NAS9-18181

Modification 240

Schedule CNAS9-18181

Modification 130

Schedule B

SECTION F

DELIVERIES OR PERFORMANCE

F.1LISTING OF CLAUSES INCORPORATED BY REFERENCE

NOTICE: The following solicitation provisions and/or contract clauses pertinent to this section are hereby incorporated by reference:

I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

CLAUSE

NUMBER DATETITLE

52.211-15SEPT 1990DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS

52.242-15AUG 1989STOP-WORK ORDER

APR 1984(Alternate 1)

52.247-34NOV 1991FOB Destination

II. NASA FEDERAL ACQUISITION REGULATION SUPPLEMENT (48 CFR CHAPTER 18)

CLAUSE

NUMBER DATETITLE

No NASA By-reference clauses in Section F.

F.2SHIPPING INSTRUCTIONS

All documentation shall be shipped to the addresses identified below:

DA30/Contracting Officers Technical Rep.(COTR)

NASA Johnson Space Center

2101 NASA Road 1

Houston, Texas 77058-3696

Shipment of all other items shall be as follows:

Parcel Post Shipments and Freight Shipments

Ship to:Transportation Officer, Building 421

NASA Johnson Space Center

2101 NASA Road 1

Houston, TX 77058-3696

Mark for:Accountable Property Officer

Contract Number: NAS9-18181

F.3COMPLETION OF WORK

All work required under this contract shall be completed by AprilOctober 310, 20025.

F.4DELIVERABLES

The Contractor shall provide the following deliverables, as specified below, on the following delivery dates:

DELIVERABLE NO. / DATE / TITLE CONTENT/CAPABILITY
1 / 10/15/2001 / Training Load/Hardware for Flight 8A
8A01-S0 Truss Segment, Mobile Transporter
2 / 11/20/2001 / User Development Capability for POIC Training
3 / 12/18/2001 / Training Load/Hardware for Flights 8A, UF-2, and 9A
8A02 - Rate Gyro Assembly, SIGI Interface
UF201 – MSS Mobile Base System
9A00 – Secondary S-Band only
4 / 2/1/2002 / Secondary Lab - Provide Hardware, Software, and MSFC HOSC/POIC interface capable of integrated payload training in the SSTF LAB or Slab .SSTF configured with FSW and Payload Support Data for UF2 payloads. Use operational GFE payload simulators.
5 / 4/13/2002 / SGI Image Generator
6 / Training Load/Hardware for Flights UF-2, 9A, 11A
3/13/2002 / UF202 – Same as UF201 with updated SSRMS, MSS Mobile Base System
3/13/2002 / 9A01 – S1 Truss Segment, External Berthing Cameras, SIGI interface
6A / 4/11/2002 / 11A01 – P1 Truss Segment
7 / 4/30/2002 / PC Re-host
8 / Training Load/Hardware for Flights 9A,11A
6/20/2002 / 9A02 – Same as 9A01 with updated FSW, TR fixes
6/20/2002 / 11A02 – Same as 11A01 with updated FSW, TR Fixes
9 / Training Load/Hardware for Flight ULF1
8/6/2002 / ULF101 – MPLM, ESP2
10 / Training Load/Hardware for Flights ULF1, 12A
10/9/2002 / ULF102 – Same ULF101 with updated FSW, TR fixes
10/9/2002 / 12A01 – P3 and P4 Truss Segments, no new TRICK
11 / Training Load/Hardware for Flight 12A.1
12/2/2002 / 12A101 – P5 Truss Segment
12 / Training Load/Hardware for Flights 12A, 13A
2/6/2003 / 12A02 – Same as 12A01 with updated FSW, TR fixes
2/6/2003 / 13A01 – S3 and S4 Truss Segments
13 / Training Load/Hardware for Flights 12A.1, 13A.1
3/28/2003 / 12A102 – Same as 12A101 with updated FSW, TR fixes
3/28/2003 / 13A101 – S5 Truss Segment, Updated Recon Tools
14 / Training Load/Hardware for Flight 13A
5/22/2003 / 13A02 – Same as 13A01 with updated FSW, TR fixes
15 / Training Load/Hardware for Flights 13A.1
7/23/2003 / 13A102 – Same as 13A101 with updated FSW, TR fixes
16 / Training Load/Hardware for Flights 15A, 10A
8/25/2003 / 15A01 – S6 Truss Segment, updated SSRMS, Centerline Berthing Cameras
8/25/2003 / 10A01 - Node 2 Structure and Models, IP Interfaces
17 / 10/1/2003 / SSTF Operations Transition Documentation
18 / Training Load/Hardware for Flight 15A
11/1/2003 / 15A02 - Same as 15A01 with updated FSW, TR fixes
19 / Training Load/Hardware for Flights ULF2, 10A
12/3/2003 / ULF201 - ESP3, Recon
12/3/2003 / 10A02 - Same as 10A01 with updated FSW, TR fixes
20 / Training Load/Hardware for Flights ULF2, 1J/A
3/30/2004 / ULF202 - Same as ULF201 with updated FSW, TR fixes
3/30/2004 / 1J/A01 – Recon Only, Updated Recon Tools
21 / Training Load/Hardware for Flights 1J/A, 1J
6/27/2004 / 1J/A02 - Same as 1J/A01 with updated FSW, TR fixes
6/27/2004 / 1J01 – JEM Structure and integrated JST
22 / Training Load/Hardware for Flights 1J, 1E
10/15/2004 / 1J02 - Same as 1J01 with updated FSW, TR fixes
10/15/2004 / 1E01 – Columbus Structure and Integrated COL-TRU
23 / Training Load/Hardware for Flights 1E, UF3
1/20/2005 / 1E02 - Same as 1E01 with updated FSW, TR fixes
1/20/2005 / UF301 - MPLM Thermal Loop

F-1