1
DATEWATERPROOF INSULATED PANEL WATERPROOFINGPAGE 01
PROJECT: SECTION 001
1 WATERPROOFING
1.1 SUBMITTALS
1.1.1 Product Data: Include physical properties of the specified materials and explanations aboutproduct installation, including installation techniques, restrictions, limitations and manufacturerrecommendations.
1.1.2 Warranty: Certification that all components of the waterproofing assembly are being supplied andwarranted by a single manufacturer. Provide a specimen warranty from the manufacturer that includes all components of the waterproofing installation.
1.1.3 Shop Drawings: Include details for all assemblies. These should include details for walls, curbs,drains, penetrations, edges and expansion/control joints. Include installation details forwaterproofing, flashing, fastening and insulation as applicable.
1.2 QUALITY ASSURANCE
INSTALLER QUALIFICATIONS
1.2.1 The installer shall demonstrate its qualification to perform the work of this section by providingwritten evidence from the manufacturer.
MANUFACTURER QUALIFICATIONS
1.2.2 Shall have a minimum of 30 years experience manufacturing waterproofing membrane systems.
1.2.3 Shall submit a current copy of their ISO 9002 manufacturing certification for the plant wherematerials will be manufactured and shipped from. Additionally, the sequential production log and theISO 9002 production control record documents shall accompany the material shipment and made apermanent part of the job record and warranty file.
1.3 MOCK UP:
1.3.1 Provide a mock-up for evaluation of surface preparation techniques and application workmanship.
1.3.2 Do not proceed with remaining work until workmanship is approved by Architect.
1.4 PRE-INSTALLATION CONFERENCE
1.4.1 Convene no less than five days prior to commencing Work at a time and location to bedetermined.
1.4.2 All parties responsible for Work of this section shall be required to attend including the Architect,Builder, Contractor and any other trades affected by the waterproofing work.
1.4.3 All outstanding issues shall be noted in writing designating the responsible party for follow-upaction and the timetable for completion.
1.4.4 Application of waterproofing system shall not take place until all outstanding issues are resolved
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver materials in original unopened containers of packaging clearly labeled withmanufacturer's name, brand name and all identifying numbers.
1.6 QUALITY CONTROL
1.6.1 Inspection: At a minimum, inspections shall be required at start-up and at intervals ofapproximately 30 percent, 60 percent and 90 percent completion. A final inspection shall berequired.
1.6.2 Warranty shall be issued upon approval of the installation.
1.6.3 A final inspection report from the Technical Representative, certifying that the waterproofingsystem has been satisfactorily installed according to the project specifications, approved details andgood general waterproofing practice, shall be provided.
1.6.4 At all times, the contractor shall permit and facilitate access to the site by the manufacturer'srepresentative.
1.7 SITE PROTECTION
1.7.1 During waterproofing work, exposed surfaces of finished surfaces shall be protected to prevent damage. Contractor shall assume full responsibility for any damage.
1.7.2 The Contractor shall provide for adequate protection of the installed membrane preventingdamage that might arise from work performed by the other trades.
1.7.3 Apply drainage/ protection board/ insulation as soon as possible after membrane installation.
1.8 PROJECT CONDITIONS
Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended bymanufacturer for optimum results. Do not install products under environmental conditions outsidemanufacturer's absolute limits.
1.9 WARRANTY
The product manufacturer shall issue a written and signed document in the name of the owner,certifying the product will meet all the physical characteristic published by the manufacturer, for aperiod of 20 years, starting from the date of completion of installation of membranes. No letteramending the manufacturer’s standard warranty will be accepted and the warranty certificate mustreflect these requirements.
1.10 MANUFACTURERS/SUPPLIERS
1.10.1 Acceptable Manufacturer: SOPREMA Inc., Melbourne Victoria. Phone: (03) 99383887Fax: (03) 99383899 Web
1.10.2 Licensed / Registered agent: Allduro, which is located in Perth, Western Australia.Tel: (08) 94551658 Fax: (08) 94562079 Email: Web
1.10 PRODUCTS
Alsan 510 Zero Primer, Sopralene Flam 180, Soprastar HRGR, Isoxpress Board, Duotack Glue, and Sopramastic
1.11 PRODUCTS DESCRIPTION
1.11.1 Alsan 510 Zero primer is a primer for SBS bituminous membranes.
1.11.2 Sopralene Flam 180 is an SBS modified thermo fusible waterproof membrane.
1.11.3 Soprastar GR is an SBS modified thermo fusible waterproof membrane with a High Reflective UVstable mineral surface.
1.11.4 Sopramastic is a solvent based mastic used for repairs and joint sealing containing SBS modifiedbitumen, fibres and mineral fillers.
1.12 SYSTEM
One layer of Soprastar GR cap sheet on one layer of Sopralene Flam 180 base sheet on one layer of IsoXpressboard adhered to primed substrate with Duotack adhesive.
1.13 SUBSTRATE PREPARATION
1.13.1 GENERAL
All surfaces should be sound, dry and free from but not limited to, dirt, dust, oil, grease, wax, tar,asphalt, mildew, mold, paint, foreign sealers, coatings, curing agents, loose particles, laitance or any other foreign matter that may impede with the bonding of the primer or membrane. The screedshould be to falls min 1:80 to outlets.
1.13.2 PRIMING
The substrate is to be primed using Alsan 510 zero primer at a rate of 4-6 m² per litre.
1.14 MEMBRANE APPLICATION
1.14.1 Install IsoXpress boards using Doutack adhesive to manufacturers instructions.
1.14.2 One layer of Sopralene Flam 180 base sheet is fully bonded to IsoXpress boards with 100mm side laps
1.14.3 Adhere one layer of Soprastar HRGR with side and end laps laid staggered and fully bonded withheat gun to base layer all with side laps of 100mm and end laps of 150mm.