U.S. DEPARTMENT OF ENERGY
Technical Qualification Program — Confinement Ventilation and Process Gas Treatment Qualification Card
Participant: / Technical Qualification Program
“TQP”
Functional Area Qualification Standard
Confinement Ventilation and Process Gas Treatment
Qualification Card / Qualification
Card
Issue Date:
Projected Completion Date: / Standard
Issue Date: / October 2013
Office/Division: / Revision:

Note: When regulations, Department of Energy Directives, or other industry standards are referenced in the Qualification Standard, the most recent version should be used.

# / Required Competencies / Competency Level / Learning Method / Evaluation Method / Incumbent Initials & Date / Qualifying Official Signature / Date /
I. CV&PGT Engineering
1. / CV&PGT personnel must demonstrate a working level knowledge of the engineering principles and practices for radioactive contamination control using the confinement ventilation system. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
2. / CV&PGT personnel must demonstrate a working level knowledge of design guideline associated with selecting capture velocity for hoods, gloveboxes, airlocks, and change rooms for confinement. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
3. / CV&PGT personnel must demonstrate a working level knowledge of particle dynamics and air filtration theory. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
4. / CV&PGT personnel must demonstrate a familiarity level knowledge of the theory and operation of Dust Collection and Filtration. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
5. / CV&PGT personnel must demonstrate a working level knowledge of Fire Protection Considerations in Nuclear Facility Ventilation Design. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
6. / CV&PGT personnel must demonstrate a working level knowledge of HEPA filter and housings. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
7. / CV&PGT personnel must demonstrate a working level knowledge of HEPA filter qualification (Proof-of-Design) requirements and qualification process. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
8. / CV&PGT personnel must demonstrate a working level knowledge of HEPA filter in-place testing and inspection requirements and process, including testing equipment theory and operation. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
9. / CV&PGT personnel must demonstrate a working level knowledge of HEPA filter independent quality assurance (Filter Test Facility) requirements and process. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
10. / CV&PGT personnel must demonstrate a working level knowledge of the basic design, construction, and operation of gloveboxes and fume hoods. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
11. / CV&PGT personnel must demonstrate working level knowledge of fan and blower operation and uses. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
12. / CV&PGT personnel must demonstrate working level knowledge of valve and damper operation and uses. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
13. / CV&PGT personnel must demonstrate working level knowledge of control system principles of operation and uses. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
14. / CV&PGT personnel must demonstrate a familiarity level knowledge of Indoor Air Quality (IAQ), Concentration of Toxic Chemicals, and Dilution Ventilation. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
15. / CV&PGT personnel must demonstrate a familiarity level knowledge of Psychrometric Charts and Relative Humidity control. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
16. / CV&PGT personnel must demonstrate a working level knowledge of Engineering Drawings. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
17. / CV&PGT personnel must demonstrate a familiarity level knowledge of Stack monitoring systems. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
18. / CV&PGT personnel must demonstrate a familiarity level knowledge of High Performance Building. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
19. / CV&PGT personnel must demonstrate a familiarity level knowledge of Air Handling Units. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
20. / CV&PGT personnel must demonstrate a familiarity level knowledge of the construction and operation of heat exchangers. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
21. / CV&PGT personnel must demonstrate a familiarity level knowledge of the theory and operation of HVAC Chillers. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
22. / CV&PGT personnel must demonstrate a familiarity level knowledge of flammable gas generation and venting to prevent exceeding Lower Flammable Limit (LFL) concentration. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
23. / CV&PGT personnel must demonstrate a familiarity level knowledge of PGT. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
24. / CV&PGT personnel must demonstrate a working level knowledge of DOE O 420.1C, Facility Safety, and of the associated guidance of DOE G 420.1-1A, Nonreactor Nuclear Safety Design Guide for Use with DOE O 420.1C, Facility Safety, as they relate to confinement ventilation and process gas treatment systems. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
25. / CV&PGT personnel must demonstrate a familiarity level knowledge of applicable codes and standards and DOE handbooks. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
26. / CV&PGT personnel must demonstrate a working level knowledge of CM. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
27. / CV&PGT personnel must demonstrate a familiarity level knowledge of System Design Descriptions. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
28. / CV&PGT personnel must demonstrate a working level knowledge of maintenance management practices. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
29. / CV&PGT personnel must demonstrate a working level knowledge of assessment techniques to assess facility performance and contractor design and construction activities, report results, and follow-up on actions taken as the result of assessments. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
30. / CV&PGT personnel must demonstrate a familiarity level knowledge of problem analysis principles and the ability to apply the techniques necessary to identify problems, determine potential causes of problems, and identify corrective action(s). / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
31. / CV&PGT personnel must demonstrate a familiarity level knowledge of safety in design as described and required in DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
II. Master Level Engineering Qualification
32. / CV&PGT personnel must demonstrate a master level knowledge of the engineering principles and practices for radioactive contamination using the confinement ventilation system. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
33. / CV&PGT personnel must demonstrate a master level knowledge of HEPA filter and housings. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
34. / CV&PGT personnel must demonstrate a master level knowledge of HEPA filter qualification (Proof-of-Design) requirements and qualification process. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
35. / CV&PGT personnel must demonstrate a master level knowledge of HEPA filter in-place testing requirements and process including testing equipment theory and operation. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
36. / CV&PGT personnel must demonstrate a master level knowledge of HEPA filter independent quality assurance (Filter Test Facility) requirements and process. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
37. / CV&PGT personnel must demonstrate a working level knowledge of entrainment of aerosols in the airstream / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
38. / CV&PGT personnel must demonstrate a working level knowledge of Flammable Gas Generation and venting to prevent exceeding LFL concentration. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
39. / CV&PGT personnel must demonstrate a working level knowledge of Chemicals and Radiological Holdup and treatment. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
40. / CV&PGT personnel must demonstrate a working level knowledge of PGT. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
41. / CV&PGT personnel must demonstrate a working level knowledge of the DSA and Technical Safety Requirements (TSRs) of 10 CFR 830 Subpart B, “Safety Basis Requirements,” and the DOE Standards and Guides supporting implementation of 10 CFR 830 Subpart B. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
42. / CV&PGT personnel must demonstrate a working level knowledge of the requirements in DOE-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analyses. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
43. / CV&PGT personnel must demonstrate a working level knowledge of System Design Descriptions. / DAEFWNA / CBTCRDADJAOJTSASSWT / EQOEOPWE
Competency Levels: / DA = Demonstrate the Ability, E = Expert, F = Familiarity, W = Working, NA = Not Applicable
Learning Methods: / CBT = Computer-Based Training, CR = Classroom, DA = Detail Assignment, DJA = Developmental Job Assignment, OJT = On-the-Job Training, SA = Shadow Assignment,
SS = Self-Study, WT = Walk-Through
Evaluation Methods: / EQ = Evaluation of Equivalencies, OE = Oral Evaluation, OP = Observation of Performance, WE = Written Exam

