EUROPEAN UNION AGENCY FOR RAILWAYS / National technical rules
ETCS/GSM-R

ETCS and GSM-R national technical rules

Document History

Version / Date / Comments
09 / 24.08.2016 / Modifying document template, adding open point clause, filling Bulgaria, modifying Switzerland
10 / 21.10.2016 / Modifying Germany, Denmark
11 / 12.01.2017 / Adding Croatia, rules for Austria, Spain; Norway, UK, updating Germany.
12 / 22.02.2017 / Updating Denmark, UK
13 / 30.03.2017 / Updating Czech Republic, Poland, Ireland, Latvia, Romania, Portugal, Slovenia, Croatia, Finland, closing Lithuania, Slovakia,

Contents

1. Abbreviations 3

2. Introduction 4

3. Austria (AT), national rules 5

4. Belgium (BE), national rules 6

5. Bulgaria (BG), national rules 7

6. Switzerland (CH), national rules 8

7. Czech Republic (CZ), national rules 9

8. Germany (DE), national rules 10

9. Denmark (DK), national rules 12

10. Estonia (EE), national rules 13

11. Greece (EL), national rules 14

12. Spain (ES), national rules 15

13. Finland (FI), national rules 16

14. France (FR), national rules 17

15. Hungary (HU), national rules 18

16. Croatia (HR), national rules 19

17. Ireland (IE), national rules 20

18. Italy (IT), national rules 21

19. Lithuania (LT), national rules 23

20. Luxemburg (LU), national rules 24

21. Latvia (LV), national rules 26

22. Netherlands (NL), national rules 27

23. Norway (NO), national rules 28

24. Poland (PL), national rules 29

25. Portugal (PT), national rules 30

26. Romania (RO), national rules 31

27. Sweden (SE), national rules 32

28. Slovenia (SI), national rules 34

29. Slovakia (SK), national rules 35

30. United Kingdom (UK), national rules 36

Annex A - Template for NTR 37

1.  Abbreviations

Table1: Table of abbreviations

Abbreviation / Definition
Agency / European Union Agency for Railways
CCS / Control Command and Signalling
B2 / ETCS Baseline 2
B3 / ETCS Baseline 3
ETCS / European Train Control System
L1 / ETCS Level 1
L2 / ETCS Level 2
MS / Member State
NTR / National technical rule
NNTR / Notified national technical rule
RDD / Reference Document Data base
RS / Rolling stock
SS / Subsystem

2.  Introduction

National technical rules are one of the obstacles when implementing ERTMS, the break through program from the ERTMS coordinator therefore aim to reduce the National technical CCS rules to the max; this was also stated as priority action from Commissioner Bulc. The task will be performed by the European Agency for Railways (Agency).

In order to discuss the NTR with the MSs concerned they have to be published/known to the Agency. In accordance with the Decision 2011/155/EU, MSs should publish the list of rules in the National Reference Document (NRD). The published NRDs are made available in the Reference Document Database (RDD) (link), the relevant control command part can be found there in chapter 12. The actual situation concerning NTRs published is the following:

›  NTRs are published in RDD

›  NTR are published in Notif-IT

›  NTRs are published on national websites (ministry, national safety authority, infrastructure manager, …..)

Moreover, several MS have not yet published their rules and/or are still in internal discussions.

Actually, the RDD cannot distinguish between the different ETCS baselines; this situation makes it extremely difficult for Applicants striving to get authorisation for their RS in order to provide railway operation in a MS.

The aim of this document (accessible via the Agency’s website) is to be (for the transitional/consolidation period) the central information point concerning ETCS and GSM-R NTR related too:

›  Applicable for ETCS baseline

›  RDD clause concerned

›  Content of the NTR

›  NTR description (or link to it)

›  Applicable to which ETCS baseline (if possible the template of Annex A should be used)

›  Status of the NTR

›  Published

›  Notified

›  Status of discussion with the Agency

›  Not yet discussed

›  Agency internal discussed

›  Under discussion

›  Under discussion, Agency (ERTMS) does not agree

›  Agency agreed

›  NTR to be deleted

›  Agency does not agree

›  MS and Agency contact (in case of questions)

›  Where the rule can be found

›  RDD (only when in, correct filled and at the right place)

›  Notif-IT

›  Website of NSA, IM,….

To describe the national rules, preferable the template listed in Annex A should be used.

Note: This document cope only with ETCS and GSM-R NTR

3.  Austria (AT), national rules

https://www.bmvit.gv.at/en/verkehr/railway/interop/notification.html

Rules are mentioned but no rule and no link found.

Some requirements could be found on the OEBB Website

Euroloop as well as some CR for B2 are required.

3.1.  Where the ETCS and GSM-R rule can be found

The test scenarios for L2 operation can be found under:

Anhang1-Leitfaden Betriebsführung ETCS_nachzuweisende Szenarien_ver01_APL FT.pdf

The other requirements in:

ERA_NATIONAL REFERENCE DOCUMENT_Austria_Version_1.2

3.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” ?

B2 “ETCS DMI” ?

B2 “braking aspects” ?

