WIMES 8.02 (E)Page 1
APPENDIX D1 – equipment DATA SHEETS
PROJECT TITLE (P) / DOCUMENT REFERENCE (P)PROJECT REFERENCE NUMBER (P) / REVISION (P)
PROJECT LOCATION (P) / DATE (P)
EQUIPMENT SUPPLIER (P/S) / REFERENCE DRGS (P)
(included/not included)
ISSUE 3OCTOBER 2011
WIMES 8.02 (E)Page 1
* - indicates Purchaser’s default requirement
2.0 GENERAL
2.1 General
1 / Dosing Application (P)3.0 OPERATING ENVIRONMENT AND SITE DETAILS
1 / Operating Environment (P)Site Location ()
Inland
Coastal
1 / Equipment Location ()
Indoors (unheated)
Indoors (heated)
Outdoors
1 / Ambient AirTemperatureRange ()
Minimum
Maximum
1 / Hazardous Area Requirements
Hazardous area (Y/N)
Zone
Gas Group
Temperature Class
1 / EMC Environment ()
Class A - Domestic, commercial and light industrial
Class B - Industrial
2 / Special Environmental Hazards (P)
4.0 PROCESS FLUID DETAILS, LIME PROPERTIES AND DOSING CONDITIONS
4.1 Process Fluid Type and Properties
1 / Type (P)1 / Properties (P) / Min / Av. / Max
TSS (mg/l)
TDS (mg/l)
BOD (mg/l)
pH
Total alkalinity
(mg CaCO3/l)
Colour (°H)
Turbidity (FTU)
Conductivity (S/cm)
4.2 Lime Supplier and Properties
1 / Lime Supplier (P)2 / Lime Properties (P)
Density (Kg/m3)
4.3 Dosing Conditions (Process Fluid Flow Rate and Pressure)
1 / Process Fluid Flow Rates (P) / QMin(l/s) / QMean
(l/s) / Qmax
(l/s)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
1 / Max. Rate of Change of Flow (l/s2) (P)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
2 / Process Fluid Pressures (P) / PMin
(bar) / PMean
(bar) / Pmax
(bar)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
5.0 PERFORMANCE SPECIFICATION
5.1 General
1 / Asset Life (years) (P)5.2 Process Performance
1 / Required Process Fluid pH Range (P)2 / Process Delay and Rise Time (P)
6.0 DESIGN SPECIFICATION
6.1.1 General
5 / Flushing Water Softening System Reqd. (Y/N) (P/S)5 / Softening System Details (P/S)
6.1.3 Bunding and Secondary Containment
6.1.3.1 Bunding
1 / Bund Material and Type of Bund Construction (P/S)2 / Bund Capacity (l) (P/S)
6.1.3.2 Secondary Containment
1 / Details of Secondary Containment Systems Required/Provided (P/S)6.1.4 Weights and Lifting Arrangements
1 / Weights (S)Component (specify) / Weight (kg)
1 / Heaviest maintenance lift (S)
1 / Heaviest erection lift (S)
6.1.7 Drive Systems
Refer to Appendix D2.
6.1.10.1 Emergency Washing Facilities
1 / Details of Emergency Washing Facilities Required/Provided (P/S)6.1.11 O & M Manuals
1 / Type of O & M Manuals Required/Provided (P/S)ISSUE 3OCTOBER 2011
WIMES 8.02 (E)Page 1
6.2 Delivery Section
6.2.1 Bulk Tanker Deliveries
6.2.1.1 Filling Point
1 / Filling Point Details (P/S)2 / Filling Point Connection Details (i.e. Size/Type of Fitting, Flange Details, etc.) (P/S)
3 / Details of Interlocking Facilities Required/Provided (P/S)
6.2.1.2 Filling Line
1 / Filling Line Size and Materials (P/S)2 / Filling Line Inlet Valve Details (P/S)
6.2.1.3 Filling Panel
1 / Filling Panel Details (P/S)6.3 Bulk Storage Section (BSS)
6.3.1 General
2 / Silo Location (P/S)2 / Building/Enclosure Details (If Appropriate) (P/S)
3 / Silo Details (i.e. Number of Silos, Silo Capacity, Silo Materials/Specifications, etc.) (P/S)
6.3.2 Silo Ancillary Equipment
1 / Method of Preventing Bridging/Rat-Holing of the Powder (P/S)6.3.3 Silo Instrumentation
1 / Silo Instrumentation Requirements/Provisions(i.e. Types of Probes/Sensors, Location of Probes/Sensors, etc.) (P/S)6.3.4 Silo Access and Inspection Requirements
1 / Silo Manway and Inspection Hatch/Cover Requirements/Provisions (i.e. Size, Location etc.) (P/S)2 / Silo Access Requirements/Provisions (i.e. Details of Ladders, Stairways, Platforms, Guard-Rails, etc.) (P/S)
