Application for City of Rollingstone Building Permit

61 Main StreetRollingstoneMinnesota55969 Telephone (507) 689-4110  Fax (507) 689-4439

Permit Number ______Date Application Received ______

Property Owner Information

Name: ______Telephone: ______

Mailing Address: ______Telephone:______

City/State/Zip:______

Applicant Information (if other than owner)

Name: ______Telephone: ______

Mailing Address: ______Telephone: ______

City/State/Zip: ______

Project Information

Building Permit Application Form Revised 02/01/2008

Site Address: ______

Current Zoning: ______

Building Permit Application Form Revised 02/01/2008

Legal Description: ______

General Contractor: ______License #: ______Telephone: ______

Plumbing Contractor: ______License #: ______Telephone: ______

Type of Permit (Circle One): Residential Non-Residential If not residential, specify: ______

Type of Work: (Check all that apply) New ______Addition ______Remodel ______Re-shingle ______

Deck ______Reside ______Garage ______Windows ______

Other (Describe) ______

Description of Proposed Project or Work to be Completed: ______

______

MinimumProperty Line Setbacks: Street Setback______feet Side Setback______feet Rear Setback_____ feet

Note: A separate State of Minnesota Electrical Permit is required for electrical work.

Applicant Statement and Acknowledgements

Building Permits shall become null and void if the authorized work is not commenced within 180 days from the date of permit approval, or if the building or the authorized work is suspended or abandoned for 180 days at any time after the work has commenced. (UBC 106.4.4)

I, the applicant, certify that information on this application is true, complete, and correct. If a permit is issued, all work done and all materials used shall be in conformance with the approved plans and specifications, and in compliance with the requirements of the Minnesota State Building Code and other applicable statutes and ordinances that regulate building construction or use.

Printed Name: ______Signature: ______

Building Permit Number ______

Building Permit Name ______

Page 2

THE FOLLOWING TO BE COMPLETED BY THE CITY

Building Permit Application Form Revised 02/01/2008

Zoning Permit Approved by ______Date ______

Zoning Permit Denied by ______Date ______

Variance Application Filed: (Circle One) Yes No

If Yes, Date Variance Application Filed: ______

Variance Hearing by Board of Adjustment: Date ______

Approved: (Circle one) Yes No

Building Official Approval ______Date _______

BUILDING PERMIT FEES

Building Permit Application Form Revised 02/01/2008

Building Valuation: $ ______General Permit Fee: $ ______

Plumbing Valuation: $______Plumbing Permit Fee: $ ______

Mechanical Valuation: $______Mechanical Permit Fee: $ ______

Total Valuation: $ ______State Surcharge Fee: $______

Total Valuation: $______Plan Check Fee: $______

Total Fees: $ ______

Date Paid:______

Building Permit Application Form Revised 02/01/2008

BUILDING PERMIT CHARGES FOR NEW HOME CONSTRUCTION

Water Availability Charge: $ 800.00 per lot

Sewer Availability Charge: $1,200.00 per lot

Water Meter Installation Charge: $ 200.00

Total Charges: $2,200.00

Date Paid: ______

Rules, Regulations and Applicable Fees for a Rolling MeadowsBuilding Permit Application

1. The Site Plan must adhere to all rules and regulations contained in the Storm Water Pollution Prevention Plan. Sweetwater Development is required to provide a copy of the Storm Water Pollution Prevention Plan to all lot owners at the time a lot is purchased. Not complying with the Storm Water Pollution Prevention Plan rules and regulations could delay the issuance of a Building Permit

2. The Site Plan must incorporate an On-Lot Infiltration System. Refer to page 7 of the Storm Water Pollution Prevention Plan.

3. The Site Plan must include drainage patterns on the lot.

4. The Site Plan must include street, side yards and rear yard building setbacks. Owners of corner lots should check with the City Zoning Administrator for setback requirements.

5. Sweetwater Development has the responsibility to inform potential lot buyers of the City of Rollingstone water and sewer connection fees that are payable when the Building Permit is issued. These fees are as follows:

Water Availability Charge $ 800.00 per lot

Sewer Availability Charge $1,200.00 per lot

  1. The City of Rollingstone charges a water meter and installation fee of $100.00 which is payable when the Building Permit is issued.
  2. A Building Permit Application can take up to thirty days to process.

Building Permit Application Form Revised 02/01/2008

Building Permit Application Form Revised 02/01/2008