WIMES 8.02 (E)Page 1

APPENDIX D1 – equipment DATA SHEETS

PROJECT TITLE (P) / DOCUMENT REFERENCE (P)
PROJECT REFERENCE NUMBER (P) / REVISION (P)
PROJECT LOCATION (P) / DATE (P)
EQUIPMENT SUPPLIER (P/S) / REFERENCE DRGS (P)
(included/not included)

ISSUE 3OCTOBER 2011

WIMES 8.02 (E)Page 1

* - indicates Purchaser’s default requirement

2.0 GENERAL

2.1 General

1 / Dosing Application (P)

3.0 OPERATING ENVIRONMENT AND SITE DETAILS

1 / Operating Environment (P)
Site Location ()
Inland
Coastal
1 / Equipment Location ()
Indoors (unheated)
Indoors (heated)
Outdoors
1 / Ambient AirTemperatureRange ()
Minimum
Maximum
1 / Hazardous Area Requirements
Hazardous area (Y/N)
Zone
Gas Group
Temperature Class
1 / EMC Environment ()
Class A - Domestic, commercial and light industrial
Class B - Industrial
2 / Special Environmental Hazards (P)

4.0 PROCESS FLUID DETAILS, LIME PROPERTIES AND DOSING CONDITIONS

4.1 Process Fluid Type and Properties

1 / Type (P)
1 / Properties (P) / Min / Av. / Max
TSS (mg/l)
TDS (mg/l)
BOD (mg/l)
pH
Total alkalinity
(mg CaCO3/l)
Colour (°H)
Turbidity (FTU)
Conductivity (S/cm)

4.2 Lime Supplier and Properties

1 / Lime Supplier (P)
2 / Lime Properties (P)
Density (Kg/m3)

4.3 Dosing Conditions (Process Fluid Flow Rate and Pressure)

1 / Process Fluid Flow Rates (P) / QMin
(l/s) / QMean
(l/s) / Qmax
(l/s)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
1 / Max. Rate of Change of Flow (l/s2) (P)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
2 / Process Fluid Pressures (P) / PMin
(bar) / PMean
(bar) / Pmax
(bar)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4

5.0 PERFORMANCE SPECIFICATION

5.1 General

1 / Asset Life (years) (P)

5.2 Process Performance

1 / Required Process Fluid pH Range (P)
2 / Process Delay and Rise Time (P)

6.0 DESIGN SPECIFICATION

6.1.1 General

5 / Flushing Water Softening System Reqd. (Y/N) (P/S)
5 / Softening System Details (P/S)

6.1.3 Bunding and Secondary Containment

6.1.3.1 Bunding

1 / Bund Material and Type of Bund Construction (P/S)
2 / Bund Capacity (l) (P/S)

6.1.3.2 Secondary Containment

1 / Details of Secondary Containment Systems Required/Provided (P/S)

6.1.4 Weights and Lifting Arrangements

1 / Weights (S)
Component (specify) / Weight (kg)
1 / Heaviest maintenance lift (S)
1 / Heaviest erection lift (S)

6.1.7 Drive Systems

Refer to Appendix D2.

6.1.10.1 Emergency Washing Facilities

1 / Details of Emergency Washing Facilities Required/Provided (P/S)

6.1.11 O & M Manuals

1 / Type of O & M Manuals Required/Provided (P/S)

ISSUE 3OCTOBER 2011

WIMES 8.02 (E)Page 1

6.2 Delivery Section

6.2.1 Bulk Tanker Deliveries

6.2.1.1 Filling Point

1 / Filling Point Details (P/S)
2 / Filling Point Connection Details (i.e. Size/Type of Fitting, Flange Details, etc.) (P/S)
3 / Details of Interlocking Facilities Required/Provided (P/S)

6.2.1.2 Filling Line

1 / Filling Line Size and Materials (P/S)
2 / Filling Line Inlet Valve Details (P/S)

6.2.1.3 Filling Panel

1 / Filling Panel Details (P/S)

6.3 Bulk Storage Section (BSS)

6.3.1 General

2 / Silo Location (P/S)
2 / Building/Enclosure Details (If Appropriate) (P/S)
3 / Silo Details (i.e. Number of Silos, Silo Capacity, Silo Materials/Specifications, etc.) (P/S)

6.3.2 Silo Ancillary Equipment

1 / Method of Preventing Bridging/Rat-Holing of the Powder (P/S)

6.3.3 Silo Instrumentation

1 / Silo Instrumentation Requirements/Provisions(i.e. Types of Probes/Sensors, Location of Probes/Sensors, etc.) (P/S)

