Foresters – Details For Online application (Affor)
Applicant Details
Name: ______FO number:______
Application Details (Step 1 of 7 iNET data entry)
Scheme Type:AfforestationForest Road
6” OS Sheet Map No: ______(e.g. LD10)
Approval Type: Approval and Grant Approval Only
Ownership Details (Step 1 of 7 iNET data entry)
Ownership: Owner Part Owner Lease
Commonage JMC Partnership Permission from owner
Occupation:FarmerPart Time FarmerNon Farmer
Corporate BodyPublic AuthorityOther
Total Size:Less than 3 hectares 3 hectares or more
Partnership Details: ______
Constraints of Ownership:
TurbaryRight of way Grazing None
Present Use:Agricultural Non-Agricultural
Dept. NumbersHerd No.______REPS/AOS/GLAS No. ______
Other No.______
Economic Activity:Growing of non-perennial crops
Growing of perennial crops
Plant propagation
Animal production
Mixed farming
Support activities to agriculture/post-harvestcrop activities
Hunting trapping and related service activities
Silviculture and other forestry activities
Logging
Gathering of wild growing non-wood products
Support services to Forestry
Other
Other (description): ______
Type of Business:SMELarge Company
Beneficiary Declaration:YesNo
Silvicultural Considerations(Step 2 of 7 iNET data entry)
Conditions / Yes / NoSuitable for 10% Broadleaf Afforestation?
If so, does the Broadleaf area meet the minimum width criteria?Will at least 10% of the total conifer area be a conifer species other than Sitka Spruce/Lodgepole Pine and/or at least 10% of the total area be comprised of suitable broadleaves (rule does not apply where plantations consist of GPCs 5, 6,7 and 8 only)
Is the site prone to flooding?
The site is free of shell marl or highly calcareous soils?
If the site is prone to flooding or has highly calcareous soils, or No is selected for any of the other questions , please enter details below: ______
______
______
Site Details(Step 2 of 7 iNET data entry)
County: ______DED:______
Townland:______Nearest Village:______
Elevation (m): ______to ______
Site Area (ha):______
Land status:EnclosedUnenclosed
Site Access: Yes - Adequate Access No - Inadequate Access Permission to Use
Soil Type:MineralPeatOther
Exposure:Exposed Moderately Exposed Not Exposed
Aspect:North SouthEastWest Neutral
Vegetation Type:GrassGrass/RushSedge rush
Bracken/BriarMollina/CallunaFurze
Eriophorum/HeatherScrub/Laurel/Rhodo Other
Plot Details (Step 3 of 7 iNET data entry)
Plot No / Area / GPC / Land use / Mixture Type / ABE Plot(Yes/No) / Species / Species % / Yield Class / Exclusion Type / Exclusion Area
Total
Plot No = Number from 1 to n
Area = Area of plot (ha)
GPC = Grant Premium Category(1 – Unenclosed)
(2 – Sitka Spruce/Lodgepole Pine)
(3 – 10% Diverse Mix)
(4 – Diverse)
(5 – Broadleaf (except Oak and Beech))
(6 – Oak)
(7 – Beech)
(8 – Alder)
`(9 – Native Woodland Establishment (Scenarios 1-3))
(10 – Native Woodland Establishment (Scenarios 4))
(11 –Agroforestry)
(12a –Forestry for Fibre)
(12b –Forestry for Aspen)
Land use = CHF/BHF/BCF/MHF/Burned/Blown/Felled/Bio
Mixture type = Pure/Row/Integrated Mix/Block/Groups/None
Species = Enter Species name
Species % = Enter species % making up the plot from 1 to 100%
Yield Class = Notional Yield Class for species productivity
Exclusion Type = U/P/Rock/Water/P-Forest/N-Forest/Building/ROW/Turb/Graz/W-Mains/Road/Other
Exclusion Area = Area (ha)
Environmental Considerations(Step 4of 7 iNET data entry)
Considerations / Yes / No / Report Required Yes/No1.0 / Does the proposed afforestation project involve an area of 50 hectares or more? If yes the application must be accompanied by an Environmental Impact Statement
1.1 / Is the area designated potentially acid sensitive by the Department?
1.2 / Is the area greater than 5 hectares and sensitive for Fisheries?
1.3 / Is the area greater than 40 hectares and non-sensitive for Fisheries?
1.4 / Is the area greater than 10 hectares and within a catchment area of Local Authority designated water scheme?
2.1 / Is the area within an NHA, pNHA, SAC, SPA, or National Park? Specify Site Code(s).
2.2 / If the area is within a NHA, is a completed Notifiable Action Form/Action Requiring consent Form (consent from National Parks and Wildlife Service) included?
2.3 / If the area is within a Hen harrier SPA, will operations occur between the 1st of April and the 15th August inclusive?
2.4 / Is the area within a NPWS referral zone for NHA, pNHA, SAC or SPA?
2.5 / Is the area within 3km upstream of an NHA, pNHA, SAC, SPA, or National Park? Specify Site Code(s).
2.6 / Is the area within a Freshwater Pearl Mussel 6km zone? If YES, the Forestry and Freshwater Pearl Mussel Requirements Forms A and B should be included in the application
2.7 / Is the area within a Freshwater Pearl Mussel catchment?
2.8 / Does the area contain a current REPS plan habitat?
3.1 / Does the area contain an archaeological site or features within intensive public usage?
3.2 / Does the area contain or adjoin a listed archaeological site or monument?
4.1 / Is the area within a prime scenic area in the County Development Plan?
4.2 / Are there any other High Amenity Landscape Considerations?
5.1 / Is the area greater than 25 hectares?
6.0 / Other Environmental considerations? (describe over)
If Yes answered above specify: ______
______
______
Acid Sensitive Test Results(Step 4of 7 iNET data entry)
OS Map No. / Date / Result mg CaCo3 per ltrFebruary
March
April
May
Drainage survey Results: RequiredSubmitted
Soil Analysis:RequiredSubmitted
Did you notify the Forest Service District Inspector in advance of the exact location time and date of samples to be taken for CaCO3? Yes No
Additional Information (Step 4of 7 iNET data entry)
EIS (Environmental Impact Statement) Submitted?
Operational Proposal Details(Step 5of 7 iNET data entry)
Ground Preparation:Woody Weed RemovalMole Drainage
RippingMounding
Pit PlantPloughing
OtherOther Details______
Standard Stocking and spacing:Yes No Details______
Planting Method:Angle NotchPitMachine
SlitOtherOther Details______
Fertilizer:Zero250kg GRP 350kg GRP Split Application
OtherOther Details______
Drainage: RequiredNotRequired Drainage Comment ______
Firebreaks/ Res:RequiredNot Required
Road Access:ProvidedRequired
Weed controls:Yr 0Yr 1 Yr 2Yr 3Manual
HerbicideHerbicideHerbicideHerbicide
Fencing Details(Step 6of 7 iNET data entry)
Stock_____ mtrs
Stock - Sheep_____ mtrs
Stock - Rabbit_____ mtrs
Upgrade to Deer_____ mtrs
Deer - Rabbit_____ mtrs
Deer_____ mtrs
Upgrade existing fence: Yes No
Upgrade Details ______
1 of 5
iNET online Form 1 - Affor Scheme – Re Jan 2017