Settlements & Billing / Version: 5.65
Configuration Guide for: Standard Capacity Product / Date: 03/034/14

Settlements & Billing

Configuration Guide: Standard Capacity Product

Pre-calculation

Version 5.65

ÓCAISO, 2014 / Page 16 of 16
Settlements & Billing / Version: 5.65
Configuration Guide for: Standard Capacity Product / Date: 03/034/14

Table of Contents

1. Purpose of Document 3

2. Introduction 3

2.1 Background 3

2.2 Description 3

3. Charge Code Requirements 4

3.1 Business Rules 4

3.2 Predecessor Charge Codes 4

3.3 Successor Charge Codes 5

3.4 Inputs – External Systems 5

3.5 Inputs - Predecessor Charge Codes or Pre-calculations 7

3.6 CAISO Charge Code Formula 9

3.7 Output Requirements 13

4. Charge Code Effective Date 16

1.  Purpose of Document

The purpose of this document is to capture the requirements and design specification for a Charge Code in one document.

2.  Introduction

2.1  Background

The Standard Capacity Product (SCP) was introduced on January 1, 2010, as described in CAISO Tariff Section 40.9. SCP incorporates resource availability standards and incentives into the ISO Tariff to facilitate contracting for Resource Adequacy (RA) Capacity. SCP also enhances grid reliability and market efficiency by providing an incentive for RA Resources to be available during peak hours.

SCP is a set of attributes defined in the CAISO tariff which specify the Availability Standard, Non-Availability Charges and Availability Incentive Payments applied to non-exempt RA capacity. There is one availability standard applicable to RA resources each month during the RA compliance year. Each monthly Availability Standard is based on the historic availability of the RA resource fleet during a pre-defined set of peak hours during a previous three-year period. At a high level, the CAISO will review the availability of each RA Resource subject to SCP each month to determine whether its meets the Availability Standard applicable for that month. An RA Resource that has a lower availability rate than the Availability Standard minus the tolerance band of 2.5% is subject to a Non-Availability Charge. An RA Resource that has availability greater than the Availability Standard plus the tolerance band of 2.5% will be eligible for an Availability Incentive Payment.

For RA Resources whose Net Qualifying Capacity is determined by historical output, ISO Tariff Section 40.9.4.2 provides a separate method for calculating hourly available RA capacity. The method considers three quantities for determining hourly available RA capacity in each availability assessment hour: (1) the actual amount of energy the resource delivered to the ISO grid during that hour, (2) the resource’s RA capacity as designated in its supply plan for the month, and (3) the resource’s Net Qualifying Capacity as reduced for that hour by the same percentage by which any forced outages or temperature-related ambient de-rates reduced the resource’s capacity from its Pmax capacity.

RA resources may substitute non-RA capacity to mitigate the impact of a forced outage or de-rate on its availability calculation. Any substituted capacity must be both available (as stated in SLIC) and, if substituted in DA market, must submit a bid or self schedule for full amount of substitution in DA market. A non-RA Resource that the CAISO approves to substitute for RA Capacity becomes an RA Resource for the duration of the substitution.

2.2  Description

The Standard Capacity Product pre-calculation is the pre-calculation which executes daily the hourly availability and sold quantities that will be used in the subsequent monthly charge codes. This pre-calculation is predecessor to CC8824 (Monthly Resource Adequacy Standard Capacity Product Settlement) and CC8825 (Monthly NRSS Resource Adequacy Standard Capacity Product Settlement).

