2013-2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT

SOUTHWEST REGION

CONSULTANT PACKAGE SW 01

Project I.D. #11001-01-62

Highway/Street:IH39

Termini/Location:Janesville - Madison, Milwaukee St to Dane County Line

County:Rock

Length: 11 miles

Project Type:Resurfacing

Urban and/or Rural:Rural

Traffic Control:Night lane closures

Letting Date:April 8, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $7,500,000-$9,999,999

Project I.D. #21001-03-76

Highway/Street:IH39

Termini/Location:C Beloit, B-53-0048, -0051, -0216, -0217

County:Rock

Length: N/A - Bridges

Project Type:Bridge Rehabilitation

Urban and/or Rural:Rural

Traffic Control:Night lane closures

Letting Date:February 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $250,000-$499,999

Major Items of Work:HMA pavement, bridge overlays

Complexity Level:Medium

Restrictions:Night lane closures, holiday restrictions

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:2-3

Required Certification:Aggregates, concrete, HMA density

Duties:Contract administration, inspection, materials testing, finals documentation

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Deb Sunde, Contract Specialist

CONSULTANT PACKAGE SW 02

Project I.D. #11007-10-71

Highway/Street:USH39

Termini/Location:Illinois State Line - Madison, Siggelkow Rd Bridge

County:Dane

Length: 0.5 miles

Project Type:Reconstruction

Urban and/or Rural:Rural

Traffic Control:Staging

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $4,000,000-$4,999,999

Major Items of Work:Bridge replacement, grading, base aggregate, concrete pavement

Complexity Level:Medium-High

Restrictions:Holiday restrictions

Construction Leader Required:No

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1-2

Required Certification:Aggregates, concrete, HMA density

Duties:Contract administration, inspection, materials testing, finals documentation

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Deb Sunde, Contract Specialist

CONSULTANT PACKAGE SW 03

Project I.D. #11010-00-73

Highway/Street:IH39

Termini/Location:Madison-Lake Delton Road, (USH 51 - CTH V)

County:Dane

Length: 5.73 miles

Project Type:Resurfacing

Urban and/or Rural:Rural

Traffic Control:Staged under traffic

Letting Date:November 12, 2013

Field Rate Accounting Required:No

Anticipated Construction Cost: $7,500,000-$9,999,999

Project I.D. #21010-00-79

Highway/Street:IH39

Termini/Location:Madison - Portage, Portage Road to Hoepker Road

County:Dane

Length: 0.1 mile

Project Type:Miscellaneous, Pipe culvert rehabilitation

Urban and/or Rural:Rural

Traffic Control:Staged under traffic

Letting Date:November 12, 2013

Field Rate Accounting Required:No

Anticipated Construction Cost: $250,000-$499,999

Major Items of Work:HMA overlay, concrete pavement repairs, steel plate pipe arch lining, new culvert pipe boring under IH 39/90/94

Complexity Level:Medium

Restrictions:Night closures only, holidayrestrictions

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:3

Required Certification:Aggregate, concrete, materials sampling including nuclear density

Duties:Construction administration, inspection, staking (as needed), materials testing and finals, construction finals.

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 04

Project I.D. #11010-02-79

Highway/Street:IH39

Termini/Location:Madison - Portage, USH 151 Overpass Structures

County:Dane

Length: 0.21 miles

Project Type:Bridge rehabilitation

Urban and/or Rural:Rural

Traffic Control:Open to traffic, maintain 3 lanes on IH 39 with lane shifts, night time lane closures

Letting Date:December 10, 2013

Field Rate Accounting Required:No

Anticipated Construction Cost: $3,000,000-$4,999,999

Major Items of Work:Replacement of bridge decks for bridges B-13-0102 and B-13-0103, removing asphaltic surface milling, HMA pavement, concrete pavement, concrete barrier, pavement marking, and traffic control