6.4 Batching Section
6.4.1 General
2 / Building/Enclosure Details (P/S)6.4.2 Transfer of Lime from the BSS to the Batching Section
1 / Method of Lime Transfer (P/S)2 / Transfer System Details (P/S)
6.4.3 Batching System(s)
1 / Range of Concentrations Required (P/S)3 / Batching System Accuracy and Repeatability (%) (P/S)
3 / Batching System Details (i.e. Mixing/Ageing, Standby and Dosing Tank Materials/Standards, Pipework/Connections, Instrumentation etc.) (P/S)
6.4.4 Make-Up Water System
1 / Make-Up Water System Details (P/S)6.4.5 Water Softening System (If Required/Provided)
1 / Type and Properties of the Make-Up Water (P)2 / Water Softening System Required/Provided (Y/N) (P/S)
2 / Water Softening System Details (P/S)
6.4.6 Access Requirements
1 / Batching Section Access Requirements/Provisions (i.e. Details of Ladders, Stairways, Platforms, Guard-Rails, etc.) (P/S)6.5 Dosing Section
6.5.1 General
2 / Building/Enclosure Details (P/S)6.5.2 Dosing Pumps
1 / Dosing Pump Details (i.e. Number of Pumps, Pump Type/Materials, Pump Manufacturer and Model, Pump Configuration/Arrangement, etc.) (P/S)2 / Relevant Pump Performance Information (e.g. Maximum Discharge Pressure and Flow Rate, Self-Priming Height, Accuracy, Turn Down Ratio, etc.) (S)
6.5.3 Dosing Pump Inlet and Outlet Pipework and Accessories
1 / Inlet Piping Details(i.e. NB, Pressure Rating, Materials, Type of Construction, etc.) (P/S)2 / Inlet Pipework Valves, Accessories and Instrumentation(P/S)
3 / Outlet Piping Details(i.e. NB, Pressure Rating, Materials, Type of Construction etc.) (P/S)
4 / Outlet Pipework Valves, Accessories and Instrumentation(P/S)
5 / Required TemperatureRange (°C) (P/S)
5 / Pipework Insulation and Electric Surface Heating System Details (P/S)
6.6 Carrier Water System (If Required/Provided)
1 / Carrier Water System Required/Provided (Y/N) (P/S)1 / Lime Slurry Concentration after Dilution (%) (P/S)
2 / Carrier Water Requirements/Provisions (i.e. Type/Source, Pressure, Flow Rate, etc.) (P/S)
3 / Type of Carrier Water System Required/Provided (P/S)
3 / Carrier Water System Details (P/S)
5 / Carrier Water Softening System Required/Provided (Y/N) (P/S)
5 / Carrier Water Softening System Details (P/S)
6.7Lime Slurry/Limewater Dosing Arrangements
1 / Process Main/Channel Details (P/S)2 / WIF/Sparge System Details (P/S)
6.8 Mixing Facilities (Lime Slurry/Limewater/ with Process Fluid)
1 / Mixing Facilities (e.g. Static Mixer Specification etc.) (P/S)6.9 Sampling System (If Required/Provided)
1 / Sampling System Required/Provided (Y/N) (P/S)3 / Sampling System Details (P/S)
6.10 Control System
6.10.2 Dosing Control Panel (DCP) (If Required/Provided)
1 / DCP Required/Provided (Y/N) (P/S)1 / DCP Details (P/S)
6.10.3 Process Control and Monitoring Instrument Requirements/Provisions
1 / Process Control and Monitoring Instrument Requirements/Provisions (P/S)6.10.4 Control Philosophy
1 / Reference for Purchaser’s Particular Specification (P)ISSUE 3OCTOBER 2011
WIMES 8.02 (E)Page 1
APPENDIX D2 – DRIVE SYSTEM DATA SHEET
(TO BE COMPLETED FOR EACH DRIVE SYSTEM > 1.1 kW)
ISSUE 3OCTOBER 2011
WIMES 8.02 (E)Page 1
Drive No.:
1 / Driven Equipment (P/S)2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio
Drive No.:
1 / Driven Equipment (P/S)2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio
Drive No.:
1 / Driven Equipment (P/S)2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio
Drive No.:
1 / Driven Equipment (P/S)2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio
ISSUE 3OCTOBER 2011
WIMES 8.02 (E)Page 1
APPENDIX E – SUPPLIERS SUPPLEMENTARY DATA SHEET INFORMATION
Clause / Supplementary InformationISSUE 3OCTOBER 2011