USNS MARY SEARS

T-AGS 65

COMMUNICATION AND NAVIGATION AIDS SOLIC NO.: MLL-16-T65-ROH

Work Item No. 0404 CATEGORY "A" March 2, 2016

COMPLETE GYRO COMPASS ANNUAL SERVICE USMMI/MLL /RCS

1.0ABSTRACT:

1.1Contractor is to provide a service technician to attend the ship and complete the annual service required on both Gyro Compass units.

2.0REFERENCES:

2.1OEM Technical Manual

3.0ITEM LOCATION/DESCRIPTION:

3.1Description/Manufacturers Data:

3.1.1Raytheon Anschutz STD22 gyro compass (2 each)

4.0GOVERNMENT FURNISHED MATERIAL:

4.1The equipment technical manuals will be available, while on board the vessel.

5.0NOTES:

5.1The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR’s), to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s (http//

5.2The contractor and all subcontractors regardless of tier are advised to review other work items under MLL’s contract to determine their effect on the work required under this work item.

5.3The Gyrocompass units were last services in December 2015 and are reported to be functioning as designed.

6.0QUALITY ASSURANCE REQUIREMENTS:

6.1All workmanship, materials and testing shall be in accordance with the latestSOLAS Radio Regulations and ABS Rules for Building and Classing Steel Vessels and shall be completed to the satisfaction of the Chief Mate. Quality Assurance requirements shall be in accordance with MSC GTR No 3 – Tests, Inspections, Trials and Certificates.

7.0STATEMENT OF WORK REQUIRED:

7.1The contractor is to provide the necessary labor, tools and material required to complete the servicing required by this specification.

7.1.1The Contractor is to attend the ship and complete the annual servicing as required by the manufacturer’s Technical Requirements and the applicable SOLAS regulations.

7.1.2Any increase in the scope of work or any additional repairs are to be presented using a condition found report. The costs are to be identified using the format in section 8.2 below. The increased costs will be handled by a delivery order.

7.1.3Any credit for unused portion of any quoted per diem, travel or labor is to be handled by a delivery order.

7.2TESTS/INSPECTIONS: Upon completion of all work, operationally test bothunitsand demonstrate proper operation to the Radio Officer and Second Mate.

7.3PREPARATION OF REPORTS: A service report is to be provided upon completion of this service order and an electronic copy and hard copy are to be provided to the chief engineer and the port engineer. The electronic copy is to be email to the chief engineer at and the port engineer at .

7.3.1The report should include a summary of all work performed, parts consumed, defects found, repairs made, the radar’s condition and the contractor’s conclusions and recommendations.

7.3.1.1The contractor’s “Conclusions” should provide a list of items to watch for going forward, with recommendations for future work and a list of parts that would be required.

7.4MANUFACTURER’S REPRESENTATIVE: The contractor is to provide the services of an OEM qualified service engineer.

8.0GENERAL REQUIREMENTS:

8.1The contractor shall furnish all repair parts, special tools and test equipment, required to accomplish this work item.

8.2Bids at to cover one day of labor and will be furnished in a lump sum amount and broken down into the following categories:

8.2.1Labor costs

8.2.2Materials

8.2.3Travel, lodging and subsistence costs

8.2.4Overhead

VR16-00790404- 1