3.3.  Content of the NTR(s)

See Excel doc

Remark: Requirements are collected from different source documents, not confirmed if they are still valid.

3.4.  RDD chapter concerned

3.5.  Applicable for baseline

3.6.  Status of the NTRs

3.7.  Status of discussion with the Agency

Dialogue with AT established, Agency is still collecting the NTR. Waiting feedback from AT to start discussion.

3.8.  MS and Agency contact (in case of questions)

MS: Erich Binder

Agency: Hans Bierlein

+33 327096 772

4.  Belgium (BE), national rules

Belgium actually has published 2 rules:

›  B2 open point braking curves

›  Train – track compatibility testing

All the rules are based on L1 applications; rules for L2 are under elaboration.

4.1.  Where the ETCS and GSM-R rule can be found

4.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” No

B2 “ETCS DMI” No

B2 “braking aspects” Yes

4.3.  Content of the NTR(s)

4.4.  RDD chapter concerned

4.5.  Applicable for baseline

4.6.  Status of the NTRs

4.7.  Status of discussion with the Agency

Discussion started.

4.8.  MS and Agency contact (in case of questions)

MS: Myriam Juveyns

Agency: Hans Bierlein

+33 327096 772

5.  Bulgaria (BG), national rules

Actually there is no GSM-R network operational.

For ETCS a L1 pre B2 version is installed on one line, the update of the line/vehicles to 2.3.0d/Level 1 is foreseen by 2020.

5.1.  Where the ETCS and GSM-R rule can be found

No rules are actually published

5.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” No

B2 “ETCS DMI” No

B2 “braking aspects” No

5.3.  Content of the NTR(s)

None

5.4.  RDD chapter concerned

NA

5.5.  Applicable for baseline

NA

5.6.  Status of the NTRs

No NTR published

5.7.  Status of discussion with the Agency

General discussion held

5.8.  MS and Agency contact (in case of questions)

MS: Daniel Nedelkov

Agency: Hans Bierlein

+33 327096 772

6.  Switzerland (CH), national rules

6.1.  Where the ETCS and GSM-R rule can be found

Website BAV

https://www.bav.admin.ch

The Document "Voraussetzungen für den Einsatz von Fahrzeugen auf ETCS-Strecken" actually contains 7 general requirements, 16 requirements with Impact on ETCS on-board and 11 requirements related to Subsystem RS. For the 16 ETCS requirements only the title are given.

https://www.bav.admin.ch/bav/de/home/themen/alphabetische-themenliste/zugbeeinflussung/etcs/voraussetzungen.html

The details of the 16 ETCS NTR could be found under

https://www.bav.admin.ch/bav/de/home/rechtliches/rechtsgrundlagen-vorschriften/nntv.html

in the part “Fachinformation” at the bottom of the web-page.

6.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” Yes

B2 “ETCS DMI” Yes

B2 “braking aspects” Yes

6.3.  Content of the NTR(s)

See Excel document “ETCS and GSM-R National technical rules”.

6.4.  RDD chapter concerned

Several

6.5.  Applicable for baseline

Baseline 2 and baseline 3, details to be found in the Excel document “ETCS and GSM-R National technical rules”.

6.6.  Status of the NTRs

6.7.  Status of discussion with the Agency

Some are agreed, most of them still under discussion, see Excel document “ETCS and GSM-R National technical rules”.

6.8.  MS and Agency contact (in case of questions)

MS: Michael Riemenschnitter

+41 58 46 35524

Agency: Hans Bierlein

+33 327096 772

7.  Czech Republic (CZ), national rules

7.1.  Where the ETCS and GSM-R rule can be found

Rules are partly listed in the RDD

7.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” No

B2 “ETCS DMI” No

B2 “braking aspects” Yes

7.3.  Content of the NTR(s)

Diverse

7.4.  RDD chapter concerned

Several

7.5.  Applicable for baseline

B3 and B3

7.6.  Status of the NTRs

To be discussed

7.7.  Status of discussion with the Agency

Detailed discussion not yet started

7.8.  MS and Agency contact (in case of questions)

MS: Ondřej Fanta

Director of Operational and Technical Section

Deputy General Director

Drážní úřad/Rail Authority - NATIONAL SAFETY AUTHORITY

Wilsonova 300/8

121 06 Prague

Czech Republic

Mobile: +420602693 309

Agency: Hans Bierlein

+33 327096 772

8.  Germany (DE), national rules

8.1.  Where the ETCS and GSM-R rule can be found

Germany has published some requirements in the SNB (Schienennutzungsbedingungen), non of them are notified. Preliminary NTR blueprints are available.

