BIDDING LIST FOR WEATHER-RELATED WINTER PROVISIONS

This bidding list is related to the Value-Creating Construction Process' guidance: 'Payment of Winter Provisions'. It recommended that the guidelines are always followed.

Bidder
Name:
Address:
Phone:.
Project:
Name of Project
Contract:
Tender Documents:
The Bid
All reservations and deviations must be specified under “Reservations”
The specification of bids and all unit prices must be completed for the bid toconform.
The following revision page (s) has been received - marked no.:
Main Bid:
The undersigned hereby offers to execute the above contract in accordance with the circular on Fixed Time and Price, excl. VAT, with the services necessary for the full implementation of the contract according to the issued tender documents and invitation to tender, dated: ______
Total Bid, kr.
Write, kr.
to be delivered in accordance with the aforementioned tender documents
Place / Date
Bidder´s signature

This winter bidding list is intended to be incorporated in the total bidding list for the project and comprise the unit prices in the total bid. But it can also be used if weather-related winter provisions are to be conducted as a separate contract.
One can also choose whether unit prices are to be contained in the contract or not. If unit prices are not to be included in the contract, one can also stipulate that workers can later be executed in accordance with the offered unit prices.

All prices are unit prices, which only becomes payable in agreement with the construction management and after documentation of consumption by the contractor.

Weather-related winter provisions

Pos. 1Building site provisions / kr.
Pos. 2Provisions in connection with soil and sewage works / kr.
Pos. 3Provisions in connection withconcrete works / kr.
Pos. 4Provisions in connection withmasonry works / kr.
Pos. 5Provisions in connection with roofing works / kr.
Pos.6Provisions in connection with indoor works / kr.
Total, pos. 1-6, excl.VAT
to be transferred the bidding list´s page2 / kr.
Bank Information:
Sub Contractors:
Reservations:
Deviations from the tender documents:

The following bidding list for weather-related winter provisions are based on the Winter Consultants' proposals. There are comments to some of the items and these comments can be seen on the complete list on in Point 4.1 "WWW værktøjer". Where comments, the position is in this article is marked with an "*". The asterisk should be deleted in the final bidding list.
The bidding list MUST be adjusted to the current project, and ONLY relevant items must be included. Be tough and cull the list thoroughly!
Remember that until 31 March 2010, one is allowed to state that the contractor (s) must include all weather-related winter provisions in their bid. See Executive Order §4. It must still be stated, which contractors must include which weather-related winter provisions in their bids, and whether there must be one or more items on the bidding list.
Remember to have one or more positions on the main bidding list for seasonal winter provisions, and to describe which contractors have to include which seasonal winter provisions. A bidding list has been prepared for seasonal winter provisions.

Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 1, Building site provisions
1.1 / Clearing snow, grittingand deicing / kr.
1.1.1a
* / Labor costs within normal working hours (applies to all Pos. 1-6). / kr./hour / kr.
1.1.1b * / Labor costs outside normal working hours (applies to all Pos. 1-6). / kr./hour / kr.
1.1.1c / Surcharge for contingency watch system for snow removal before the start of work. / kr./
working day / kr.
1.1.2 / Delivery of gravel in covered frost-free depot. incl. labour costs for covering. / kr./ m3 / kr.
1.1.3 / Delivery of road salt / kr./ kg / kr.
1.1.4 / Delivery of Urea. / kr./ kg / kr.
1.1.5a * / Snow clearance with machine during normal working hours / kr./hour / kr.
1.1.5b * / Snow clearance with machine outside normal working hours / kr./hour / kr.
1.1.6 * / Loading, removal from siteanddepositing of snow. / kr./hour / kr.
1.2 / Protection of materials against frost / kr.
1.2.1a / Wage costs for covering material storage (developer delivery) see. Pos. 1.1.1a-b / kr.
1.2.1b / Delivery and removal of tarpaulins,
___ x ___ m. Weight??? g/m2 / kr./pcs. / kr.
1.2.1c / Hire of above / kr./pcs./ day / kr.
1.2.2* / Delivery and disposal of 15 mm thick foam mats. / kr./m2 / kr.
1.2.3 / Delivery and disposal of 1 x 3 m 50 mm thick winter mats. / kr./pcs. / kr.
1.2.5 / Additional price for renting the insulated container incl. electric heating furnace or panel. / kr./pcs./
month / kr.
Pos. 1 Total, to be transferred to the bidding list page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 2 Provisions in connection with soil and sewage works
2.1 * / Provisions against consequences of frost(Improvement of soil bearing capacity) / kr.
2.1.1 * / Stabilization wth. lime incl. working into ground / kr./ m2 /depth / kr.
2.1.2 * / Stabilization wth. cement incl. working into ground / kr./ m2
/depth / kr.
2.1.3 / Geotextile of type F2B, 150 g / m2, supply and laying down incl. base consolidation / kr./m2 / kr.
2.1.4a / Steel Road Plates: Delivery, laying and removal of 2 x 3 m 15 mm thick steel plates / kr./pcs. / kr.
2.1.4b * / Moving and relaying
the above / kr./pcs.
/time / kr.
2.1.4c / Hire of steel road plates, 2 x 3 m15 mmthick plates / kr./pcs./calendar day / kr.
2.1.5 * / Consolidation of the soil's carrying capacity with nut-sized stones, incl. removal from site / kr./m3 / kr.
2.2 * / Removal of rainfall from terrain and excavations at low temperatures or high relative humidity. / kr.
2.2.2a / Delivery and pickup of pump incl. electricity connection. / kr./pcs. / kr.
2.2.2b / Hire of the above / kr./week / kr.
2.2.2c / Operation and maintenance of above / kr./pcs./
calendar day / kr.
2.2.2d / Hire of extra __meter hose and pipe for pump / kr./rm / kr.
2.2.3 / Establishment and removal of pump well made of 315 mm PVC pipe with min. 200 mm nut-sized stones (soaker) / kr./pcs. / kr.
2.2.4 / Establishment and removal of the pump sump which 1000mm BT well ring (h = 500 mm), with min. 200 mm nut-sized stones (soker). / kr./pcs. / kr.
2.2.5 / Excavation of drain ditch (trough-formed). / kr./rm / kr.
2.2.6 / Excavation of drain ditch, b x h = 300 x 600 mm with ø80 PVC drain line, ditch filled with nut-sized stones / kr./rm / kr.
2.3 / Frost protection of soil where freezing may damage completed constructions. / kr.
2.3.1a * / Laying ___ x ___ m tarpaulin: Weight ??? g / m2 / kr./pcs. / kr.
2.3.1b * / The removal and relaying of the above / kr./pcs. / kr.
2.3.2a / Laying of 15 mm. thick insulating foam mats incl. fixing and transport to and from the depot. / kr./ m2 / kr.
2.3.2b / The removal and relaying of 15 mm. thick insulating foam mats on work site, incl. fixing / kr./ m2 / kr.
2.3.3a / Laying of 1 x 3 m, 50 mm thick winter mats incl. fixing, / kr./pcs. / kr.
2.3.3b / The removal and relaying of the above incl. fixing / kr./pcs./
time / kr.
2.3.4 / Purchase of materials for fixing tarpaulins, insulating foam mats or winter mats. / kr./ m / kr.
2.4 / Securing backfill soil from frost. / kr.
Applies to all soil types regardless of duration of storage See pos. 2.3.1A 2.3.4. / kr.
2.5 / Replacement of unsuitable backfill soil / kr.
2.5.1 * / Loading and disposal of soaked soil and replacement with a similar volume of sand fill. / kr./m3 / kr.
2.5.2 * / Loading and disposal of soaked soil and replacement with equal volume raw soil with water content of max. ___%. / kr./m3 / kr.
2.5.3 * / Stabilization with lime incl. working-into soil
. / kr./ m3 / kr.
2.5.4 * / Stabilization with cement incl. working-into soil
/ kr./ m3 / kr.
2.6 / Breaking up the frozen soil crust / kr.
2.6.1a * / Breaking up the frozen soil crust with
machine / kr./ hour / kr.
2.6.1b / Loading and disposal of broken frozen crust incl.
landfill tax. / kr./hour / kr.
2.6.2 * / Delivery and backfilling of replacement fill. / kr./m3 / kr.
2.7 / Improving and replacing of winter-damaged soil base / kr.
Payment according to Pos.2.5.1 – 2.5.4 / kr.
kr.
Post 2 Total to be transferred to the bidding list´s Page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Post 3 Provisions in connection with concrete works
3.1. / Measures to prevent snow and ice on the formwork, reinforcement and
aggregate materials (stones, cement, etc.). / kr.
