Cbr-D Ipe Inventory Check Sheet

Tags

Cbr-D Ipe Inventory Check Sheet

UPDATED: 01JAN2009

CBR-D IPE INVENTORY CHECK SHEET

FOR USS

DATE:

REF: (a) PMS 6641/018 78

(b)Ship’s Chemical Protective IPE AEL Series 2-770004241, (2-770004251 through 2-770004283)

(c) NTTP 3-20.31, Surface Ship Survivability

(d) COMNAVSURFORINST 3541.1, Standard Repair Party Manual for Naval Surface Force

(e) OPNAVINST 3120.32, Standard Organization and Regulations Manual

(f) NSTM 070, Nuclear Defense and Recovery

(g)NSTM 470, Shipboard BW/CW Defense and Countermeasures

(h) S5090-B1-MMO-01B Stowage Aid Booklet

(i) COMFLTFORCOM MSG DTG 301331Z SEP 03 Shipboard Allowance for ACPG

(j) HTTPS:JACKS.JPEOCBD.OSD.MIL

(k) NSWCCD MSG DTG 311352Z MAR 04 Advanced Chemical Protective Garment (ACPG) Packaging Issues

(l) NSWC-SSESS MSG DTG 021919ZJAN08 Shipboard Chemical, Biological, and Radiological Defense (CBR-D) Equipment Shelf Life and Disposal Guidance Update

Applicable Reference / SAT/ UNSAT / SAT/ UNSAT / SAT/ UNSAT / SAT/ UNSAT / SAT/ UNSAT / SAT/ UNSAT / SAT/ UNSAT
DCRS NUMBER
  1. INSPECT AND INVENTORY CBR-D PERSONNEL PROTECTIVE EQUIPMENT:

  1. Do each of the CBR-D IPE sets contain the following:
  • One JSLIST Coat
  • One JSLIST Trouser
  • One pair of ALO Boots
  • One CP-Glove Set
  • One Pair of RAD Inserts
  • One Webb Belt
  • Two new C2-A1 Canisters
  • One M-291 Decon Kit
  • One MCU Series Mask (Stowed separate from bag).
  • One (1Qt) Canteen w/ cover and cap
  • MCU Series Audio Projection Sets (10 sets recommended IAW ref g)
/ Ref (b), (g) and (i)
  1. Check the shelf life for the following items within each CBR-D IPE Kit:
  • JSLIST Coat
  • JSLIST Trousers
  • Two C2-A1 Canisters
  • M291 DECON Kit
  • ALO Boot
/ Ref (j) and (l)
  1. Check the serviceability for the following items within each CBR-D IPE Kit:
  • CP-Glove Set
  • Spare RAD Glove inserts
  • Canteen sets
  • Webb Belt
  • MCU Series Mask
  • MCU Series Audio Projection Sets
/ Refs (a), (l)
  1. Does the DCRS contain a copy of the most recent CBR-D AEL’s to conduct inventories?
  • Obtain current shortage listing and compare with inventories.
  • Does shortfall list have current reqn NRs assigned?
/ Ref (b)
  1. Is the DCRS equipped IAW the ship’s CBR-D AEL? DCRS will be a representative sampling.
  • CBR Personnel Kit

  1. Does DCA’s shortfall list match actual inventory shortfalls?
/ Ref (b)
  1. Is the CBR-D OSIMS inventory software installed and being used? (Only applicable to RIP ships)
  • Serial NR
  • Version NR
/ N/A
  1. Are the DC kits or bags stenciled with 2” letters for ease of identification? (RIP ships only)
/ N/A
  1. Are the CBR-D kits mounted and hung IAW with the Stowage Aid Book?
/ Ref (h)
  1. Are the 25 CBR-D IPE Kits and masks located within the DCRS area of responsibility? Are the kits assigned to the actual DCRS personnel? (For ships with CBR-D OSIMS Module, scan bar code located on each kit bag.)
/ Ref (b) and (i)
  1. Are the DCRS inventories being conducted IAW current PMS?
  • Verify against SKED or division’s 13-week files.
/

Ref (a)

l. RIP ship’s only: Does the ship have the following equipment for the RIP program.
  • Lap Top Computer with Data base program
  • Bar code scanner
  • Printer to print out bar code labels

B. TEST AND OPERATIONAL TEST OF EQUIPMENT.
  1. Inspect and test MCU Mask:
  • No rips, tears or cracks in the facepiece, faceseal, tabs, buckles and harness
  • No dents, punctures or cracks in voice emitter
  • Black outlet valve disc is installed.
  • No curls, nicks, rips, dirt or moisture in outlet valve disc
  • No cracks or cuts in nosecup
  • No cracks or cuts in external and internal drinking tubes
  • No curls or tears in inlet valve disc.
  • No scratches, stains, punctures in lens
/

6641/018-

A-3R

  1. Inspect C2/C2A1 canister:
  • Check for expired shelf life
  • Inspect for damaged packing containers
  • Replace and properly dispose of unusable canisters
(Non-RIP ships: accomplish annually.
RIP ships: accomplish every 36 months.) /

6641/018-

A-7/36M-7;
Ref (j)
  1. Inspect JSLIST:
  • Check for expired shelf life
  • No holes, tears or other damage to the foil packaging [see Ref (k) for repairing holes]
  • Inner nylon foil package has the following surveillance information:
  • Contract Number
  • NSN
  • Manufacture Date
  • Surveillance Marking Number
  • Garment Size
(Non-RIP ships: accomplish annually.
RIP ships: accomplish every 36 months.) / 6641/018-
A-11/36M-11;
Refs (j), (k)
and (l)
  1. Inspect Chemical Protective Footwear Covers and Gloves/Glove Sets:
  • No moisture or dampness within packaging
  • No sticking to inside of package
  • No cracking or dry rot on opened footwear covers and gloves
  • Replace and properly dispose of damaged footwear and gloves
(Non-RIP Ships: accomplish every 24 months.
RIP Ships: accomplish every 36 months.) /

6641/018-

24M-1/36M-12

  1. Test and inspect MCU Series Audio Projection Set, AN/PNT-2A
  • No cracks, gouges or other damage on exposed surfaces
  • Change battery
  • No charring, flaking, shredded or missing material on battery cover gasket
  • Test audible output of APS
  • Test and inspect annually and after each use
/

6641/018-

A-8R

  1. Inspect Fleet CBR-D Individual Protection Equipment Stowage Bag (RIP ships only)
  • Accomplish every 36 months, upon initial receipt or when bag seal has been broken
  • Verify complete contents
  • No cuts, tears, holes or other damage to bag
/

36M-13R

g. RIP ship’s only: Does the following equipment work and is the ship familiar with the RIP program.
  • Lap Top Computer with Data base program
  • Bar code scanner
  • Printer to print out bar code labels

REMARKS/DISCREPANCIES:

Assessor(s):

1