Complexity Level:Medium

Restrictions:Night time closures, holiday and weekend restrictions

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1.5

Required Certification:Aggregate, concrete, asphaltic density, sampling

Duties:Project leader, inspection, materials testing, survey

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 05

Project I.D. #11161-00-65

Highway/Street:IH39

Termini/Location:Madison - Packwaukee, STH 78 to USH 51 (southbound only)

County:Columbia

Length: 7.92 miles

Project Type:Roadway Maintenance, Preservation

Urban and/or Rural:Rural

Traffic Control:Staged under traffic

Letting Date:February 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $750,000-$999,999

Major Items of Work:Concrete patching, minor sign bridge repairs

Complexity Level:Low

Restrictions:Holiday restrictions, night single lane closures, minimal daytime closures

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1

Required Certification:Aggregate, concrete, materials sampling

Duties:Construction administration, inspection, staking (as needed), materials testing and finals, construction finals.

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 06

Project I.D. #11206-04-62

Highway/Street:USH12

Termini/Location:C Madison, South Madison Beltline, Fish Hatchery Road to IH 90

County:Dane

Length: 7.1 miles

Project Type:Roadway maintenance

Urban and/or Rural:Both

Traffic Control:Staged night time construction

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $3,000,000-$3,999,999

Project I.D. #21206-04-64

Highway/Street:USH12

Termini/Location:C Madison, South Madison Beltline, Fish Hatchery Road to IH 90

County:Dane

Length: 7.1 miles

Project Type:Roadway maintenance, preservation

Urban and/or Rural:Both

Traffic Control:Staged night time construction

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $2,000,000-$2,999,999

Project I.D. #31206-04-75

Highway/Street:USH12

Termini/Location:C Madison, USH 18 to IH 39

County:Dane

Length: 7.1 miles

Project Type:Miscellaneous, concrete pavement repair

Urban and/or Rural:Both

Traffic Control:Staged night time construction

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $1,000,000-$1,999,999

Major Items of Work:Concrete pavement repair, HMA Pavement, pavement marking, beam guard upgrades, signing and traffic control

Complexity Level:Medium-High

Restrictions:Night time staged construction

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:2-4

Required Certification:HMA density testing, concrete testing, aggregate sampling

Duties:Full construction contract administration, inspection, complete construction material oversight

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 07

Project I.D. #11370-02-77

Highway/Street:STH16

Termini/Location:Watertown - Waukesha, CTH F Intersection

County:Jefferson

Length: 0.2 miles

Project Type:Reconstruction

Urban and/or Rural:Rural

Traffic Control:Staged construction

Letting Date:November 12, 2013

Field Rate Accounting Required:No

Anticipated Construction Cost: $1,000,000-$1,999,999

Major Items of Work:Common excavation, base aggregates, culvert pipe, concrete and asphalt pavement, pavement marking, signing

Complexity Level:Medium

Restrictions:Holiday restrictions, Completion date

Construction Leader Required:No

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1

Required Certification:Aggregate sampling, asphalt sampling, concrete testing, density testing

Duties:Project leader, grading inspection, culvert inspection, concrete inspection, asphalt paving inspection, traffic control, materials testing, materials finals and project finals

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 08

Project I.D. #11390-04-82

Highway/Street:STH26

Termini/Location:Watertown - STH 60 East Road, CTH J to STH 60 East

County:Dodge

Length: 4.2 miles

Project Type:Reconstruction

Urban and/or Rural:Rural

Traffic Control:Staged construction

Letting Date:November 12, 2013

Field Rate Accounting Required:No

Anticipated Construction Cost: $15,000,000 and more

Major Items of Work:Common and borrow excavation, structures, retaining wall

Complexity Level:High

Restrictions:Holiday restrictions, completion date

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:3

Required Certification:Aggregate sampling, concrete testing, asphalt sampling, density testing

Duties:Project leader, grading inspection, structure inspection, culvert inspection, concrete inspection, asphalt paving inspection, traffic control, materials testing, materials finals and project finals

