Date of Request:

OCCUPATIONAL AND ENVIRONMENTAL SAFETY OFFICE

ASBESTOS AND LEAD BASED PAINT SURVEY REQUEST

FROM: FPDC Facilities Planning Design and Construction

E&O Engineering and Operations

OUA Office of University Architect

FMD Facilities Management Department

1.  Project Name:

2.  Project Manager:

3.  Project Work Order Number:

4.  Project Location:

5.  Project Start Date:

6.  Project Completion Date:

7.  Drawings Provided? Yes No

8.  Project Description:

9. Asbestos Locations to check: 10. Lead Based Paint Locations to check:

Floor (under carpet) Fire Doors Interior walls All interior components

Above ceiling Equipment Exterior walls All exterior components

Ceiling AHV Interior windows Other (specify)

Walls (Panels, Covering) Ductwork Exterior windows

Pipes Other (specify) Interior trim

Crawlspace Exterior trim

11.  Asbestos/Lead Identification and Estimated Cost:

12.  Air Monitoring Estimated Allowance for Asbestos Removal:

Inspector Signature: Date:

Project Manager Signature: Date: