ARB / Office of Emergency Response
E-BAM DEPLOYMENT AUDIT SHEET
Audit Date: ______Audited By: ______
Pre Deployment Audit: __ Post Deployment Audit: __ E-BAM # ______
Site Location: ______
GPS Coordinates: Lat: ______Long: ______
Address: ______
Incident Name: ______Pictures Y / N
BAM Serial #: ______Property #: ______
Transmitter Serial #: ______
Flow Standard Used: Delta Cal Serial #______Cal. Date ______
LPM @ mmHg / (.5 lpm or below is pass)Leak Check Value:
E-BAM / E-BAM Ref : / Delta Cal / Final Set pointAmbient (High) Temperature Cal. +/- 2.0 Celsius
Barometric Pressure
+/- 10mm Hg
Self-Test ____ Wind Speed ___Wind Direction ____ Relative Humidity ___
Flow Controller / EBAMSet point / EBAM / EBAM Ref / Delta Cal / Final Set Point / Pass / Fail
14.0 LPM
16.7 LPM
17.5 LPM
Tape full __All 4 Transmitter light on __Unit Clean __ Siting __
Positioned North __Extension Cord Labeled ____ Comments / Audit Notes: Comments / Audit Notes: ______
E-BAM Set Up Procedure
1.Turn on EBAM / turn on Delta Cal
2.Go through set up
a)Ready to Start = YES
b)Check Time / Date
c)Check Location (should be number of unit)
d)Check tape advance = 24 hours
e)Check Real time average = 60 min
f)Check Machine type = pm10 or pm2.5
g)Battery volts = 14 – 14.5 volts (if below 14 volts, unit should be turned off)
h)Operation time for 100 amp/hours = 33 hours
i)Run self-test, when complete and system ok then press continue, then press menu.
j)Scroll to System Set up then press menu / select, press continue until you get to the Analog FS = 1.0 screen, and check the following
- Ref Dac FS = 8.0v (don’t change)
- Mode = Hourly
- Baud Rate = 9600
- Delta – T set point = 15°C
- RH Set point = 45% unless humid then 35%
- RH Control = ON (except in battery mode)
- Flow set point = 16.7 LPM
- Type = Actual
- External RH = yes if hooked up
- Pump protect = Off, except in battery mode then On
- Min Restart voltage = 12.5 volts
- Standard conditions temperature = 25°C (don’t adjust)
- Bam calibrate Zero = ### Span = ### (don’t adjust)
3.Clear memory and alarm
a)In main menu scroll to memory and press menu/select
b)Press clear for both alarm log and data logger
c)When all cleared , memory = 100% remaining and 182 days remaining
4. (Calibration) put instrument in calibration mode by scrolling to field calibration
a)scroll to pump test, then leak test
- run leak test, should be below .5 LPM if not system should be cleaned
b)scroll to temperature
- place Delta Cal on EBAM head
- choose high temp and calibrate to Delta Cal
c)scroll to pressure, calibrate to Delta Cal
d)Scroll to flow
- Change flow to 14.0
- Calibrate to 14.0 (delta Cal, reference, EBAM should all read 14.0 when calibrated)
- Change flow to 17.5
- Calibrate to 17.5 (delta Cal, reference, EBAM should all read 17.5 when calibrated)
- When finished, check 16.7 flow (EBAM and Delta Cal should both read the same, if not then go through steps I & II again until all values are the same.
- EBAM is ready to operate, will take 1 hour to warm up and 1st hour data is void.