Curriculum Vitae s301

CURRICULUM VITAE

PAUL DEVANEY

CURRICULUM VITAE

PAUL DEVANEY

PERSONAL DETAILS

FULL NAME: DEVANEY, Paul Thomas

ADDRESS: 4402/14 Executive Drive,

Burleigh Waters, 4220 Qld

Email:

TELEPHONE: 0408 142 252

DATE OF BIRTH: 14th June 1963

PLACE OF BIRTH: Darwin

DRIVERS LICENCE: Heavy Rigid

Full Unrestricted Car and Motorbike

HEALTH: Excellent

INTERESTS & HOBBIES: Fishing

Camping

General Outdoor activities

Computer Games

Reading

EDUCATION AND QUALIFICATIONS:

1976 – 1980: Unley High School, Adelaide SA

Level reached: 4th Year High School Certificate

1980: Goodwood Boys High School, Adelaide SA

Level reached: 5th Year HSC

1981 – 1984: Panorama Community College of TAFE

Adelaide, SA

Level reached: Boilermaking Apprenticeship & Welding

CURRICULUM VITAE PAUL DEVANEY

Page 2

EMPLOYMENT RECORD

March 2013-present Riverside Marine

Position: Boilermaker/Welder

Fabricate and weld a large Aluminium Ramp

for a Barge along with other repairs.

January 2013-January 2013 Skilled

Position: Boilermaker/Welder

BHP Cannigton Underground Mine Shutdown

Remove old rusted out structural steel and fit and

Weld in new structural steelwork.

October 2010-Feburary 2013 RML Diesel Repairs

Position: Boilermaker/Welder

FIFO to repair mobile plant maintain mobile plant

and Crushers,impactors and stackers

Install after market equipment repair and maintain

Buckets.

August 2010-October2010 Skilled

Position: Boilermaker/Welder

Fabricate and weld structual steel also a shutdown

at Qmag

July 2010-August 2010 Central Engineering

Position: Boilermaker/Welder

Fabricate and weld Structural Steel

June 2009 – June 2010 BAE Systems Land Division.

Position: Alloy Welder

Cut and stretch M113s (Armoured Personnel

Carriers)weld to BS EN30042

Dec 2008 – June 2009 Skilled

Position: Boilermaker/Welder,Forklift Driver

Various maintenance labouring positions at

Cement Australia,Fonterra,Oz Minerals

May 2008 – Dec 2008 Logistics International Sal

Position: Boilermaker/Welder

. Fabrication and welding of various parts on ship

supervise a crew of 6 personnel

September 2002 – May 2008 Skilled Engineering

Position: Boilermaker/Welder

·  Fabrication and welding of mobile underground mining equipment

June 2002 – August 2002 Mayne Faulding

Position: Assembler

March 2002 – June 2002 Skilled Engineering

Position: Various labouring positions

Oct 1996 – March 2002 Incat Tasmania

Position: Welder

·  Welding aluminium ferries

March 1996 – Oct 1996: Stratton Engineering (Tasmania)

Position: Boilermaker/Welder

·  General fabrication, ship repair and maintenance.

Subcontractor to Bass Engineering

Oct 1995 – March 1996: Labour Hire

Skilled Engineering, TRACS (Tasmania)

Position: Boilermaker/Welder

Self Employed Sub Contractor to Chivers Logging

CURRICULUM VITAE PAUL DEVANEY

Page 3

EMPLOYMENT RECORD (Continued):

April 1995 – Oct 1995: Stratton Engineering (Tasmania)

Position: Boilermaker/Welder

·  Fabrication, welding and installation of recycling plant.

Oct 1994 – April 1995: The Engineering Company (Tasmania)

Position: Boilermaker/Welder

Self employed contractor

·  Fabrication and welding of conveyors, ship loader, boagies for ship loader.

Aug 1994 – Oct 1994: Rexco Labour Hire (Adelaide)

Position: Boilermaker/Welder – 1st class

·  Shutdowns, general fabrication at various sites.

April 1994 – August 1994: Transfield Mt Isa Division

·  General structural steel fabrication, welding workshop and installation work.

Feb 1994 – April 1994: Dover Engineering, Groote Eylandt, Northern Territory

Position: Boilermaker/Welder

·  Workshop fabrication and welding, site maintenance and installation repair work.

Jan 1994 – Feb 1994: Port Adelaide Construction (Adelaide)

Position: Boilermaker/Welder

·  Fabrication and installation of conveyors on ship. Repair of acid tanks and fabrication of associated pipe work.

CURRICULUM VITAE PAUL DEVANEY

Page 4

EMPLOYMENT RECORD (Continued):

Oct 1993 – Dec 1993: Rexco Labour Hire (Adelaide)

Australian Submarine Corporation Engineering Division

Position: Boilermaker/Welder

·  Plate fabrication for submarines

Feb 1991 – Oct 1993: Perry Engineering (Adelaide)

Position: Boilermaker

·  Heavy plate and structural work of submarines and other projects.

Dec 1989 – Feb 1991: BHP Long Products Division (Whyalla)

Position: Boilermaker/Welder

·  Maintenance of pellet plant, structural steel fabrication, plate fabrication.

June 1989 – Dec 1989: T. O’Connor & Sons (Whyalla)

Position: Boilermaker/Welder

·  Structural steel work and plate fabrication, shutdown and installation work for BHP.

April 1988 – June 1989 Structural Steel

Position: Boilermaker/Welder

·  Pressure vessel fabrication.

Jan 1981 – April 1988: Engineering & Water Supply

Position: Boilermaker/Welder

·  Pipe fabrication, tank fabrication, structural steel fabrication, pressure vessel fabrication.

CURRICULUM VITAE PAUL DEVANEY

Page 5

REFERENCES

Riverside Marine

Martin Brettell

Supervisor

0435893940

Riverside Marine

Evan Gatehouse

Project Manager

0407377038

Skilled

Steve Hall

Supervisor

0747263900

Lucas Drilling

Graham Luke

Workshop Supervisor

0419982765

Lucas Earthmovers

Rob Balman

Leading Hand

0427858691

Lucas Earthmovers

Daniel Jones

Remote Workshop Supervisor

0428 402 008

Exact Mining Services

Rodger Mathews

Leading Hand

0870870258

National Plant&Equipment

Dean Garland

Maintenance Supervisor

0240336322

0427668300

UGL

John Vandermark

Workshop Supervisor

0749716713

0400796477

Skilled

Robert Hope

Manager

0749776704

0428576977

Skilled

Supervisor

Dale Jones

0364351560