C O N T R A C T D A T A R E Q U I R E M E N T S L I S T
(1 Data Item) / Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate or Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government
A. CONTRACT LINE ITEM NO. / B. EXHIBIT /

C. CATEGORY:

E / TDP TM OTHER. PUBLICATION DATA

D. SYSTEM/ITEM

/ E. CONTRACT/PR NO. /

F. CONTRACTOR

#X###, <DEVICE NOMENCLATURE> / N61339-FY-X-#### / <CONTRACTOR NAME>
1. DATA ITEM NO. / 2. TITLE OF DATA ITEM / 3. SUBTITLE / 17. PRICE GROUP
E002 / PLANNED MAINTENANCE SYSTEM (PMS) / ELECTRONIC TECHNICAL MANUAL (ETM)
4. AUTHORITY (Data Acquisition Document No.) / 5. CONTRACT REFERENCE / 6. REQUIRING OFFICE / 18. ESTIMATED
TOTAL PRICE
NAWCTSD TMCR-FY-## / SOW PARA #.#.#.# / NAWCTSD TMSS
7. DD 250 REQ / 9. DIST STATEMENT / 10. FREQUENCY / 12. DATE OF FIRST SUBMISSION / 14. DISTRIBUTION
LT / / 3TIME/R / SEE BLOCK 16
8. APP CODE / B / 11. AS OF DATE / 13. DATE OF SUBSEQUENT SUBM. / a. ADDRESSEE / b. COPIES
final
SEE BLOCK 16 / draft / reg / repr
16. REMARKS
1.  DELIVERY SHALL BE A PLANNED MAINTENANCE SYSTEM FORMATTED IAW NAWCTSD TMCR-FY-## (ANNEX TO EXHIBIT E).
2.  BLK 12: INITIAL SUBMISSION (DRAFT): A BOOKPLAN/OUTLINE SHALL BE POSTED TO THE CONTRACTOR MAINTAINED WEBSITE ONE (1) MONTH AFTER GOVERNMENT ACCEPTANCE OF THE CRITICAL DESIGN REVIEW (CDR).
3.  DRAFT SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR MAINTAINED WEBSITE FIFTEEN (15) DAYS PRIOR TO THE 40% AND 80% TECHNICAL MANUAL CONFERENCES AND SHALL MEET THE REQUIREMENTS OF THE SPECIFIC CONFERENCE AS STATED IN THE STATEMENT OF WORK (SOW) AND TMCR.
4.  A 100% DRAFT SUBMISSION SHALL BE MADE AVAILABLE FOR REVIEW DURING THE PHYSICAL CONFIGURATION AUDIT (PCA).
5.  GOVERNMENT SHALL HAVE ACCESS TO THE DRAFT DATA THROUGHOUT MANUAL DEVELOPMENT FOR REVIEW AND ACCEPTANCE/REJECTION.
6.  BLK 13: SECOND SUBMISSION (PRELIMINARY) INCORPORATING ALL COMMENTS FROM THE 40%, 80% AND PCA SHALL BE DUE AT DEVICE READY FOR TRAINING (RFT).
7.  GOVERNMENT SHALL HAVE SIX (6) MONTHS FOR REVIEW AND ACCEPTANCE/REJECTION OF THE SECOND SUBMISSION.
8.  BLK 13: THIRD SUBMISSION (FINAL) INCORPORATING ALL COMMENTS GENERATED FROM THE SECOND SUBMISSION SHALL BE DUE THREE (3) MONTHS AFTER GOVERNMENT ACCEPTANCE OF THE SECOND SUBMISSION.
9.  GOVERNMENT SHALL HAVE THREE (3) MONTHS FOR REVIEW AND ACCEPTANCE/REJECTION OF THE THIRD SUBMISSION.
10.  BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGHOUT THE GOVERNMENT REVIEW PERIOD.
11.  GOVERNMENT SHALL HAVE UNTIL THE END OF THE BASIC SUBMISSION (I.E., PRELIMINARY OR FINAL) REVIEW PERIOD OR ONE (1) MONTH, WHICHEVER IS GREATER, FOR REVIEW AND ACCEPTANCE/REJECTION OF REVISIONS.
12.  BLK 14 DEFINITIONS: FINAL/REG SHALL BE THE SECOND (PRELIMINARY) SUBMISSION. FINAL/REPR SHALL BE THE THIRD (FINAL) SUBMISSION. / NAWCTSD TMSS / 1 / 1
NAWCTSD ISEO / 1 / 1
DEVICE SITE / 1 / 1
NAWCTSD ILSM / LTR / ONLY
NAWCTSD PJM / LTR / ONLY
NAWCTSD PCO / LTR / ONLY
CONTRACTOR WEBSITE / 1 / 1
15. TOTAL à / 1 / 4 / 3

G. PREPARED BY

/

H. DATE

/

I. APPROVED BY

/

J. DATE

<NAME>, NAWCTSD TMSS / <DATE> / <NAME>, NAWCTSD PD / <DATE>