Where the information is not applicable, a ‘NA” or “NIL” is necessary.
- For further clarification or queries, please contact Ms Angella Chan at DID: 6730 4540 or email:
- Please submit the duly completed application form together with the supporting documents as listed in the application form to
The conclusive terms regarding the disbursement will be sent out in the Letter of Offer and its annexes.
APPLICATION FORMBUILDING INFORMATION MODEL (BIM) FUND
BIM Reference number (For official use):______
SUBMISSION CHECKLIST
Please submit the following documents together with the other firm(s)' application form and supporting documents (same as below).
a. Application form;
b. Quotations (such as training, software, hardware and consultancy service);
c. Consultancy scope;
PART 1 – APPLICANT’S DATA
Firm Name: / UEN/ BOA/ PEB Number:
Correspondence Address: / Block / Building Number / Street Name
Unit Number / Building Name / Postal Code
Contact Person: / Designation:
Email Address: / Office/Mobile No:
PART 2 – COLLABORATION PARTNER (Please indicate your collaboration partner)
1.
2.
3.
4.
5.
PART 3 – COST BREAKDOWN (excluding GST)
PART 3A: TRAINING COURSE
Name of Training Course
Number of Trainees / Total Training Cost
PART 3B: CONSULTANCY SERVICE
Name of Service Provider
Duration of Service / Total Consultancy Cost
Part 3C: HARDWARE
Type of Hardware
Number of Hardware / Total Hardware Cost
PART 3D: SOFTWARE
Name of Software
Number ofLicenses / Total Software Cost
PART 4 – PROJECT INFORMATION
Project Reference No.
(e.g. A1234-00001-2011)
Project Title
Estimated Project Size (GFA)
Project role of applicant
(please tickonly ONE box) / Architect / C&S Consultant / M&E Consultant
Main-Contractor / Sub-Contractor / Others:______
PART 6 – DECLARATION BY APPLICANT
By submitting this application, I affirm that the information set forth in it is true and complete.
I have not made any form of payment to any supplier/service provider engaged for this project prior to the approval of this application.
I have not applied, received or will be receiving any other tax/financial incentives for this project.
I have not been investigated for, or charged by official public authorities with any of the following in the last 5 years:
a) Breaches of the laws and regulations (both in home country & foreign jurisdictions)
b) Private litigation suits (e.g. employee suits, third party liability suits)
I understand Building and Construction Authority (BCA) reserves the right to reject any application without assigning any reason.
Signature with
Company
Stamp/Chop
Only the sole proprietor, partner or director of the Applicant, as registered with ACRA or professional bodies, may sign this declaration. / Name (Mr/Ms/Mdm/Dr) (As in NRIC)
Designation / Date
Application Form for BIM Fund V2 as of July 2015