3.1.2 * / Hire of gas burner / propane torch / kr./ day / kr.
3.1.3 / Operation of gas burner. Gas consumption. / kr./kg / kr.
3.2. / Provisions against frost destruction of hardening concrete. / kr.
3.2.1 * / Additional price for the supply of heated concrete. / kr./m3 / kr.
3.2.2a * / Additional charge for the addition of freezing point depressants down to - __C).
Materials. / kr./m3 / kr.
3.2.2b * / Additional price for delivery, mixing, transportation and pouring of cold concrete (down to - __C). / kr./m3 / kr.
3.2.3 * / Modified concrete proportioning. / kr./m3 / kr.
* / Securing against frost on horizontal
surfaces / kr.
3.2.3a / Laying of ___ x ___ with tarpaulin, nylon fabric coated with PVC incl. fixing
Weight ??? g / m2 / kr./pcs. / kr.
3.2.3b / Removing and relaying, incl. fixing of the above. / kr./pcs. /time / kr.
3.2.4a * / Laying of 15 mm thick insulating foam mats incl. fixing. / kr./m2 / kr.
3.2.4b * / Removing and relaying incl. fixing of the above / kr./m2
/time / kr.
3.2.5a / Laying of 1 x 3 m, 50 mm thick winter mats incl. fixing / kr./pcs. / kr.
3.2.5b / Removing and relaying incl. retention of the above / kr./pcs./
time / kr.
3.2.6 / Purchase of fixing materials. / kr./ m / kr.
* / Frost protection of vertical surfaces. / kr.
3.2.7a / Hanging ___ x ___ m tarpaulin nylon fabric coated with PVC. Weight ??? g / m2 / kr./pcs. / kr.
3.2.7b / Dismantling and re-hanging of the above. / kr./ pcs./time / kr.
3.2.8a * / Hanging 15 mm thick insulation foam mats. / kr./m2/
time / kr.
3.2.8b / Dismantling and re-hanging of the above. / kr./m2/
time / kr.
3.2.9a / Hanging 1 x 3 m, 50 mm thick winter mats. / kr./pcs./time / kr.
3.2.9b / Dismantling and re-hanging of the above.. / kr./pcs./time / kr.
3.2.10 / Purchase of 45 x 95 mm locking mechanisms for holding tarpaulins, foam mats and winter mats in place / kr./ m / kr.
3.2.11 * / Purchase of wooden lathing for holding tarpaulins, foam mats and winter mats. / kr./ m / kr.
3.2.12 * / Labor costs in connection with the above work 3.2.3-3.2.9 / kr./ rm / kr.
Heating. / kr.
3.2.13a / Purchase and supply of 1 x 3 m 900W / 220V electric thermo-mats. / kr./pcs. / kr.
3.2.13b * / Laying out, connecting and removal of the above on horizontal surfaces / kr./pcs. / kr.
3.2.13c / Removal, relaying and connecting the above on horizontal surfaces. / kr./pcs./time / kr.
3.2.14 * / Delivery and handling of resistance wire / heating cables (electric heating wires) incl. required number of thermostats for heating-up of joints and construction joints. / kr./
100 rm. / kr.
3.2.25a / Heating prior to the adjoining concrete
pouring.
Renting of ___ type radiant panels with power output __ kW. Incl. connecting. / kr./pcs./month / kr.
3.2.15b / Installing, connecting and dismantling of the above / kr./time / kr.
3.2.15c / Operation of above.
Gas consumption / kr./kg / kr.
3.2.15d / Care and supervision of the above / kr./hour / kr.
3.2.16a / Delivery and return of __ kW
thermostatically controlled electric heater
. / kr./pcs. / kr.
3.2.16b / Hire of thermostatically controlled electric heater. Capacity and cable length stated. / kr./pcs./month / kr.
3.2.16c / Installing, connecting and dismantling of the above. / kr./pcs./time / kr.
3.2.16d / Operation of the above incl. supervision and care / kr./pcs./
calendar day / kr.
3.2.17a * / Delivery and return of thermostatically controlled ___ heater, capacity ___ kW. / kr./pcs. / kr.
3.2.17b * / Hire of the above / kr./pcs./
calendar day / kr.
3.2.17c * / Installing, connecting and dismantling of the above. / kr./pcs./
time / kr.
