USDA-NRCS SD-ENG-19 REV. 04/2012 Page 1 of 2
CONSTRUCTION INSPECTION REPORT
(Survey Notebook)
Owner / DateStr. / Weather
Location / Farm ID
Inspector
Narrative:
USDA-NRCS SD-ENG-19 REV. 04/2012 Page 1 of 2
CONSTRUCTION INSPECTION REPORT
(Survey Notebook)
Owner / DateStr. / Weather
Location / Farm ID
Inspector
Narrative:
USDA-NRCS SD-ENG-19 REV. 04/2012 Page 2 of 2
REMINDER LIST - INSPECT PRACTICES: ------
Earth Dams Drop Structures Grassed Waterways
Clearing Concrete Grading & Shaping
Earth Fill Timber Seeding
Excavation Pipe
Concrete Earth Fill Canals & Ditches
Principal Spillway Earth Excavation Grading & Shaping
Pipe Lining
Covered Drains Dugouts
Fence Earth Excavation Land Leveling
Spillway Grading & Shaping
Open Drain
Tile Drain Earth Excavation Terrace & Diversion
Covered Drains Grading & Shaping
REMINDER LIST - INSPECT ELEMENTS: ------
Clearing Grading & Shaping Spillway Inlets
Adequacy Cross-Section Footing
Refuse Disposal Slopes Trash Rack
Finish Anti-Vortex Device
Earth Fill Gates
Foundation Stripping Pipe
Core Trench Trench Fence
Compaction Placing Alignment
Moisture Control Alignment Construction
Side Slopes Joints Gates
Cross-Section Bedding Bracing
Finish Backfill
Buried Pipe Line
Earth Excavation Covered Drains Alignment
Cross-Section Depth Joints
Depth Alignment Bedding
Bottom Width Filter Material Appurtenances
Berms Blinding Cover
Side Slopes Tile Quality Backfill
Spoil Disposal Manhole/ Inspection Box Pipe Quality
Outlets
REMINDER LIST - INSPECT MATERIALS: ------
Timber Concrete Metal
Material Grading Aggregate Corrosion Protection
Treatment Batching & Mixing Section
Fastening Consistency Gage
Hardware Conveying & Placing
Reinforcing Steel Other Materials
Forms Type
Joints Weight
Coring
Finishing
USDA-NRCS SD-ENG-19 REV. 04/2012 Page 2 of 2
REMINDER LIST - INSPECT PRACTICES: ------
Earth Dams Drop Structures Grassed Waterways
Clearing Concrete Grading & Shaping
Earth Fill Timber Seeding
Excavation Pipe
Concrete Earth Fill Canals & Ditches
Principal Spillway Earth Excavation Grading & Shaping
Pipe Lining
Covered Drains Dugouts
Fence Earth Excavation Land Leveling
Spillway Grading & Shaping
Open Drain
Tile Drain Earth Excavation Terrace & Diversion
Covered Drains Grading & Shaping
REMINDER LIST - INSPECT ELEMENTS: ------
Clearing Grading & Shaping Spillway Inlets
Adequacy Cross-Section Footing
Refuse Disposal Slopes Trash Rack
Finish Anti-Vortex Device
Earth Fill Gates
Foundation Stripping Pipe
Core Trench Trench Fence
Compaction Placing Alignment
Moisture Control Alignment Construction
Side Slopes Joints Gates
Cross-Section Bedding Bracing
Finish Backfill
Buried Pipe Line
Earth Excavation Covered Drains Alignment
Cross-Section Depth Joints
Depth Alignment Bedding
Bottom Width Filter Material Appurtenances
Berms Blinding Cover
Side Slopes Tile Quality Backfill
Spoil Disposal Manhole/ Inspection Box Pipe Quality
Outlets
REMINDER LIST - INSPECT MATERIALS: ------
Timber Concrete Metal
Material Grading Aggregate Corrosion Protection
Treatment Batching & Mixing Section
Fastening Consistency Gage
Hardware Conveying & Placing
Reinforcing Steel Other Materials
Forms Type
Joints Weight
Coring
Finishing