2

U.S. DEPARTMENT OF ENERGY
Technical Qualification Program — Confinement Ventilation and Process Gas Treatment Qualification Card
U.S. Department of Energy
Technical Qualification Program “TQP”
Confinement Ventilation and Process Gas Treatment Qualification Card
Certification of Completion
The candidate has successfully completed the Confinement Ventilation and Process Gas Treatment TQP Qualification. The candidate has successfully completed a final qualification activity consisting of a comprehensive written examination, an oral board examination, or a walkthrough and is recommended for final qualification.
First-Level Supervisor / Date
U.S. Department of Energy
Technical Qualification Program “TQP”
Confinement Ventilation and Process Gas Treatment Final Qualification
The candidate has successfully completed the Confinement Ventilation and Process Gas Treatment TQP Qualification.
Second-Level Supervisor / Date
Competency Levels: / DA = Demonstrate the Ability, E = Expert, F = Familiarity, W = Working, NA = Not Applicable
Learning Methods: / CBT = Computer-Based Training, CR = Classroom, DA = Detail Assignment, DJA = Developmental Job Assignment, OJT = On-the-Job Training, SA = Shadow Assignment,
SS = Self-Study, WT = Walk-Through
Evaluation Methods: / EQ = Evaluation of Equivalencies, OE = Oral Evaluation, OP = Observation of Performance, WE = Written Exam

2

U.S. DEPARTMENT OF ENERGY
Technical Qualification Program — Confinement Ventilation and Process Gas Treatment Qualification Card

Technical Qualification Feedback Form

To be completed by Candidate

The items on this questionnaire ask general open-ended questions about the various aspects of your qualification process. Thank you for taking the time to fill out this form thoughtfully. Your answers and comments will help us develop a more effective qualification process. Please submit this completed form with your signed qualification card when you complete the qualification process.

Name: Date:

Functional Area Qualification Standard:

Organization:

1.  How did you use the following tools to help complete your qualification effort?

§  Competency to Course Matrix

§  Reference Guides

§  DOE O 426.1

§  Technical Qualification Program User’s Guide

2.  What problems did you encounter as you progressed through the qualification process?

3.  What programs or processes did you find useful in helping you complete your qualification requirements

4.  What programs or processes had a negative impact on your qualification experience?

Competency Levels: / DA = Demonstrate the Ability, E = Expert, F = Familiarity, W = Working, NA = Not Applicable
Learning Methods: / CBT = Computer-Based Training, CR = Classroom, DA = Detail Assignment, DJA = Developmental Job Assignment, OJT = On-the-Job Training, SA = Shadow Assignment,
SS = Self-Study, WT = Walk-Through
Evaluation Methods: / EQ = Evaluation of Equivalencies, OE = Oral Evaluation, OP = Observation of Performance, WE = Written Exam

2