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 09

Project I.D. #11390-04-94

Highway/Street:STH26

Termini/Location:Janesville - Fort Atkinson, Bowers Lake Road to CTH N

County:Rock

Length: 4 miles

Project Type:Resurfacing

Urban and/or Rural:Rural

Traffic Control:Under traffic, short term detour

Letting Date:July 8, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $1,000,000-$1,999,999

Project I.D. #21390-04-95

Highway/Street:STH59

Termini/Location:Janesville - Fort Atkinson, High Street to STH 59

County:Rock

Length: 1 mile

Project Type:Resurfacing

Urban and/or Rural:Rural

Traffic Control:Under traffic

Letting Date:July 8, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $250,000-$499,999

Major Items of Work:Concrete and asphalt pavement, base, marking, signing

Complexity Level:Low

Restrictions:Holiday restrictions, completion date

Construction Leader Required:No

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1

Required Certification:Concrete testing, asphalt sampling, density testing, aggregate sampling

Duties:Project leader, concrete inspection, asphalt paving inspection, traffic control, materials testing, materials finals and project finals

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 10

Project I.D. #13042-00-73

Highway/Street:STH60

Termini/Location:Lowell - Hartford, CTH P Intersection

County:Dodge

Length: 0.2 miles

Project Type:Reconstruction

Urban and/or Rural:Rural

Traffic Control:Staged Construction

Letting Date:December 10, 2013

Field Rate Accounting Required:No

Anticipated Construction Cost: $1,000,000-$1,999,999

Major Items of Work:Common excavation, base aggregates, concrete, asphalt, marking, signing

Complexity Level:Medium

Restrictions:Holiday restrictions, completion date

Construction Leader Required:No

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1

Required Certification:Aggregate sampling, concrete testing, asphalt sampling, density testing

Duties:Grading inspection, culvert inspection, concrete inspection, asphalt paving inspection, traffic control, materials testing, materials finals and project finals

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 11

Project I.D. #13070-00-72

Highway/Street:STH73

Termini/Location:IH 39 - Columbus, Pierce Road to Fadness Road

County:Dane

Length: 10 miles

Project Type:Reconstruction

Urban and/or Rural:Rural

Traffic Control:Detour

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $15,000,000 and more

Major Items of Work:Culverts, grading, base aggregate, HMA pavement

Complexity Level:Medium-High

Restrictions:N/A

Construction Leader Required:No

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:2-3

Required Certification:Aggregates, concrete, HMA density

Duties:Contract administration, inspection, materials testing, finals documentation

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Deb Sunde, Contract Specialist

CONSULTANT PACKAGE SW 12

Project I.D. #15271-01-71

Highway/Street:STH60

Termini/Location:Prairie Du Sac - Lodi, Wisconsin River Structure B-11-19

County:Sauk

Length: 0.15 miles

Project Type:Bridge Rehabilitation

Urban and/or Rural:Urban

Traffic Control:Road closed with detour on STH 188- USH 12- STH 78- STH 60

Letting Date:September 8, 2015 (advanceable)

Field Rate Accounting Required:No

Anticipated Construction Cost: $2,000,000-$2,999,999

Major Items of Work:Concrete bridge deck, railing and lighting, curb and gutter, grading, base course, asphaltic pavement

Complexity Level:Medium

Restrictions:Holiday restrictions

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:2-3

Required Certification:Aggregate, concrete, asphaltic density, sampling

Duties:Inspection, staking, material testing

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 13

Project I.D. #15290-01-72

Highway/Street:STH19

Termini/Location:Main Street, Village Of Waunakee, Holiday Drive to Division Street

County:Dane

Length: 0.97 miles

Project Type:Reconditioning

Urban and/or Rural:Urban

Traffic Control:Staged construction

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $3,000,000-$3,999,999

Major Items of Work:Grading, concrete base patching, base, HMA Pavement, concrete curb and gutter, street lighting, pavement marking, traffic control