6.3.4 Silo Access and Inspection Requirements

1 / Silo Manway and Inspection Hatch/Cover Requirements/Provisions (i.e. Size, Location etc.) (P/S)
2 / Silo Access Requirements/Provisions (i.e. Details of Ladders, Stairways, Platforms, Guard-Rails, etc.) (P/S)

6.4 Batching Section

6.4.1 General

2 / Building/Enclosure Details (P/S)

6.4.2 Transfer of Lime from the BSS to the Batching Section

1 / Method of Lime Transfer (P/S)
2 / Transfer System Details (P/S)

6.4.3 Batching System(s)

1 / Range of Concentrations Required (P/S)
3 / Batching System Accuracy and Repeatability (%) (P/S)
3 / Batching System Details (i.e. Mixing/Ageing, Standby and Dosing Tank Materials/Standards, Pipework/Connections, Instrumentation etc.) (P/S)

6.4.4 Make-Up Water System

1 / Make-Up Water System Details (P/S)

6.4.5 Water Softening System (If Required/Provided)

1 / Type and Properties of the Make-Up Water (P)
2 / Water Softening System Required/Provided (Y/N) (P/S)
2 / Water Softening System Details (P/S)

6.4.6 Access Requirements

1 / Batching Section Access Requirements/Provisions (i.e. Details of Ladders, Stairways, Platforms, Guard-Rails, etc.) (P/S)

6.5 Dosing Section

6.5.1 General

2 / Building/Enclosure Details (P/S)

6.5.2 Dosing Pumps

1 / Dosing Pump Details (i.e. Number of Pumps, Pump Type/Materials, Pump Manufacturer and Model, Pump Configuration/Arrangement, etc.) (P/S)
2 / Relevant Pump Performance Information (e.g. Maximum Discharge Pressure and Flow Rate, Self-Priming Height, Accuracy, Turn Down Ratio, etc.) (S)

6.5.3 Dosing Pump Inlet and Outlet Pipework and Accessories

1 / Inlet Piping Details(i.e. NB, Pressure Rating, Materials, Type of Construction, etc.) (P/S)
2 / Inlet Pipework Valves, Accessories and Instrumentation(P/S)
3 / Outlet Piping Details(i.e. NB, Pressure Rating, Materials, Type of Construction etc.) (P/S)
4 / Outlet Pipework Valves, Accessories and Instrumentation(P/S)
5 / Required TemperatureRange (°C) (P/S)
5 / Pipework Insulation and Electric Surface Heating System Details (P/S)

6.6 Carrier Water System (If Required/Provided)

1 / Carrier Water System Required/Provided (Y/N) (P/S)
1 / Lime Slurry Concentration after Dilution (%) (P/S)
2 / Carrier Water Requirements/Provisions (i.e. Type/Source, Pressure, Flow Rate, etc.) (P/S)
3 / Type of Carrier Water System Required/Provided (P/S)
3 / Carrier Water System Details (P/S)
5 / Carrier Water Softening System Required/Provided (Y/N) (P/S)
5 / Carrier Water Softening System Details (P/S)

6.7Lime Slurry/Limewater Dosing Arrangements

1 / Process Main/Channel Details (P/S)
2 / WIF/Sparge System Details (P/S)

6.8 Mixing Facilities (Lime Slurry/Limewater/ with Process Fluid)

1 / Mixing Facilities (e.g. Static Mixer Specification etc.) (P/S)

6.9 Sampling System (If Required/Provided)

1 / Sampling System Required/Provided (Y/N) (P/S)
3 / Sampling System Details (P/S)

6.10 Control System

6.10.2 Dosing Control Panel (DCP) (If Required/Provided)

1 / DCP Required/Provided (Y/N) (P/S)
1 / DCP Details (P/S)

6.10.3 Process Control and Monitoring Instrument Requirements/Provisions

1 / Process Control and Monitoring Instrument Requirements/Provisions (P/S)

6.10.4 Control Philosophy

1 / Reference for Purchaser’s Particular Specification (P)

ISSUE 3OCTOBER 2011

WIMES 8.02 (E)Page 1

APPENDIX D2 – DRIVE SYSTEM DATA SHEET

(TO BE COMPLETED FOR EACH DRIVE SYSTEM > 1.1 kW)

ISSUE 3OCTOBER 2011

WIMES 8.02 (E)Page 1

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

ISSUE 3OCTOBER 2011

WIMES 8.02 (E)Page 1

APPENDIX E – SUPPLIERS SUPPLEMENTARY DATA SHEET INFORMATION

Clause / Supplementary Information

ISSUE 3OCTOBER 2011