A.1 Opening of the Meeting
A.1.1 Introductions
The Chair opened the meeting with group introduction.
A.1.2 Attendance
Membership count was taken with the following results: 27 of 42 members were present with 82 guests,for a total of 109 attendees. There were 8 new membership requests. There was a quorum.
A.1.3 Chairman’s Remarks
The Chair asked for a motion to approve the meeting agenda that was distributed prior to the meeting, a motion was made and seconded with no objections.
The Chair asked for a motion to approve the S15 Memphis minutes that was distributed prior to the meeting, a motion was madeand secondedwith no objections.
The Chair asked that guest’s take careful consideration before asking for membership in the groups. There were a couple bushings meetings that did not have membership in attendance to have a quorum. Before asking for membership they should be confident in their ability to attend meetings regularly, as their absence can stymie progression of the entire group if a quorum cannot be formed.
The Chair also reminded people to make sure their AM System information is up to date as there were a couple bounced back emails when trying to distribute information to the members.
Six new members were added to the roster and introduced to the SC.
The Chair presented the Standards Status Report for bushings, see Appendix A. It was noted that an extension was granted for PC57.19.04 and that a new PAR was granted for Distribution Bushings, PC57.19.02.
A.2 Working Group and Taskforce reports
A.2.1 C57.19.00-2004 – Keith Ellis, Chair
No Meeting was held. Mr. Ellis informed SC that the review group that was form at the last meeting had only supplied one suggested change for consideration. The Chair asked if there were any further comments or if any of the review group would like more time to complete the task. No comments were received and therefore he asked if there were any objections to setting this task as closed. No objections were made.
A.2.2 WG PC57.19.01-2000 – Dr. Shibao Zhang, Chair; David Wallach, Secretary
See complete minutes in Appendix B of this report.
A.2.3 C57.19.100-2012 – Tommy Spitzer, Chair (not present)
Prior to this meeting Mr. Anthony Natale brought forth an issue he is confronted with quite frequently. There is a contradiction between the Application Guide, C57.19.100-2012 and the General Requirements and TestStandard, C57.19.00-2004. The Guide states that bushings tested per 19.00 are only rated for 55K rise transformer and therefore bushings used in 65K rise transformer need to be derated to account for the difference. However, the Standard 19.00 states that bushings tested per the standard are rated for 65K rise transformers. This causes confusion among the OEMs and their end users. The Chair of the Guide, Mr. Spitzer, provided a statement that was shown to the SC, see Appendix C. In short, Mr. Spitzer stated that the Guide needs to be revised to correlate with the Standard and he will begin working on the next revision to the Guide next year.
A.2.4 WG PC57.19.04 – Scott Digby, Chair; JD Brafa, Vice Chair; Secretary, Jim Campbell
See complete minutes in Appendix D of this report.
A.2.5 IEC/IEEE 65700.19.03 – Les Rechsiedler (IEEE) and John Graham (IEC), Co-Chairs
The first dual logo standard was approved June of 2014, as such no meeting was held.
A.2.6 WG PC57.19.02 Distribution Transformer Bushings – Steven Shull, Chair; Ed Smith, Vice Chair
See complete minutes in Appendix E of this report.
A.2.7 TF Composite Bushings –John Graham, Chair; Secretary, Robert Middleton
See complete minutes in Appendix F of this report.
A.3 External Liaison Reports
A.3.1 IEC Bushing Standards Activity – John Graham, IEEE Liaison
See complete minutes in Appendix G of this report.
A.3.2 IEEE 693 – Eric Weatherbee, IEEE Liaison
There have been no new meetings or WG correspondence in regards to IEEE 693 as the Recommended Practice is being prepared for Ballot. Mr. Weatherbee had contacted The Chair of 693, Mr. Fujisaki, for any updates to be provided to the SC. Mr. Fujisaki stated that the Ballot is still on schedule for this year and was recently received back from word processing.
A.3.3 WG PC57.160 Guide for PD Meas. in Bushings and Inst. Trans. – Thang Hochanh, Chair
See complete minutes inAppendix H of this report.
A.4 Unfinished Business
A.4.1 Partial discharge in bushings
This issue was raised at the last meeting by a Transformer OEM in regards to PD that can develop during testing at OEM factories which lead to a lengthy discussion amongst the SC. The acting Chair informed the group that upon discussion with The Chair, Mr. Zhao, it was decided that the proper steps would be to pass the issue on to the Dielectrics Test group first which was done prior to this meeting. The Chair also noted that this area of coverage (OEM testing of bushings) is lacking, and this may be a good opportunity to start forming a document. If the Dielectrics and Test group does not wish to handle the issue the Bushing SC will make a decision on how to proceed.
A.5 New Business
There was no new business