3.  Charge Code Requirements

3.1  Business Rules

Bus Req ID / Business Rule /
1.0 / The Hourly RA MW Available from Resource and total Availability Assessment Hours of month includes only peak hours. In essence, the CAISO will sum the MW that are available in the month for only the defined Availability Assessment Hours.
1.1  / Availability for each RA resource for each month will be determined by calculating: (a) the total RA Capacity MW available over all Availability Assessment Hours of the month, divided by (b) the total RA Capacity MW designated in the Supply Plan for the same hours
1.2  / A tolerance band of 5.0% is used around the Availability Standard (2.5% on either side of the Availability Standard value) to eliminate the calculation and assessment of Non-Availability Charges and Availability Incentive Payments in very small amounts.
2.0  / SCP Non-Availability Charges and Availability Incentive Payments apply to the Local Capacity Area RA capacity submitted by a Load following MSS in an annual Resource Adequacy Plan and to the Local Capacity Area RA Capacity of a Modified Reserve Sharing LSE.
3.0  / The eligible substitution quantity is calculated as the minimum of the bid and the substituted capacity in DA market. The bidding is not required for RT substitution.
The hourly available RA capacity for RA resources with historical qualifying capacity, expressed as a formula, is as follows:
Hourly Available RA Capacity = Min (RA Capacity, Max (Actual Energy, Proportional De-rated Capacity))
Where:
RA Capacity = RA Capacity designated in the Supply Plan
Actual Energy = Total actual energy delivered by the resource in the Availability hour
Proportional De-rated Capacity = Resource’s Net Qualifying Capacity as reduced for that hour by the same percentage by which any Forced Outages or temperature-related ambient de-rates reduced the resource’s capacity from its Pmax capacity

3.2  Predecessor Charge Codes

Charge Code/ Pre-calc Name /
Pre-Calculation – Measured Demand over Control Area

3.3  Successor Charge Codes

Charge Code/ Pre-calc Name /
CC 8824 – Monthly Resource Adequacy Standard Capacity Product Settlement
CC 8825 – Monthly Non-Resource Specific System Resource Adequacy Standard Capacity Product Settlement
CC 8826 – Monthly Resource Adequacy Standard Capacity Product Metered Demand Allocation
CC 8827 – Monthly Non-Resource Specific System Resource Adequacy Standard Capacity Product Metered Demand Allocation

3.4  Inputs – External Systems

Row # / Variable Name / Description /
1 / AvailabilityAssessmentHourFlag mdh / The Flag is 1 for the Availability Assessment Hours of the Trading Month and 0 otherwise. The Availability Assessment Hours effective 1/1/2010 are:
Apr- Oct HE 14- 18
Jan – Mar HE 17- 21
Nov & Dec HE 17- 21
Excluding Saturday, Sunday and federal holidays
2 / BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh / Capacity MW sold by Business Associate B and by Resource r and Resource Type t subject to the SCP and for each Assessment hour h
3 / BAHourlyRAResourceSubstitutedCapacityQty Brtr’h’F’S’mdh / Substituted Capacity MW available by Business Associate B and by Resource r and Resource Type t subject to the SCP and for each Assessment hour h
4 / BAHourlyRAResourceBidQty Brtr’F’S’mdh / Bid Quantity of resource (r’) providing substitute capacity to a given resource (r) and its Business Associate B for the specified Trading Hour.
5 / BAHourlyRAResourceAvailableCapacityQty BrtF’S’s’mdh / Total capacity MW available by Business Associate B and by Resource r and Resource Type t subject to the SCP and for each compliance hour h
6 / BARAResourceGrandFatheredAvailableCapacityQty BrtF’S’f’mdh / Capacity MW not available to CAISO by Business Associates B and Resource r and Resource Type t for each compliance hour h
7 / BAHourlyRAResourceDARTTimeframeSubstitutionFlag Brtr’F’S’mdh / DA and Real Time Market Timeframe Substitution Flag MW. This Flag is 1 when the substitution happens in DA Market and 0 In RT Market. The DA Timeframe shall be anytime up to 6:00AM on the Day before the substitution start time specified on a unit substitution request.
The RT Timeframe shall be anytime after 6:00AM on the day before the substitution start time specified on a unit substitution request
8 / BAHourlyRASubResourceAvailableCapacityQty Brtr’h’F’S’mdh / Total hourly MW capacity available from the substitute resource r’ that will be used to calculate substitute capacity for Business Associate B and resource r during the trading hour h.
9 / BAResEntityDispatchIntervalMeteredQuantity BrtuT’I’Q’M’AA’m’F’R’pPW’QS’d’Nz’VvHn’L’mdhcif / The input represents 5-minute meter data received from OMAR MV-90 for a given resource and Settlement Interval.
10 / BARAResourceSCPHistoricalQCIdentificationFlag BrtF’S’s’mdh / Historical QC Identification flag Associate B and by Resource r and Resource Type t subject to the SCP and for each Assessment hour h. This Flag identify only resources whose NQC is determined by Historical Output from Master File. The flag is 1 only for HQC resources and blank otherwise.

