PROJECT DOCUMENT TEMPLATE
10TH TRANCHE OF THE DEVELOPMENT ACCOUNT
1EXECUTIVE SUMMARY
ProjectCodeandTitle:Startdate:
Enddate:
Budget:
Targetcountries:
ExecutingEntity:
Co-operating Entitieswithin the UNsystem
Other partners
Briefdescription:
2BACKGROUND
2.1Context
2.2Mandates, comparative advantage and link to the Programme Budget
2.3Country demand and targetcountries
2.4Link to the SDGs
3ANALYSIS
3.1Problem analysis
3.2Country level problemanalysis
Table 1 – Country analysis
Country / Status of affairs / Realistic outcomes... / ...
... / ...
... / ...
... / ...
... / ...
3.3Stakeholder analysis and capacityassessment
Table 2 – StakeholderAnalysis
Non UN Stakeholders / Type and levelof involvement inthe project / Capacityassets / CapacityGaps / Desiredfutureoutcomes / Incentives
4PROJECT STRATEGY: OBJECTIVE, EXPECTED ACCOMPLISHMENTS, INDICATORS, MAIN ACTIVITIES
4.1ProjectStrategy
4.2Logical Framework
Table 3 – Logical Framework
Interventionlogic / Indicators / MeansofverificationObjective
EA1 / IA 1.1
IA 1.2 … / ...
IA 1.3 … / ...
Main activity A1.1
A1.2…
EA2 / IA 2.1… / ...
IA 2.2… / ...
IA 2.3… / ...
A 2.1…
A 2.2…
4.3Risks and mitigationactions
Table 4 – Risks and mitigation actions
Risks / Mitigating Actions… / …
4.4Sustainability
5MONITORING AND EVALUATION
6MANAGEMENT AND COORDINATION AGREEMENTS
7ANNEXES
ANNEX 1: RESULT-BASED WORK PLAN AND BUDGET DETAILS
Table A1. – Results based work plan and budget
EA / Activity # / Timeframe by activity / Budget class / Amount(USD)Year
(Y1, Y2, Y3,Y4) / Quarter
(Q1, Q2, Q3, Q4)
EA1 / A1.1 / Travel ofStaff / $
Consultants / $
Workshops / $
Etc ... / $
A1.2 / … / … / Travel ofStaff / $
Consultants / $
EA 2 / A2.1 / … / … / … / $
External Evaluation / $
ANNEX 2: Detailed justification by code
- General TemporaryAssistance: $ ______(Total)
Temporary assistance to perform the tasks of______, in support of activities:
A#.#(no. of work months) x ($______per work month) =$______.
A#.#. (no. of work months) x ($______per work month) =$______.
A#.#. etc…
- Consultants: $ ______(Total)
(Provide separate breakdown by national/regional consultants andinternational consultants)
(a)Internationalconsultants
International consultants for the task(s) of ______, in support of activities: A#.#(no. of work-months), A#.#(no. of work-months) and A#.#. (no. of work months) x ($______per month) =$______.
Insupportoftheevaluationoftheproject:(no.ofworkmonths)x($______per work month) =$______.
(b)National / Regionalconsultants
National consultants for task(s) of______, in support of activities A#.# (no. ofwork-months), A#.# (no. of work-months) and A#.#. (no. of work months) x ($______permonth) =$______.
(c)Consultanttravel
(No. of missions) by consultants for the purpose of ______(if possibleindicate countries), in support of activities A#.# (no. of missions), A#.# (no. of missions), A#.# (no. of missions), and A#.# (no. of missions). ($______average mission cost) x (total no. of missions) =$______.
- Expertgroups: $ ______(Total)
A provision of$______is required for ______(no. of meetings) expert groupmeetings:
In support of activity A#.#: ______(title of meeting), ______(possible country of venue), ______(duration),______(number of participants-if applicable), ______number of experts= $______(EGM budget).
- Contractualservices: $ ______(Total)
A provision of $______is required for ______servicesin support of activities A#.# : description of services, duration and cost of eachcontractand if possible recipientcountry.
- Training: $ ______(Total)
(a)Workshops &seminars
Seminar/Workshopon(titleofseminar)incountry ______,insupportofA#.#.Duration of workshop: ______days; ($______per participant) x (no. of participants) x (no. of workshops) (ideally the numberofparticipants should be a multiple of the number of targetcountries)
Please include information regarding the length of each workshop in number of days.
(b)StudyTours
Study tours for the purpose of(______) in country ______, in support of A#.#.Study tour duration: ______days; ($______per study tour) x (no. of participants) x (no of study tours) = $______.(Ideallythe number of participants should be a multiple of the number of targetcountries)
- Travel ofStaff: $ ______(Total)
(a)UN Staff from the implementingentity
(No.ofmissions)byUNstaffforthepurposeof(______) (if possibleindicate countries), in support of activities A#.# (no. of missions), A#.# (no. of missions), A#.# (no. of missions), and A#.# (no. of missions).
($______average mission cost) x (total no. of missions) =$______.
(b)Staff from other UN entities collaborating inproject
(No. of missions) by other UN staff for the purpose of(______) (ifpossibleindicate countries), in support of activities A#.# (no. of missions),A#.# (no. of missions),A#.# (no. of missions)andA#.# (no. of missions).
($______average mission cost) x (total no. of missions) =$______.
- General operatingexpenses: $ ______(Total)
(a)Communications
In support of A#.#, A#.#, and A#.#. = $______.
(b)Other general operatingexpenses
In support of A#.#, A#.#, and A#.#. = $______.
- Equipment $ ______(Total)
A provision of $______is required forequipment
(Provide budget estimates, details on the type of equipment and possiblerecipientcountries).
1