3.2.17d * / The operation of the above Incl. supervision and care. / kr./
unit / kr.
3.2.18a / Delivery, Installing, connecting and return of ____ liter oil. / kr./pcs. / kr.
3.2.18b / Hire of above / kr./month / kr.
3.2.19a / Delivery and returning the battery of gas flasks to 6 x 33 kg gas bottles. / kr./pcs. / kr.
3.2.19b / Hire of above / kr./pcs./month / kr.
3.2.19c / Installation and connection of the above / kr./pcs./
time / kr.
3.2.19d / Moving above. / kr./ time / kr.
3.2.20 / Hire of supply lines for gas heaters. / kr./m./
month / kr.
Insulation of formwork / kr.
3.2.21 / Insulation of formwork: Attachment of 50 mm. polystyrene on formwork. incl. labor, materials, removal and disposal. / kr./m2 / kr.
Tent / kr.
3.2.22a / Work tent size ___ x ___ m with min. side height ___m - delivery and retrieval. / kr./pcs. / kr.
3.2.22b / Mounting and removal of above / kr./pcs./time / kr.
3.2.22c / Moving of above on building site. / kr./time / kr.
3.2.22d / Hire of above. / kr./
month / kr.
Extra rent offormwork and scaffolding. / kr.
3.2.23 * / Additional rental of ___ formwork / kr./m2/
kalender dag / kr.
3.2.24 * / Additional rental of ___ scaffolding / kr./m2/
calendar day / kr.
Post 3 Total to be transferred to the bidding list´s Page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 4 Provisions in connection withmasonry works
4.0 / Deicing and defrosting. / kr.
4.0.2 * / Hire of small gas burner /
propane burner / kr./ time / kr.
4.0.3 / Operation of the gas burner.
Gas consumption. / kr./kg / kr.
4.1 / Provisions for protecting mortar against frost. / kr.
4.1.1a / Delivery and return of ___ kW electric water heater. / kr./pcs. / kr.
4.1.1b / Setting-up and taking down the above. / kr./pcs./time / kr.
4.1.1c / Hire of the above. / kr./
arb.dag / kr.
4.1.1d / Supervision and care of the above. / kr./hour / kr.
4.1.2 / Additional price for the supply of heated mortar in small batches on site in tact with bricklaying / kr./
1000 bricks / kr.
4.1.3 / Insulating mortar mixer with 50 mm winter mats incl. labor and materials. / kr./
mixer / kr.
4.1.4 / Frost protection of mortar depot by the laying of winter mats. Laying and removal incl. handling of fixing. / kr./
winter mat/ hour / kr.
4.1.5 * / The mixing of "alcohol" into mortar –
materials.. / kr./l / kr.
4.2 / Coverage and / or protection of newly constructed masonry against frost. / kr.
4.2.1a / Delivery of winter mats, incl. disposal in accordance with pos. 1.2 / kr./pcs. / kr.
4.2.1b / Covering / hanging of 1 x 3 m, 50 mm thick winter mats on executed masonry works, and implementation / kr./pcs. / kr.
4.2.1c / Temporary dismantling / and subsequent covering / hanging. Incl. loading / fixing. / kr./pcs./time / kr.
4.2.2a / Delivery, removal and rental of tarpaulins see. Pos. 1.2. / kr.
4.2.2b * / Covering / hanging ___ x ___ with tarpaulin nylon fabric coated with PVC. Weight g / m 2 must be specified / kr./pcs. / kr.
4.2.2c / Temporary removal of the above and subsequent covering Incl. fixing / kr./pcs./time / kr.
Heating / kr.
4.2.3a * / Delivery and return of ___ kW thermostatically controlled ___ heater. / kr./pcs. / kr.
4.2.3b * / Hire of the above inclusive __ m power cable. / kr./pcs./kalen-derdag / kr.
4.2.3c * / Installing, connecting and dismantling of the above / kr./pcs./time / kr.
4.2.3d * / Operation of the above. / kr./
unit / kr.
4.2.3e / Supervision and care of the above / kr./hour / kr.
4.2.4a / Delivery, installation, connection and return of ____ liter oil tank. / kr./pcs. / kr.
4.2.4b / Hire of above ___ literoil tank / kr./
month / kr.
4.2.5a / Delivery and return of gas-battery for 6 x 33 kggas flasks. / kr./pcs. / kr.