3.5  Inputs - Predecessor Charge Codes or Pre-calculations

Row # / Name / Predecessor Charge Code/
Pre-calc Configuration /
1 / BAHourlyNodalMeteredCAISODemandQuantity_MDOverCA BAA’mdh / Sum of meter input values over the Aggregated Pricing Node A of Aggregated Pricing Node Type A’ for Business Associate B, Trading Hour h, Trading Day d and Trading Month m. The summed quantity includes the individual meter readings for Loads of non-MSS entities and gross-settled MSS entities, and also includes the calculated net MSS Demand value for each net-settled MSS entity.
2 / HourlyNodalMeteredCAISODemandQuantity_MDOverCA AA’mdh / Sum of meter input values over the Aggregated Pricing Node A of Aggregated Pricing Node Type A’ for Trading Hour h, Trading Day d and Trading Month m. The summed quantity includes the individual meter readings for Loads of non-MSS entities and gross-settled MSS entities, and also includes the calculated net MSS Demand value for each net-settled MSS entity.
3 / BAHourlyRAResourceSoldCapacityRatio BrtF’S’ s’mdh / Proportion of RA Sold Capacity to RA Capacity Commitment by Business Associate B and by Resource r and Resource Type t subject to the SCP and for each Assessment hour h
4 / BAHourlySubRAResourceSubstitutionAvailabilityRatio Brtr’h’F’S’mdh / Proportion of Substituted Capacity to RA Capacity Commitment by Business Associate B and by Resource r and Resource Type t subject to the SCP and for each Assessment hour h

3.6  CAISO Charge Code Formula

3.6.1  BAHourlyRAResourceAssessmentHourSoldCapacityQuantity BrtF’S’mdh = BAHourlyRAResourceSCPEligibleSoldCapacityQuantity BrtF’S’mdh * BAHourlyResourceAvailabilityAssessmentHourCalculatedFlag BrtF’S’mdh

3.6.2  BAHourlyRAResourceAssessmentHourAvailableCapacityQuantity BrtF’S’mdh = Min (BAHourlyRAResourceSCPEligibleSoldCapacityQuantity BrtF’S’mdh, BAHourlyTotalRAResourceAvailableCapacityQuantity BrtF’S’mdh) * BAHourlyResourceAvailabilityAssessmentHourCalculatedFlag BrtF’S’mdh

3.6.3  BAHourlyResourceAvailabilityAssessmentHourCalculatedFlag BrtF’S’mdh =Max (0,AvailabilityAssessmentHourFlag mdh )

Where exists BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh

3.6.4  BAHourlyRAResourceSCPEligibleSoldCapacityQuantity BrtF’S’mdh = BARAResourceSCPEligiblePercentage BrtF’S’mdh * BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh

3.6.5  BAHourlyTotalRAResourceAvailableCapacityQuantity BrtF’S’mdh = (BAHourlyRAResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh + BAHourlyRAResourceSCPSubstitutedCapacityQuantity BrtF’S’mdh)

3.6.6  BAHourlyRAResourceSCPSubstitutedCapacityQuantity BrtF’S’mdh =

IF

BAHourlyRAResourceDARTTimeframeSubstitutionFlag Brtr’F’S’mdh = 1

THEN

BAHourlyRAResourceSCPSubstitutedCapacityQuantity BrtF’S’mdh =

Min (BAHourlyRAResourceSubstitutedCapacityQuantity Brtr’F’S’mdh, BAHourlyRAResourceSubstitutedCapacityBidQuantity Brtr’F’S’mdh)

ELSE

BAHourlyRAResourceSCPSubstitutedCapacityQuantity BrtF’S’mdh = BAHourlyRAResourceSubstitutedCapacityQuantity Brtr’F’S’mdh

END IF

3.6.6.1  BAHourlyRAResourceSubstitutedCapacityBidQuantity Brtr’F’S’mdh =

ATTRIBUTE_SWAP(r,r’) On (BAHourlySubstituteRAResourceBidQuantity Brtr’F’S’mdh)

3.6.6.2  BAHourlySubstituteRAResourceBidQuantity Brtr’F’Smdh =

(BAHourlyRAResourceTotalSubstCapBidQuantity Brtr’h’F’S’mdh * BAHourlyRAResourceSubstRatio Brtr’h’F’S’mdh )

3.6.6.3  BAHourlyRAResourceTotalSubstCapBidQuantity Brtr’h’F’S’mdh =

Max(0,BAHourlySubRAResourceBidQuantity Brtr’F’S’mdh – ResourceHourlyProRateSoldCapacityQuantity rtF’S’mdh)

Implementation note:

The above Charge Type driver shall be BAHourlyRASubstituteResourceProvidedSubstituteCapacityQuantity Brtr’h’F’S’mdh.

