IMPORTANT INFORMATION FOR ALL PATIENTS AND VISITORS TO THE REGIONAL REHABILITATION CENTRE
WELLINGTON AND BIRGE STREETS TO BE CLOSED TEMPORARILY AS OF MONDAY, JULY 18
As of Monday, July 18, the City of Hamilton will begin a four-month water main and sewer project on:
- Wellington Street North (from Barton Street East to Ferrie Street)
- Birge Street (from Wellington Street North to Victoria Avenue North).
What does this mean?
We are sharing this information with you so that you can plan ahead if you have an appointment or if you are visiting someone at the Regional Rehabilitation Centre. We anticipate that there will be traffic delays as Wellington and Birge Streets are closed for this work.
You should allow extra time for parking and for getting to your destination at the Centre.
Where can I park and how do I access the Centre?
Drop off area and parking for patients and visitors with disability
A temporary roadway off of Copeland Avenue will be available for patients and visitors with disability who need to access the Centre and the Accessible parking area.
Directions:
- Travel north on Victoria Avenue
- Turn left (west) on Copeland Avenue (between the hospital and Victoria Parking Ramp) and then follow the road to the right as it approaches Wellington.
- This will take you to the main entrance of the Centre on Wellington
- From here, you will also be able to proceed to the accessible parking lot located adjacent to the Centre on Birge Street. When exiting, you will have to take the temporary roadway back to Copeland.
This roadway will be in place until Birge reopens in mid-September.
Victoria Avenue Parking Ramp - Access to this parking lot will NOT be affected. You may park in this ramp, exit at level B and walk along Copeland to the Rehabilitation Centre. Accessible parking is also located on level B. Please note that you will not be able to turn left on Birge Street when exiting the ramp. You will ONLY be able to turn right on Birge or proceed North on Victoria Avenue.
Wellington Avenue Parking Lot - Visitor parking will NOT be available.
Barton Street Parking Lot - Located just west of the hospital, east of Ferguson on Barton. You can enter and exit this lot from Barton Street. There are no pay stations on this lot but, you can pay at a machine in the Rehab building, or by credit card at the exit.
Individuals traveling to the Centre via Burlington Street should turn left at Wentworth Street (instead of Wellington), and then right on Barton .
For those traveling by bus to the Centre, please use the Barton and Victoria bus stop.
Additional details about the road closures
Wellington Street North
- There will be lane restrictions on Wellington Street as of July 18 for four months (until approximately the end of November.) During most of that time, one lane will be open but, sometimesall lanes will be closed.
- The pedestrian sidewalks on either side of Wellington will NOT be available.
Birge Street
- Birge will be completely closed for approximately seven weeks as of July 18th, 2011 (until approximately mid-September.)
We are working alongside representatives from the City and the project contractor to manage the disruption that this work will have on our neighbourhood.
Our goal is to keep you informed about what is happening to ensure that you are able to park and get to your appointment on time or visit your loved one.
If you have any questions, please speak with your care provider.
Thank you for your patience.