4.2.5b / Hire of above / kr./pcs./month / kr.
4.2.5c / Installation and connection of the above / kr./pcs./time / kr.
4.2.5d / Moving of above. / kr./ time / kr.
4.2.6 / Hire of supply of piping for gas heaters. / kr./m./
month / kr.
4.2.7a / Delivery and return of ___ type radiant panels, power output must be specified / kr./pcs. / kr.
4.2.7b / Hire for the above incl. connecting material. / kr./pcs./month / kr.
4.2.7c / Installing, connecting and dismantling of above. / kr./time / kr.
4.2.7d / Operation of above.
Gas Consumption / kr./kg / kr.
4.2.7e / Care and supervision of the above. / kr./hour / kr.
Delivery of tent / kr.
4.2.8a / Delivery and pickup of ___ x ___ m tent with minimum side height ___ m. / kr./pcs. / kr.
4.2.8b / Mounting and removal of
above / kr./time / kr.
4.2.8c / Hire of above. / kr./
month / kr.
4.2.8d / Moving of above on building site. / kr./time / kr.
4.2.9e / Hire of tent size ___ x ___ m with min. side height ___m. / kr./
month / kr.
Pos. 4 Total to be transferred to the bidding list´s Page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 5 Provisions in connection with roofing works
5.1.1 * / The establishment of a horizontal membrane. Purchase and laying of ___ membrane.
Delivery of tarpaulins and disposal mm, payment in accordance wth. Pos. 1.2. / kr./m2 / kr.
5.1.2 / Purchase of fixing materials / kr./ m / kr.
5.1.3a * / Laying ___ x ___ m tarpaulin nylon fabric coated with PVC,
On horizontal surfaces up to 150
Weight g / m 2 must be specified / kr./pcs. / kr.
5.1.3b * / Removing and relaying the same on horizontal surfaces and up to 15 / kr./ pcs./time / kr.
5.1.4a * / Laying ___ x ___ m tarpaulin nylon fabric coated with PVC,
On surfaces 160-450
Weight g / m 2 must be specified / kr./pcs. / kr.
5.1.3b * / Removing and relaying above on surfaces 160to 450 / kr./ pcs./time / kr.
5.1.4 / Execution of temporary
roof drainage. / kr./pcs. / kr.
5.1.5a / Delivery and pickup of ___ x ___ m tent with minimum side height ___ m. / kr./pcs. / kr.
5.1.5b / Mounting and removal of above / kr./time / kr.
5.1.5c / Moving the tent of size ___ x ___ m with minimum side height ___ m on the
construction site. / kr./time / kr.
5.1.1 * / The establishment of a horizontal membrane. Purchase and laying of ___ membrane. / kr./m2 / kr.
5.2. / Drying of the roof at low
temperatures. / kr.
5.2.1 / Hire of gas burner / propane burner. / kr./day / kr.
5.2.2 / Gas consumption / kr./kg / kr.
5.2.3 * / Hire of drying equipment / kr./day / kr.
5.2.4 * / Hire of submersible/immersion pump. / kr./day / kr.
5.3. / The removal of snow, frost and water. / kr.
5.3.1 / Hire of gas burner / propane burner / kr./day / kr.
5.3.2 / Gas consumption / kr./kg / kr.
5.3.3 * / Hire of drying equipment / kr./day / kr.
5.3.4 / Hire of water vacuum cleaner. / kr./day / kr.
5.3.5 * / Hire of submersible/immersion pump / kr./day / kr.
Pos. 5 Total to be transferred to the bidding list´s Page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos.6 Provisions in connection with indoor works
6.1 / Snow removal on unfinished floors and roof. / kr.
6.1.1a / Hire of gas burner / propane burner. / kr./day / kr.
6.1.1b / Gas consumption / kr./kg / kr.
6.1.2 / Hire of water vacuum cleaner.. / kr./day / kr.
6.2. / Heating and drying / kr.
6.2.1a * / Delivery, installation, dismantling and removal of fan heaters incl. connecting with fittings, and max. 50 m 20 mm PEX tubing.
Effect must be specified / kr./pcs. / kr.
6.2.1b / Hire of above / kr./
calendar day / kr.
6.2.3b * / Operation of above –possible oil
consumption. / kr./t / kr.
Pos. 6 Total to be transferred to the bidding list´s Page 3 / kr.