3.6.6.4  BAHourlySubRAResourceBidQuantity Brtr’F’S’mdh =

ATTRIBUTE_SWAP(r,r’) On (BAHourlyRAResourceBidQty Brtr’F’S’mdh)

3.6.6.5  ResourceHourlyProRateSoldCapacityQuantity rtF’S’mdh =

BAHourlyRAResourceSoldAvailableCapacityQuantity BrtF’S’s’mdh

3.6.6.6  BAHourlyRAResourceSubstRatio Brtr’h’F’S’mdh =

BAHourlyRASubstituteResourceProvidedSubstituteCapacityQuantity Brtr’h’F’S’mdh / HourlyRAResourceSubstituteProvidedCapacityQuantity rtF’S’mdh

3.6.7  BAHourlyRAResourceSubstitutedCapacityQuantity Brtr’F’S’mdh =

Min (BAHourlyRAResourceSubstitutedCapacityQty Brtr’h’F’S’mdh, BAHourlyRAResourceSubstitutedAvailabilityQuantity Brtr’h’F’S’mdh)

3.6.8  BAHourlyRAResourceSubstitutedAvailabilityQuantity Brtr’h’F’S’mdh =

BAHourlyRASubResourceAvailableCapacityQty Brtr’h’F’S’mdh * BAHourlySubRAResourceSubstitutionAvailabilityRatio Brtr’h’F’S’mdh

3.6.9  BAHourlySubRAResourceSubstitutionAvailabilityRatio Brtr’h’F’S’mdh =

ATTRIBUTESWAP (r, r’) On BAHourlyRAResourceProvidedSubstituteRACapacityRatio Brtr’h’F’S’mdh

3.6.10  BAHourlyRAResourceProvidedSubstituteRACapacityRatio Brtr’h’F’S’mdh =

BAHourlyRASubstituteResourceProvidedSubstituteCapacityQuantity Brtr’h’F’S’mdh / (HourlyRAResourceSubstituteProvidedCapacityQuantity rtF’S’mdh + HourlyRAResourceSoldCapacityQuantity rtF’S’mdh )

3.6.11  HourlyRAResourceSoldCapacityQuantity rtF’S’mdh =

BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh

3.6.12  BAHourlyRASubstituteResourceProvidedSubstituteCapacityQuantity Brtr’h’F’S’mdh =

ATTRIBUTE_SWAP (r, r’ ) On (BAHourlyRAResourceSubstitutedCapacityQty Brtr’h’F’S’mdh )

3.6.13  BAHourlyRAResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh = BAHourlyRANonHQCResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh + BAHourlyRAHQCResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh

3.6.14  BAHourlyRANonHQCResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh = BARAResourceSCPEligiblePercentage BrtF’S’mdh * BAHourlyRAResourceSoldAvailableCapacityQuantity BrtF’S’s’mdh

Where s’ > HQC

3.6.15  BAHourlyRAHQCResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh =

(BARAResourceSCPEligiblePercentage BrtF’S’mdh * Min (BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh, BAHourlyRAResourceSCPHistoricalCapacityQuantity BrtF’S’s’mdh))

Where s’ = HQC

3.6.16  BAHourlyRAResourceSCPHistoricalCapacityQuantity BrtF’S’s’mdh =

IF

BARAResourceSCPHistoricalQCIdentificationFlag BrtF’S’s’mdh = 1

THEN

BAHourlyRAResourceSCPHistoricalCapacityQuantity BrtF’S’s’mdh =
Max (BAHourlyRAResourceSCPMeteredCalculatedQuantity BrtF’S’mdh, BAHourlyRAResourceSoldAvailableCapacityQuantity BrtF’S’s’mdh )

