Design Build Projects

Design Build Projects

October 2013 CTB Meeting

DESIGN BUILD PROJECTS

0035-087-112, PE101, RW201, C501, B604Southampton County

The project is located on Route 35 (Meherrin Road) west of the Town of Courtland. The purpose of the project is to replace the existing structurally deficient bridge over the Nottoway River with a new two lane bridge and limited roadway approach work. The project is just west of the Southampton County Line. The project is approximately 0.3 miles in length. The Design-builder is permitted to fully close the Meherrin Road in the immediate proximity to the existing bridge for a period not to exceed 365 calendar days.

The anticipated scope of work to be performed by the Design-Builder will include, but not be limited to, the design and construction of the following:

  1. New bridge construction
  2. Roadway improvements to the approaches to the new bridge
  3. Demolition and removal of the existing bridge
  4. Right of Way acquisition
  5. Drainage
  6. Storm Water Management
  7. Signing and pavement markings
  8. Erosion and sedimentation controls
  9. Utility relocations
  10. Transportation Management Plan

Final Completion November 23, 2015

6007-053-133, R201, C501 Loudoun County

The purpose of this project is to improve safety and operations by constructing a westbound truck climbing lane for heavy vehicles climbing the steep grade and to provide additional safety and operational improvements within the Project limits, including at the two interchanges. The project limits are from the interchanges of West Market Street and Route 7 and Route 9 and Route 7. The project length is 2.6 miles. The project includes construction of a westbound truck climbing lane on Route 7 between the West Market Street and Route 9 interchanges, new roundabouts and ramp improvements at the Route 7/Route 9 interchange, additional turn lanes at the Route 7 and West Market Street interchange, relocation of the Washington and Old Dominion (W&OD) Trail at the Route 7 and Route 9 interchange, construction of an underpass beneath the Route 7 eastbound on-ramp, modifications beneath the existing Route 9 bridge over Route 7 to accommodate the trail relocation beneath the bridge, modifications to the median crossovers, ingress, and egress at various locations within the project limits, and construction of a local subdivision street to improve access management.

The Project shall include, but not be limited to, the following elements:

(a)Final Design

(b)Right of way acquisition & utility relocation

(c)Road construction

(d)Lighting

(e)Drainage

(f)Stormwater management facilities

(g)Signing and pavement marking

(h)QA/QC

(i)Media and public relations

(j)Traffic management plan

(k)Erosion and sediment control

Final Completion October 22, 2015

October 17, 2013 CTB Meeting

Design-Build Project Narrative

0003-023-107, P101, R201, C501Culpeper County

This project improves safety by widening Route 3 from a two lane undivided highway to a four lane divided highway. This is the final section of the Route 3 corridor to be widening to four lanes. The project will begin approximately 4.1 miles east of Route 29 and extends to approximately 3.8 miles west of the Culpeper County and Orange County line. The project length is approximately 5.16 miles. The Project consists of the design and construction of a four lane divided highway with graded shoulders and appropriate turn lanes. The Project was procured as a two phase design build project.

The Project shall include, but not be limited to, the following design and construction elements:

(a)Roadway

(b)Structures and Bridges

(c)Milling and overlay of existing pavement

(d)Survey

(e)Geotechnical investigation

(f)Erosion and sedimentation control

(g)Hydraulics and storm water management facilities

(h)Retaining walls

(i)Right of way acquisition & utility relocation

(j)Traffic control

(k)Signing and pavement marking

(l)QA/QC

(m)Traffic management plan

(n)Public involvement/relations

Completion May 4, 2017