CONTRACT WORKS INSURANCE APPLICATION

CIVIL WORKS SUPPLEMENT – complete applicable sections

______

1. BRIDGES

Type of Structure (e.g. arch, suspension, etc.):______

Over Water/OverLand:______

Height & Length:______

Construction Substructure (foundations, abutments & piers):______

______

Construction of Superstructure:

Number of Spans:______

Maximum Length of Spans:______metres

Maximum height above sub-structure:______metres

Material: ______

Contract Value for Culverts: $______

Construction (e.g. box, pipe, steel):______

2. CABLES & TRANSMISSION LINES

Overhead

Proportion of Contract Value:______

Maximum height of pylons/masts:______metres

Construction of pylons/masts:______

Max. cable length between towers:______metresvalue $______

Total cable length:______km.

Underground

Type of Cable:______

Cable laying method:______

Trench Depth:______metres

Maximum Trench length worked upon at any one time: ______metres

3. CANALS AND CHANNELS

Dimensions of Excavation:width:______length:______maximum depth: ______

Type of Lining:______

Lock Gate details:______

4. COFFER DAMS

Construction Type:______

Dimensions:width:______length:______height:______

Built to allow Overtopping: Yes No

if no, freeboard above highest recorded flood level? ______metres

5. DAMS & BARRAGES (& Reservoirs including Dam)

Dimensions: width:______length:______height:______

Type and Construction: ______

Breakdown in Contract Value:

Main Dam:$______

Coffer Dams (see also 4):Number ______Value $______

Tunnels (see also ):Number ______Value $______

Outfall:$______

Spillway:$______

Penstocks:Number ______Value $______

Piping above ground Yes No

Power Station:$______ including or  excluding machinery

6. DEWATERING

Method:______

Water table reduced: from ______metres to ______metres

Where will water be discharged: ______

Main Equipment & power source: ______

Standby equipment & power source: ______

Number of well points: ______

7. LAND RECLAMATION

Proportion of Contract Value: ______

Nature of reclamation (e.g. from marshland, sea, etc.): ______

______

Area: ______Frontage to Major Water exposure: ______

Method of Work: ______

8. PILING (other than coffer dam)

Type of piles: ______

Number of Piles: ______Dimensions:Diameter ______Length ______

Method of Placing: ______

Maximum Value any one pile: $______

9. PIPELINES (land only)

Proportion of Contract Value: ______

Maximum depth of any Cuttings:______metres

Maximum depth of trenches:______metres

Diameter of pipelines (including maximum):______cm

Maximum trench length being worked on:______metres

Type of Pipe: ______

Details of Water Crossings: ______

______

______

Describe significant Gradients: ______

______

10. WORK IN & ADJACENT TO WATER

Proportion of Contract value: ______

Name of Waterway (e.g. lake, river, etc.): ______

Nature of Waterway (e.g. slow/wide/tidal/flash flood, etc.): ______

Description of Work & Protection:______

______

Period during which Work carried out:from______to______

History of flooding:______

Maximum recorded flood level: ______metres

Width of Watercourse:______metresDepth of Watercourse: ______metres

Bank height above normal water level: ______metres

Flow of Current:normal ______cu.sec’sflood ______cu.sec’s

TidalRange:from ______metresto ______metres

Flood Warning Facilities: ______

Proximity to Watercourse traffic and precautions: ______

______

11. ROADS

Excavation/Cuttings: Value $ ______

Maximum depth ______metres, Incline of Sides ______degrees

Method of Support ______

Description of Water Crossings______

______

______Value $ ______

Embankments or other earth works including levelling / grading:

Value $ ______

Maximum height ______metres,Incline of Sides ______degrees

Retaining walls:Value $ ______

Height ______metres,Thickness ______metres

Method of Construction: ______

How Secured: ______

Type / Method of Road Surfacing: ______

Maximum road length without weatherproof course at any time: ______metres

Value: $______

Details of significant gradients: ______

______

______

12.SEA WORKS: (e.g. piers, dolphins, jetties, wharves, docks, seawalls, breakwaters, etc.)

Details of tides, currents, wind speeds & direction: ______

______

______

Wave height & frequency: ______

Structure:Length ______metresWidth ______metresHeight ______metres

Protection from direct sea action: ______

Method of Work: ______

______

______

Structure Details (including purpose):______

______

______

Armouring Details: ______

Fill Details: ______

Dredging Details: ______

Work from Water Details: ______

Jetties / Piers – Length of span between support: ______

Breakwaters (or similar) – Maximum length without final armouring at any time: ______metres

Contract Value Breakdown:Concreting $______

Stanchions or support work $______

Decking, bollards, ancillaries $______

Major Stonework $______

______

13. SEWAGE WORKS

Proportion of Contract Value: ____%

Tanks/Beds : value $ ______maximum depth of excavations: ______metres

Outfall: value $ ______method & type of construction:______

Pumphouse: value $ ______substructure, maximum depth of excavations: ____metres

Superstructure – construction: ______

14. TUNNELS & SHAFTS

Proportion of Contract Value: ____%

Dimensions: ______

Method of excavation: ______

______

Compressed air in use?  yes noIf yes, pressure: ______

Explosives used? yes no If yes, type: ______quantities: ______

Explosives storage: ______

Linings: Type: ______Dimensions: ______

How constructed: ______

Length of unlined excavations behind face: ______metres

15.WATER TOWERS & TANKS

Proportion of Contract Value: ____%

Type / Method of Construction: ______

Tank Dimensions: ______

Foundation Details: ______

Supporting Structure: ______

The undersigned declares that all statements made in this Application are true. Signing of this document does not bind the Applicant to complete the insurance, but it is agreed that the Application shall be the basis for the contract, should the policy be issued.

______

information provided byTitle

______

SignatureDate

1