ELSE

BAHourlyRAResourceSCPHistoricalCapacityQuantity BrtF’S’s’mdh = 0

END IF

3.6.17  BAHourlyRAResourceSoldAvailableCapacityQuantity BrtF’S’s’mdh =

BAHourlyRAResourceAvailableCapacityQty BrtF’S’s’mdh * BAHourlyRAResourceSoldCapacityRatio BrtF’S’s’mdh

3.6.18  BAHourlyRAResourceSoldCapacityRatio BrtF’S’s’mdh =

BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh / (BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh + HourlyRAResourceSubstituteProvidedCapacityQuantity rtF’S’mdh )

Where Exists BAHourlyRAResourceAvailableCapacityQty BrtF’S’s’mdh

3.6.19  HourlyRAResourceSubstituteProvidedCapacityQuantity rtF’S’mdh =

ATTRIBUTE_SWAP (r, r’ ) On (BAHourlyRAResourceSubstitutedCapacityQty Brtr’h’F’S’mdh )

3.6.20 BAHourlyRAResourceSCPMeteredCalculatedQuantity BrtF’S’mdh = BAResEntityDispatchIntervalMeteredQuantity BrtuT’I’Q’M’AA’m’F’R’pPW’QS’d’Nz’VvHn’L’mdhcif

Where Q’ = CISO

3.6.21 BARAResourceSCPEligiblePercentage BrtF’S’mdh = BAHourlyRAResourceSCPCapacityNotGrandfatheredQuantity BrtF’S’mdh / BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh

3.6.22 BAHourlyRAResourceSCPCapacityNotGrandfatheredQuantity BrtF’S’mdh = Max (0,(BAHourlyRAResourceSoldCapacityQty BrtF’S’mdh - BARAResourceTotalGrandFatheredAvailableCapacityQuantity BrtF’S’mdh))

3.6.23 BARAResourceTotalGrandFatheredAvailableCapacityQuantity BrtF’S’mdh = BARAResourceGrandFatheredAvailableCapacityQty BrtF’S’f’mdh

3.6.24 BAHourlyNodalSCPMeteredCAISODemandQuantity_MDOverCA Bmdh = BAHourlyNodalMeteredCAISODemandQuantity_MDOverCA BAA’mdh

