Deployment form MPD1
The Environmental Permitting (England and Wales) Regulations 2016
SR2010No11 Mobile plant for treatment of waste to produce soil, soil substitutes and aggregates

Deployment Form MPD1

Please read the guidance notes for MPD1 before filling in this form. This form may only be used for deployments to treat soil, soil substitutes and aggregates where the operator holds a standard permit referring to Standard Rules SR2010No11.

Section A Your organisation

A1 Contact details

A1.1 Your customer number (if applicable)

Customer number

A1.2 Contact details for this deployment

(the person we can speak to about the details supplied with this form)

Name
Organisation
Position
Address 1
Address 2
Address 3
Post code
Phone number(s) / Office:
Mobile:
Email

A1.3 What is your preferred method of correspondence? (please tick one)

 e-mail

 post

A2 Your permit details

A2.1 Permit under which this deployment is taking place

Permit number

A2.2 Nominated competent person

(the person who will be responsible for compliance with the permit for this deployment - see guidance for further details)

Name
Organisation
Position
Address 1
Address 2
Address 3
Post code
Phone number(s) / Office:
Mobile:
Email

Section B Deployment details

B1 Risk assessment

B1.1 Is the site within 500m of a European Site, Ramsar or Site of Special Scientific Interest (SSSI)?

 Yes – your site specific risk assessment must include how you will ensure your activities do not impact on these sites.

 No – I am using the generic risk assessment for SR2010No11

B1.2 Is the site within a groundwater source protection zone (SPZ) 1 or 2?

 Yes – go to B1.3

 No – I am using the generic risk assessment for SR2010No11 (now go to B2)

B1.3 Do you intend to store and treat wastes from table 2.2 of the Rules?

Yes – go to B1.4

 No – go to B2

B1.4 Do you intend to store and treat these wastes on an impermeable surface?

Yes

No – you must submit a site specific risk assessment that demonstrates that the risk to groundwater can be controlled using alternative measures.

B2 About the land where the waste operation will be carried out

B2.1 General address

Address 1
Address 2
Address 3
Post Code
12-Figure Grid
Reference / e.g. AB 12345,12345

B2.2 You must provide a location map outlining the area of land where the treatment will take place. (You must include the details listed in the guidance).

 Location map in accordance with guidance attached.

B3 Occupancy details

B3.1 Are you the occupier of the land?

 Yes - please go to B4

 No - Please give the details of the land owner or main occupier (e.g. tenant)

Name
Organisation
Position
Address 1
Address 2
Address 3
Post code
Phone number(s) / Office:
Mobile:
Email

B3.2 Do you have the occupants consent to carry out the activity?

Yes - Please go to section B5

No - Please give details below why you can carry out this operation without the consent of the occupier.

B4 – Checklist of supporting documents

If you don’t provide us with all the information we need, we won’t be able to assess your proposal and the deployment may be rejected.

Please tick and complete as appropriate, enter N/A if not applicable

Map

 Location map (required for all deployments)

Document reference number(s)

Risk assessment

Site specific risk assessment (required for all deployments within 500 metres of a European Site, Ramsar or SSSI or within a SPZ 1 or 2.

Document reference number(s)

SR2010No11 Generic risk assessment used

Fee (please see published annual charging scheme and guidance for fee)

Fee enclosed (full fee required at first deployment)

No fee (already paid)

SECTION C – Declaration

Please read through the following information before ticking the box in the declaration section below

The information provided will be processed by Natural Resources Wales to deal with your notification, to monitor compliance with the permit conditions, and for maintaining the relevant public register(s).

We may also process and/or disclose it in connection with the following:

- offering/providing you with our literature/services relating to environmental matters.

- consulting with the public, public bodies and other organisations (e.g. Health and Safety Executive, local authorities, emergency services, DEFRA on environmental issues).

- carrying out statistical analysis, research and development on environmental issues.

- providing public register information to enquirers.

- investigating possible breaches of environmental law and taking any resulting action.

- preventing breaches of environmental law.

- assessing customer service satisfaction and improving our service.

- responding to requests for information under the Freedom of Information Act 2000 and the Environmental Information Regulations 2004, where the Data Protection Act allows.

Individuals have a right to see the information we hold about them. We will correct it if it is inaccurate.

We may pass it on to our agents/representatives to do these things on our behalf.

You should ensure that any persons named on this form are informed of the contents of this data protection notice.

Disclosing information you provide to us in this notification

We will place some of the information from your notification on the public register

- your name;

- where the activity is taking place; and

- details of the activity.

Declaration

The notification contact must tick the declaration section. The notification contact must be the operator or their agent.

A person knowingly or recklessly making a statement which is false or misleading in order to obtain a registration (for himself or another person) commits an offence under regulation 38 of the Environmental Permitting (England and Wales) Regulations 2016.

If you make a false or misleading statement –

- we may prosecute you; and

- if you are convicted, you are liable to a fine or imprisonment (or both).

 / I declare that the information provided both on the form and in the supporting documentation which has been supplied with this form is correct.

Deployment form MDP1- version 3, January 2017 Page 1 of 5