COMPLETION/FINAL REPORT

TITLE OF THE PROJECT

Name of the Principal Investigator

Name of the Co-Principal Investigator

Overseas cooperating Scientists/Organization

Project Duration: __ years

From .. To

Total Cost: Rs. Million

Expenditure during the Reporting Period: Rs. Million

Funded by: Endowment Fund Secretariat

UNIVERSITY OF AGRICULTURE PESHAWAR

FINAL/COMPLETION REPORT

Project Identification No.

Reporting period

From / To
Day / Month / Year / Day / Month / Year

1.Project Title:______

2.Name of Principal Investigator: ______

Institution/Organization: ______

Postal Address: ______

Telephone: ______Fax: ______E-mail: ______

3.Name of Co-Principal Investigator: ______

Institution/Organization: ______

Postal Address: ______

Telephone: ______Fax: ______E-mail: ______

4.Overseas cooperating Scientists/Organization:

Name:______

Institution/Organization: ______

Postal Address: ______

Telephone: ______Fax: ______E-mail: ______

5.Project Duration (months): ______

6. Project Cost (Rs. in million):______

Total Release: ______Expenditure:______

7.Expenditure:

Total Release: ______Expenditure:______

8.Objectives: ______

9.Executive Summary:______

10.Detailed Progress Report (for the Entire period of the project):

i. Statement of Problem: ______

ii. Experimental Procedure/ Design: ______

iii. Results and Benefits: ______

iv. Technology Transfer activities: ______

v. Summary of Results: ______

vi. Conclusions:______

vii. Publications/Patent Applications:______

viii. Graduate Students/Degrees:______

ix. List of Scientists Involved in this Project: ______

x. National/International Linkages Developed:______

11.Need for Additional Research: ______

12.Bottlenecks/Constraints:Be Specific.

13.Literature Cited:

14. Brief report of the entire project that can be published for general understanding of the non-technical readers (one page).

Principal Investigator
Name: ______(Seal and Signature) Date: ______ / Co-Principal Investigator
Name:______
(Seal and Signature)
Date: ______
Head/Authorized Officer of Dept./Inst./Organization
Name: ______
(Seal and Signature)
Date:______
Director, ORIC
Name: ______
(Seal and Signature)
Date:______

GUIDELINES FOR COMPLETION/FINAL (TECHNICAL) REPORT

Final/Completion reports are considered as public information; therefore, a good final report is essential to indicate the successful completion of a project. The report should be prepared as to provide a complete and logical story of the accomplishments including the project objectives and significance of the results obtained. Data obtained during the early years of the project should be evaluated in the light of later experiments, to ensure that no important points have been overlooked or given improper emphasis in earlier reports. The guidelines to fill the format of Final/Completion report are as under:(The PIs should also have a look on the evaluation proforma for the completion report to be filled by experts)

Title Page: The Outer cover (follow the format given at the end)

The following information (1 – 7) should be tabulated on the first page.

  1. Project Title
  2. Name of the Principal Investigator
  3. Name of the Co-Principal Investigator
  4. Overseas cooperating Scientists/Organization
  5. Project Duration
  6. Total Cost
  7. Expenditure during the Reporting Period
  1. Objectives: As in Project Proposal/Inception Report
  1. Executive Summary:A clear and concise statement in easy language, including an explanation of the problem and results achieved during the report period may be given on a separate page.
  2. Detailed Progress Report (for the entire period of the project):This section of the report should be prepared in a style similar to scientific papers for publication, except that it should contain more substantiating data and other details than would normally be sued in such a publication. The detailed report should consist of the following:
  3. Statement of Problem: A concise statement of the problem, a brief summary of previous knowledge and specific objective to be achieved during the report period.
  4. Experimental Procedures/design: The procedure/methodology used during the report period should be described. There is no need to give every individual experiment or the routine techniques where identifications by name or reference would be sufficient. If new procedures have been developed, old procedures modified or unusual measurements or calculations made, these should be described with sufficient details to enable other trained scientists to conduct similar experiment. In case new or modified equipment has been developed, its detailed description, preferably with drawings, should be included.
  5. Results and Benefits: The accomplishments made during report period in achieving the project objectives should be described along with pertinent data. The benefits of the accomplishments must also be described.
  6. Technology Transfer: Give detailed report of all activities and events, (Farmer days/meeting, Demos, Exhibitions, training, etc), conducted for Technology Transfer during the period under report
  7. Summary: A summary of results highlighting the significant achievements and impact/outcome of the technology transfer activities may be stated.
  8. Conclusions: A brief statement of one or two paragraphs, describing the conclusions drawn from the data collected/results achieved, should be given.
  9. Publications/ Patent Application: All publications resulting from this project may be listed by giving exact title, authors, journals, volume, page number and date following Author-Year-Title-Source System. Whether the manuscripts and reprints have been submitted/ accepted for publication patent applications filed/ to be filed may also be identified.
  10. Graduate Students/Degrees: Indicate whether the research fellows/students involved in this project were registered for M.Sc./M. Phil./Ph.D. degrees. If so, the topic of their thesis along with copy of their Registration Certificate may be provided. Copy of the thesis based on the project result must be submitted to Endowment Fund Secretariat.
  11. List of Scientists Involved in this Project: Scientists and other personnel who have been actively involved in this project along with percentage of their time devoted during the report period may be listed here.
  12. National/International Linkages Developed: A brief outline of National/International Linkages developed during the reporting period may be described.

11. Need for Additional Research: Any phase of the project on which further research work is desirable, including observations on work which could not be pursued, be identified.

12.Bottlenecks/Constraints: Brief and Specific for Consideration.

13.Literature Cited: All the references cited in text should be enlisted in alphabetical order following Author-Year-Title-Source System.

14.Brief report of the entire project that can be published for general understanding of the non-technical readers (one page).A one page brief of the project is required that should be easy to understand the project activities and outcome for the understanding of general/non-techniocal readers.

The report should be signed by Principal Investigator, Co-Principal Investigator, Director ORIC and Institutional Head or a person authorized on his behalf.

Note:

Table of Contents: The report should contain a Table of Contents along with page numbers.

Paper Size: Report be prepared on 8 ½ x 11 ¾ (A-4) size paper typed recto-verso in 1 ½ space.

Copies Required: Six (6) copies of Final/Completion Report(Both hard + soft)should be submitted to the EFS, UAP.

EVALUATION OF PROJECT COMPLETION REPORT

Reporting period

From ______to ______

Project Title:
Name of PI:
Institution/Organization:
Project duration:
Parameters for evaluation. Please give your comments/remarks against each and also indicate deficiency, if any.
Sr.# / Parameters / Remarks
A. Activities committed / Activities carried out
Year 1
Year 2
Year 3
B. Methodology committed / Methodology carried out
1
2
3
C. Objectives set / Objectives achieved
1
2
3
Overall assessment (a paragraph, use additional sheets if required):
Project rating: A = Progress Excellent B = Progress Good
C = Progress Satisfactory D = Progress Un-satisfactory
Project is rated as ______
Future recommendations (if any):
Name of the Evaluator: