Section 6-2.03. Use for Department-furnished materials.
Add items as necessary.
Delete any item not furnished by the Department.
Change Model 170 controller assembly as applicable.
Insert the plant numbers as shown on the plans and address where the Contractor is to pick them up.
Add to section 6-2.03:
1
The Department furnishes you with:
• Sign panels for roadside signs and overhead sign structures
• Sign overlay panels for roadside signs and overhead sign structures
• Mast arm sign hanger assemblies
• Laminated wood box posts with metal caps for roadside signs
• Hardware for mounting sign panels as follows:
Aluminum closure inserts for multiple panel laminated signs
A-1 and A-2 mounting hardware for mounting laminated sign panels on overhead sign structures
A-3 mounting hardware for mounting overhead formed panels
• Disks for survey monuments
• Marker panels, including reflectors, for Type N, Type P, and Type R object markers
• Concrete barrier markers
• Magnetic detector amplifiers and magnetic sensing elements
• Loop detector sensor units
• Model 170 controller assembly, including controller unit, completely wired controller cabinet, and detector sensor units
• Modems
• Individual or axle type scales for materials hauling equipment on bridges
• Components of battery backup system as follows:
Inverter/charger unit
Power transfer relay
Manually-operated bypass switch
Battery harness
Utility interconnect wires
Battery temperature probe
Relay contact wires
• Plants numbered _____ on the plans. Pick these plants up at _____.
• Recycled water signs, labels, decals, and tags
2. Use if the Department furnishes controller assemblies. Insert address.
The Department furnishes you with completely wired controller cabinets with auxiliary equipment but without controller unit at _____. At least 48 hours before you pick up the materials, inform the Engineer of what you will pick up and when you will pick it up.
3. Use if the Department furnishes a changeable message sign. Insert address.
The Department furnishes you with a Model 500 changeable message sign, wiring harness, and controller assembly, including the controller unit and completely wired cabinet, at _____. At least 48 hours before you pick up the materials, inform the Engineer of what you will pick up and when you will pick it up.
4. Use if the Contractor is to pick up Department-furnished sign panels and overlay panels from the district warehouse. Insert address and telephone number.
The Department furnishes you with sign panels and overlay panels at the district warehouse at _____. At least 48 hours before you pick up the materials, inform the Engineer and the district warehouse manager of what you will pick up and when you will pick it up. Also, inform the manager of the number, type, and size of the sign panels and Contract number. The manager's telephone number is (___) ___-____.
5. Use if the Department furnishes recycled materials. Insert material, address, and telephone number.
The Department furnishes you with _____ at the district recycle center at _____. At least 48 hours before you pick up the materials, inform the Engineer and the district recycle coordinator of the Contract number, what you will pick up, and when you will pick it up. The coordinator's telephone number is (___) ___-____.
6. Use if the Department does not furnish replacement plants.
You must furnish replacement plants. The Department does not pay you for the replacement plants.
7. Use if the Department furnishes replacement plants. Insert each plant name and its deduction.
The Department furnishes you with replacement plants at the same location as the original plants. For each replacement plant, the Department deducts the amount shown in the following table. If you do not plant all of the replacement plants before work completion, return unplanted plants to the location designated by the Engineer. If the plants are fit for future use, the Department credits you for them.
Replacement-Plant DeductionsBotanical name (common name) / Deduction per plant ($)