3.6.25 HourlyNodalSCPMeteredCAISODemandQuantity_MDOverCA mdh = HourlyNodalMeteredCAISODemandQuantity_MDOverCA AA’mdh

3.7  Output Requirements

Output Req ID / Name / Description /
1 / In addition to any outputs listed below, all inputs shall be included as outputs.
2 / BAHourlyRAResourceAssessmentHourSoldCapacityQuantity BrtF’S’mdh / Hourly sold capacity during the peak hours by Business Associate B and resources r and Resource Type t
3 / BAHourlyRAResourceAssessmentHourAvailableCapacityQuantity BrtF’S’mdh / Total Hourly Capacity MW Available during the Peak Hours by Business Associates B Resource r and Resource Type t during the Trading Hour h.
4 / BAHourlyResourceAvailabilityAssessmentHourCalculatedFlag BrtF’S’mdh / Hourly Assessment Hour calculated Flag based on the maximum of 0 and the Assessment Hour Flag .
5 / BAHourlyRAResourceSCPEligibleSoldCapacityQuantity BrtF’S’mdh / Eligible hourly sold capacity quantity by Business Associate B and resources r and Resource Type t
6 / BAHourlyTotalRAResourceAvailableCapacityQuantity BrtF’S’mdh / Total Hourly Capacity MW Availability by Business Associates B Resource r and Resource Type t during the Trading Hour h
7 / BAHourlySubstituteRAResourceBidQuantity Brtr’F’S’mdh / Bid quantity from RA resource providing substitute capacity
8 / BAHourlyRAResourceSCPSubstitutedCapacityQuantity Brtr’F’S’mdh / SCP Eligible Substituted Capacity Quantity.
9 / BAHourlyRAResourceSubstitutedCapacityBidQuantity Brtr’F’S’mdh / Substitution bid quantity of the RA resource on forced outage for capacity from substitute resource (r’).
10 / BAHourlySubstituteRAResourceBidQuantity Brtr’F’Smdh / Substitution bid quantity of the resource providing substitute capacity for RA resource (r’).
11 / BAHourlyRAResourceTotalSubstCapBidQuantity Brtr’h’F’S’mdh / Bid quantity to assess substitute capacity.
12 / BAHourlyResourceProRateSoldCapacityQuantity Brtr’h’F’S’mdh / Substitute RA resource’s sold RA capacity by recipient RA resource.
13 / BAHourlyResourceSoldCapQuantity BrtF’S’mdh / Substitute RA resource’s sold RA capacity.
14 / BAHourlyRAResourceSubstRatio Brtr’h’F’S’mdh / Ratio of substitute capacity for resource (r’) over the total amount substitution capacity resource (r ) is providing.
15 / BAHourlyRAResourceSubstitutedCapacityQuantity Brtr’F’S’mdh / Hourly Eligible Substituted Capacity Quantity by business associate B resource r and substitution resource type r’ for the trade hour h.
16 / BAHourlyRAResourceSubstitutedAvailabilityQuantity Brtr’h’F’S’mdh / RA resource’s substitute availability by Resource r and Historic Qualified Capacity s’ during the Trading Hour
17 / BAHourlyRAResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh / Total Hourly Capacity MW Availability by Business Associates B Resource r and Resource Type t during the Trading Hour h
18 / BAHourlySubRAResourceSubstitutionAvailabilityRatio Brtr’h’F’S’mdh / Ratio of substitute capacity over the sum of all substitute capacity and RA capacity.
19 / BAHourlyRAResourceProvidedSubstituteRACapacityRatio Brtr’h’F’S’mdh / Ratio of substitute capacity over the sum of all substitute capacity and RA capacity.
20 / HourlyRAResourceSoldCapacityQuantity rtF’S’mdh / RA Capacity designated in the supply plan.
21 / BAHourlyRASubstituteResourceProvidedSubstituteCapacityQuantity Brtr’h’F’S’mdh / Substitute Capacity for resource (r’)
22 / BAHourlyRANonHQCResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh / Total Hourly Eligible Capacity MW Availability by Business Associates B, Non HQC Resource r and Resource Type t during the Trading Hour h
23 / BAHourlyRAHQCResourceSCPEligibleAvailableCapacityQuantity BrtF’S’mdh / Total Hourly Eligible Capacity MW Availability by Business Associates B, HQC Resource r and Resource Type t during the Trading Hour h
24 / BAHourlyRAResourceSCPHistoricalCapacityQuantity BrtF’S’s’mdh / Hourly Historical QC Resource calculated availability Capacity by Business Associate B and by Resource r and by Historical QC Resource Id s’
25 / BAHourlyRAResourceSoldAvailableCapacityQuantity BrtF’S’s’mdh / RA resource’s RA sold availability by Business Associates B, Resource r and Resource Type t during the Trading Hour
26 / BAHourlyRAResourceSoldCapacityRatio BrtF’S’s’mdh / Ratio of RA Capacity over the sum of all substitute and RA capacity.
27 / HourlyRAResourceSubstituteProvidedCapacityQuantity rtF’S’mdh / Sum of substitute capacity resource (r ) is providing to RA resources with forced outages.
28 / BAHourlyRAResourceSCPMeteredCalculatedQuantity BrtF’S’mdh / Hourly SCP calculated generation meter quantity by BA, and by resource r and by hour h.
29 / BARAResourceSCPEligiblePercentage BrtF’S’mdh / Percentage of Eligible SCP that is available to the ISO
30 / BAHourlyRAResourceSCPCapacityNotGrandfatheredQuantity BrtF’S’mdh / Eligible capacity that is not grandfathered by Business Associate B and resources r and Resource Type t
31 / BARAResourceTotalGrandFatheredAvailableCapacityQuantity BrtF’S’mdh / Total Grandfathered Available capacity quantity by Business Associate B, Resource r and Resource Type t during the trading Hour h
32 / BAHourlyNodalSCPMeteredCAISODemandQuantity_MDOverCA Bmdh / Hourly Nodal SCP CAISO Metered Demand by Business Associate B
33 / HourlyNodalSCPMeteredCAISODemandQuantity_MDOverCA mdh / Hourly Nodal SCP CAISO Metered Demand
ÓCAISO, 2014 / Page 16 of 16