/ County
Section
Route
District
Agreement on Accuracy / Contract No.
of Plan Quantities / Job No.
Project
Quantity / Unit / Pay Item / Code
Number
HA / TREE REMOV HECTARES / M2010500
CU M / EARTH EXCAVATION / M2020010
CU M / CHANNEL EXCAV / M2030100
CU M / ROCK EXCAV CHANNEL / M2030200
CU M / FURNISHED EXCAVATION / M2040800
CU M / GRAN EMBANK SPEC / M2060200
CU M / TRENCH BACKFILL / M2080150
SQ M / TOP SOIL F & P / M211
CU M / TOPSOIL EXCAVATION & PLACE / M2112500
SQ M / COMPOST FURNISH & PLACE / M2114
HA / MOWING / M2500750
HA / SEEDING CL / M2500
HA / MULCH METHOD / M2510
SQ M / EROSION CONTROL BLANKET / M2510630
SQ M / PROCESSING MODIFIED SOIL / M3020
CU M / SUB GRAN MAT A / M3110020
SQ M / SUB GRAN MAT A / M3110
CU M / SUB GRAN MAT B / M3111020
SQ M / SUB GRAN MAT B / M3111
CU M / SUB GRAN MAT C / M3112020
SQ M / SUB GRAN MAT C / M3112
SQ M / STAB SUB-BASE 100 / M3120100
CU M / AGG BASE CSE A / M3510020
SQ M / AGG BASE CSE A / M3510
CU M / AGG BASE CSE B / M3511020
SQ M / AGG BASE CSE B / M3511
SQ M / PROC SOIL-CEM BC / M3520
SQ M / PCC BSE CSE / M3530
SQ M / HESPCC BSE CSE / M3532
SQ M / PCC BSE CSE W / M3540
SQ M / HMA BASE CSE / M3550
SQ M / HMA BC WID / M3560
SQ M / BASE CSEWID / M3565
SQ M / PREPARATION OF BASE / M3580100
CU M / AGG SURF CSE A / M4020020
SQ M / AGG SURF CSE A / M4020
SQ M / HMAPAVT FD / M407
SQ M / PCCPVT / M4200
SQ M / HESPCCPVT / M4204
SQ M / PROTECTIVE COAT (pavement) / M4205200
SQ M / CON REINFPCCPVT / M4210
SQ M / C R HESPCCPVT / M42122
SQ M / PROTECTIVE COAT (pavement) / M4218000
SQ M / PVT REINFORCEMENT / M4210615
SQ M / PAVEMENT REMOVAL / M4402000
SQ M / DRIVEWAY PAVEMENT REMOVAL / M4402010
CU M / AGGREGATE SHLDS A / M4810010
SQ M / AGGREGATE SHLDS A / M4810
SQ M / HMA SHOULDERS / M4820
SQ M / PC CONCRETE SHOULDERS / M483
CU M / STRUCTURE EXCAVATION / M5020100
CU M / CONCRETE ENCASEMENT / M5030280
CU M / CONCSTRUCT / M5030350
CU M / CONC SUP-STR / M5030360
CU M / SEAL COAT CONC / M5030400
CU M / CONCRETE HANDRAIL / M5030410
SQ M / PROTECTIVE COAT(structures) / M5030450
SQ M / PRECCONC BR SLAB / M5040005
SQ M / P PCONC DK BM / DP / M5040
METER / F & E P P CON I-BM / M504
KG / REINFORCEMENT BARS / M5080105
KG / REINF BARS, EPOXY CTD / M5080205
SQ M / SLOPE WALL / M5110
CU M / CONC BOX CUL / M5403000
SQ M / MEMBRANE WATERPROOF / M5800100
(and the following items, as permitted by the Standard Specifications or contract provisions):
We hereby agree that when the project is constructed essentially to the lines, grades and dimensions shown on the plans, no further measurement will be required for the above items and payment will be made for the quantities shown in the contract except that if errors are discovered after work has been started, appropriate adjustments will be made.
When the plans have been altered or when disagreement exists between the Contractor and the Engineer as to the accuracy of the plan quantities, either party shall, before any work is started which would affect the measurement, have the right to request in writing and thereby cause the quantities involved to be measured as specified.
Contractor
Signature and title / Name of firm / Date

Department of Transportation

Regional Engineer / Date