Complexity Level:Medium

Restrictions:Holiday restrictions

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1-2

Required Certification:Concrete testing, HMA density testing, aggregate sampling

Duties:Full construction contract administration including construction materials

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 14

Project I.D. #15300-04-77

Highway/Street:USH12

Termini/Location:Sauk City - Madison, Old Sauk Road to Mineral Point Road

County:Dane

Length: 2.1 miles

Project Type:Reconditioning

Urban and/or Rural:Urban

Traffic Control:Staged construction with some night time work required

Letting Date:February 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $5,000,000-$7,499,999

Project I.D. #25300-04-79

Highway/Street:USH12

Termini/Location:Sauk City - Madison, Terrace Avenue to Old Sauk Road

County:Dane

Length: 2.1 miles

Project Type:Reconditioning

Urban and/or Rural:Urban

Traffic Control:Staged construction with some night time work required

Letting Date:February 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $5,000,000-$7,499,999

Major Items of Work:HMA pavement, grading, base, retaining walls, signing, pavement marking, and traffic control

Complexity Level:High

Restrictions:None

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:4-6

Required Certification: Aggregate sampling, concrete testing, asphaltic pavement density testing

Duties:Full construction contract including materials

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 15

Project I.D. #15410-02-71

Highway/Street:USH51

Termini/Location:Stoughton - DeForest, Pflaum Road Intersection

County:Dane

Length: 0.2 mile

Project Type:Roadway Maintenance

Urban and/or Rural:Urban

Traffic Control:Staged under traffic

Letting Date:May 13, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $250,000-$499,999

Project I.D. #25410-02-72

Highway/Street:USH51

Termini/Location:Stoughton - DeForest, Buckeye Road Intersection

County:Dane

Length: 0.20 mile

Project Type:Roadway Maintenance, Preservation

Urban and/or Rural:Urban

Traffic Control:Staged under traffic

Letting Date:May 13, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $100,000-$249,999

Major Items of Work:Concrete pavement patching, monotube signal supports, pedestrian timers

Complexity Level:Low

Restrictions:Holiday restrictions, likely no daytime closures during summer months due to blue route designation.

Construction Leader Required:Yes

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1

Required Certification:Aggregate, concrete, materials sampling

Duties:Construction administration, inspection, staking (as needed), materials testing and finals, construction finals.

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 16

Project I.D. #15657-00-70

Highway/Street:CTH P

Termini/Location:Pine Bluff - Cross Plains, Black Earth Cr Br B-13-0646

County:Dane

Length: 0.2 miles

Project Type:Bridge replacement

Urban and/or Rural:Rural

Traffic Control:Closed to traffic

Letting Date:March 11, 2014

Field Rate Accounting Required:No

Anticipated Construction Cost: $750,000-$999,999

Major Items of Work:Replace bridge and approaches, common excavation, base, asphaltic pavement

Complexity Level:Medium

Restrictions:Trout stream, holiday work restrictions

Construction Leader Required:No

Construction Support Staff Required:Yes

Anticipated Number of Support Staff:1

Required Certification:Aggregate, concrete, asphalt density

Duties:Inspection, staking, materials testing, project documentation and closeout

Check the ‘2013-14’ WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact:Sandy MacDonald, Contract Specialist

CONSULTANT PACKAGE SW 17

Project I.D. #15944-03-84

Highway/Street:STH81

Termini/Location:Darlington - Argyle, Wells Street to Clay Street

County:Lafayette

Length: 0.13 miles

Project Type:Miscellaneous, Retaining structure replacement

Urban and/or Rural:Urban

Traffic Control:Open to traffic, Single lane closure as needed

Letting Date:February 10, 2015 (advanceable)

Field Rate Accounting Required:No

Anticipated Construction Cost: $750,000-$999,999

Major Items of Work:Concrete retaining wall, concrete sidewalk, grading and earthwork, railings, base course, curb and gutter

Complexity Level:Medium

Restrictions:Holiday restrictions

Construction Leader Required:Yes

Construction Support Staff Required:Yes