NTR overview:
http://fahrweg.dbnetze.com/fahrweg-de/technik/strukturseite/0_fahrzeugbezogen/etcs_ntr.html

Correction factors for the braking curves and STM requirement specification:

http://fahrweg.dbnetze.com/fahrweg-de/technik/strukturseite/0_fahrzeugbezogen/fahrzeugausruestung.html

Requirements for ETCS from the SNB (track access requirements):

http://www1.deutschebahn.com/file/fahrweg-de/8905278/VQJMU4BPObJC1Z0PT9lIM-xWxyI/10326670/data/rw2016_810.0300A03_aktualisierung_02.pdf

Requirements for GSM-R from the SNB (track access requirements):

http://fahrweg.dbnetze.com/file/fahrweg-de/2397832/AYi_xdSZhUUjmH30Az3Pc8vMccs/7546354/data/rw2016_810.0300A06.pdf

Process for requesting track testing for vehicles not yet authorised from the SNB (track access requirements):

http://fahrweg.dbnetze.com/file/fahrweg-de/2397832/HyYcmhmOd3Znbz0dYHaAoerZ71Y/7705886/data/rw2016_810.0400.pdf

8.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” No

B2 “ETCS DMI” No

B2 “braking aspects” Yes

8.3.  Content of the NTR(s)

Actually there are 11 national rules available (11* are relevant for B2, 5* for 3.4.0 and 3 for 3.6.0); 6 of them are agreed by the Agency, for one the Agency does not agree and 4 are under discussion. None of the rules for B3 have impact on the ETCS B3 functionality:

·  DE01: Train – track compatibility testing

·  DE03: STM specification

·  DE04: ETCS onboard SS configuration

·  DE09: 2 communication sessions (3.4.0 only)

* one rule not relevant when applying TSI 2016-519 (GSM-R baseline 1)

Further details could be found in the document “NTR public list ….” published on the website of the Agency.

8.4.  RDD chapter concerned

To be filled

8.5.  Applicable for baseline

Baseline 2 and 3

8.6.  Status of the NTRs

Preliminary NTR are available and under discussion and most of the are already agreed with the Agency.

8.7.  Status of discussion with the Agency

Follow up discussions took place 3.6.2016, 18.10.2016, updated rules were received 12.12.2016.

8.8.  MS and Agency contact (in case of questions)

MS: Frank Leissner

+49 89 54856184

Agency: Hans Bierlein

+33 327096 772

9.  Denmark (DK), national rules

In Denmark only B3 vehicles will be authorised. Except the open point availability there is no additional requirement on B2 R2 vehicles, for B2 MR1 LX functionality is required.

9.1.  Where the ETCS and GSM-R rules can be found

Draft Law, RDD will be updated soon

9.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” Yes but only for first authorisation

B2 “ETCS DMI” No, B3 required

B2 “braking aspects” No, B3 required

9.3.  Content of the NTR(s)

Denmark has notified 4 rules

·  Class B system; STM

·  Availability (open point) but only for first authorisation

·  2 Communication sessions simultaneously, but only for border crossing trains

·  Level crossing functionality, only for B3 MR1

9.4.  RDD chapter concerned

12.2.2, 12.2.3, 12.2.4.5, 12.2.5.1

9.5.  Applicable for baseline

Baseline 3 only

9.6.  Status of the NTRs

Draft rules available.

9.7.  Status of discussion with the Agency

All rules are agreed.

9.8.  MS and Agency contact (in case of questions)

MS: Lars Mortensen

Agency: Hans Bierlein

+33 327096 772

10.  Estonia (EE), national rules

10.1.  Where the ETCS and GSM-R rule can be found

Actually, Estonia has no rule notified concerning ETCS and GSM-R. The rules notified in the RDD are related to the legacy systems, there is no requirement for a TSI CCS conform vehicle on top.

10.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” No

B2 “ETCS DMI” No

B2 “braking aspects” No

10.3.  Content of the NTR(s)

None

10.4.  RDD chapter concerned

None

10.5.  Applicable for baseline

None

10.6.  Status of the NTRs

None

10.7.  Status of discussion with the Agency

None

10.8.  MS and Agency contact (in case of questions)

MS: Kadi Zavadskis

Chief Specialist of Railway Infrastructure Department

Technical Regulatory Authority

Sõle 23A

10614 Tallinn, Estonia

e-mail:

Agency: Hans Bierlein

+33 327096 772

11.  Greece (EL), national rules

Actually, there is no ETCS train operation possible. The ETCS trackside equipment installed is B2.

Greece has notified two national rules concerning the SS RS related to the open points “Characteristics of sand applied to tracks” and “Use of magnetic / eddy current brakes”.

11.1.  Rules published for B2 and B3 open points

B2 and B3 “Availability” No

B2 “ETCS DMI” No

B2 “braking aspects” No

11.2.  Where the ETCS and GSM-R rule can be found

No specific NTRs are published/notified.

11.3.  Content of the NTR(s)

None

11.4.  RDD chapter concerned

None

11.5.  Applicable for baseline

None

11.6.  Status of the NTRs

None

11.7.  Status of discussion with the Agency

None

11.8.  MS and Agency contact (in case of questions)

MS: Catherine Fragoulopoulou

Agency: Hans Bierlein

+33 327096 772

12.  Spain (ES), national rules

12.1.  Where the ETCS and GSM-R rule can be found

12.2.  Rules published for B2 and B3 open points

B2 and B3 “Availability” Yes

B2 “ETCS DMI” No

B2 “braking aspects” Yes

B2 and B3 “Availability”. A national rule concerning the closing of this open point is on study.

B2 “ETCS DMI”. No national rule foreseen at the moment.