E-BAM DEPLOYMENT AUDIT SHEET

Audit Date: ______Audited By: ______

Pre Deployment Audit: __ Post Deployment Audit: __ E-BAM # ______

Site Location: ______

GPS Coordinates: Lat: ______Long: ______

Address: ______

Incident Name: ______Pictures Y / N

BAM Serial #: ______Property #: ______

Transmitter Serial #: ______

Flow Standard Used: Delta Cal Serial #______Cal. Date ______

LPM @ mmHg / (.5 lpm or below is pass)

Leak Check Value:

E-BAM / E-BAM Ref : / Delta Cal / Final Set point
Ambient (High) Temperature Cal. +/- 2.0 Celsius
Barometric Pressure
+/- 10mm Hg

Self-Test ____ Wind Speed ___Wind Direction ____ Relative Humidity ___

Flow Controller / EBAM
Set point / EBAM / EBAM Ref / Delta Cal / Final Set Point / Pass / Fail
14.0 LPM
16.7 LPM
17.5 LPM

Tape full __All 4 Transmitter light on __Unit Clean __ Siting __

Positioned North __Extension Cord Labeled ____ Comments / Audit Notes: Comments / Audit Notes: ______

E-BAM Set Up Procedure

1.Turn on EBAM / turn on Delta Cal

2.Go through set up

a)Ready to Start = YES

b)Check Time / Date

c)Check Location (should be number of unit)

d)Check tape advance = 24 hours

e)Check Real time average = 60 min

f)Check Machine type = pm10 or pm2.5

g)Battery volts = 14 – 14.5 volts (if below 14 volts, unit should be turned off)

h)Operation time for 100 amp/hours = 33 hours

i)Run self-test, when complete and system ok then press continue, then press menu.

j)Scroll to System Set up then press menu / select, press continue until you get to the Analog FS = 1.0 screen, and check the following

  1. Ref Dac FS = 8.0v (don’t change)
  2. Mode = Hourly
  3. Baud Rate = 9600
  4. Delta – T set point = 15°C
  5. RH Set point = 45% unless humid then 35%
  6. RH Control = ON (except in battery mode)
  7. Flow set point = 16.7 LPM
  8. Type = Actual
  9. External RH = yes if hooked up
  10. Pump protect = Off, except in battery mode then On
  11. Min Restart voltage = 12.5 volts
  12. Standard conditions temperature = 25°C (don’t adjust)
  13. Bam calibrate Zero = ### Span = ### (don’t adjust)

3.Clear memory and alarm

a)In main menu scroll to memory and press menu/select

b)Press clear for both alarm log and data logger

c)When all cleared , memory = 100% remaining and 182 days remaining

4. (Calibration) put instrument in calibration mode by scrolling to field calibration

a)scroll to pump test, then leak test

  1. run leak test, should be below .5 LPM if not system should be cleaned

b)scroll to temperature

  1. place Delta Cal on EBAM head
  2. choose high temp and calibrate to Delta Cal

c)scroll to pressure, calibrate to Delta Cal

d)Scroll to flow

  1. Change flow to 14.0
  2. Calibrate to 14.0 (delta Cal, reference, EBAM should all read 14.0 when calibrated)
  3. Change flow to 17.5
  4. Calibrate to 17.5 (delta Cal, reference, EBAM should all read 17.5 when calibrated)
  5. When finished, check 16.7 flow (EBAM and Delta Cal should both read the same, if not then go through steps I & II again until all values are the same.
  6. EBAM is ready to operate, will take 1 hour to warm up and 1st hour data is void.