MONTHLY REPORT
OF DMC, PILANI
for the month of
AUGUST, 2012 (Month & Year)
1. GENERAL
1.1 DETAILS OF IMPORTANT TECHNICAL WORK DONE AT LPTs / VLPTs DURING THE MONTH
Name of Station / Details of the important technical work done / REMARKSDMC, PILANI / 1. Audio Program Amplifier of LPTV Taranagar repaired by replacing its defective 10K Linear.
2. Tripping Device of LPTV Rajgarh repaired by replacing its defective Regulater 7812 IC.
3. Power Supply board of Exciter of LPTV Rajgarh repaired by replacing its defective Capacitor 2.2 Mfd, 35 V- 2 Nos., Capacitor. 2200 mfd 50v 1 No, Fuse base-4 No’s & Step Down transformer of Primery 230v-300 mA, Secondary 18V 1A, 16V 1A, 16V 700mA, 26V 150mA (Got reminded )
LPT, NAWAL GARH / 1. Preventing maintenance of DG set got done by replacing Mobile oil & filter Set.
LPT, KOTPUTLI / 1. Broken Rubber coupling & Pulley of DG Set got replaced by new one.
LPT, M/GARH / 1. DG set got repaired by replacing brunt coil, defective carbon bushes, bearing, cut out assembly & glow lamp.
1.2 DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT DURING THE MONTH
DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTHName / Designation / Emp. No./IRLA No. / Relieved from Station / Relieving Date / Joined at / Joining date / Transfer order No. and Date
DETAILS OF OFFICERS / STAFF RELIEVED DURING THE MONTH
Name / Designation / IRLA No./ Emp. No. / Relieved from Station / Relieving Date / To join at / Transfer order No. and Date
1.3 TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE / CONTROLLING OFFICERS DURING THE MONTH
NAME OF OFFICER / TOUR DETAILS / PERIOD OF E.L. / MEDICAL LEAVE ALONGWITH ITS NATUREPERIOD / PLACE
1.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF DURING THE MONTH
NAME OF OFFICER / STAFF / DESIGNATION / PERIOD / PLACE / NAME OF COURSEFrom / To
1.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / LPTs / VLPTs DURING LAST SIX MONTHS
Name of Station / Name of equipment / Date of receipt of equipment / Received from / Whether put in to circuit / Performance of equipment / RemarksD
M
C,
P
I
L
A
N
I / 32” LCD TV Set Model no. KLV 32-NX-500 Make – Sony – 3 nos. / 16-06-2011 / D-6 Godown, New Delhi / Yes / OK
8X2 Audio Video Switchers (Stereo Audio), Model :DBSA VS-82V,Make-Videotronix – 2 nos. / 16-06-2011 / D-6 Godown, New Delhi / Yes / OK
Professional IRD, Model : 2981/D, Make-Scopus – 2 nos. / 16-06-2011 / D-6 Godown, New Delhi / Yes / OK
Scroller Generator with 17” LCD monitor, keyboard, mouse,Model- Infotic Proticker, Make- Monarch – 8 nos. / 31-07-2011 / D-6 Godown, New Delhi / Installation by manufacturer awaited / N.A. / For LPT, Jhunjhunu, Nawalgarh, Churu, Khetri, Pilani, Kotputli, Narnaul & Mahendragarh – 01 no. each
1.6 DETAILS OF SCROLLER
Name of Station / Working Status of Scroller-1 / Working Status of Scroller-2 / Revenue generated in current month / Progressive revenue generated in current financial yearLPT, PILANI / OK / OK / 0 / 13528
LPT, CHIRAWA / N.A. / N.A. / N.A. / N.A.
LPT, KHETRI / OK / OK / 820 / 15614
LPT, JHUNJHUNU / OK / OK / 3645 / 42543
LPT, NAWALGARH / OK / OK / 0 / 0
LPT, CHURU / OK / OK / 6080 / 46012
LPT, RAJGARH / OK / OK / 0 / 13528
LPT, TARANAGAR / N.A. / N.A. / N.A. / N.A.
LPT, KOTPUTLI / OK / OK / 0 / 18240
LPT, NARNAUL / OK / OK / 0 / 6840
LPT, MAHENDRAGARH / OK / OK / 0 / 1976
VLPT, NEEM KA THANA / N.A. / N.A. / N.A. / N.A.
1.7 ELECTRIC CONNECTION DETAILS
Name of Station / Availability of Electricity / Whether Single Phase / Three Phase / Sanctioned Load / Power FactorLPT, PILANI / 22-23 Hrs / 3 Phase / 10 kw / 0.90
LPT, CHIRAWA / 20-22 Hrs / 3 Phase / 10 kw / 0.90
LPT, KHETRI / 22-23 Hrs / 3 Phase / 25 kw / 0.90
LPT, JHUNJHUNU / 20-22 Hrs / 3 Phase / 30 kw / 0.90
LPT, NAWALGARH / 20-22 Hrs / 3 Phase / 15 kw / 0.90
LPT, CHURU / 20-22 Hrs / 3 Phase / 25 kw / 0.90
LPT, RAJGARH / 18-22 Hrs / 3 Phase / 15 kw / 0.90
LPT, TARANAGAR / 18-22 Hrs / 3 Phase / 24 kw / 0.90
LPT, KOTPUTLI / 16-20 Hrs / 3 Phase / 10 kw / 0.90
LPT, NARNAUL / 16-20 Hrs / 3 Phase / 35 kw / 0.90
LPT, BHIWANI / 18-20 Hrs / 3 Phase / 25 kw / 0.90
LPT, MAHENDRAGARH / 18-22 Hrs / 3 Phase / 19.6 kw / 0.90
VLPT, NEEM KA THANA / 18-22 Hrs / 1 Phase / 2 kw / 0.90
1.8 LAND / BUILDING DETAILS
Station / Name of Owner of Land / Category of Owner(Deptt. / Govt. / Private) / Type of Building (Porta Cabin / Permanent) / Is Building / Porta Cabin constructed departmentally / Rent of Setup
(Rs. p.m.) / Availability of Lease Deed / Due Date of Renewal of Lease Deed / Due Date of Revision of Rent / Remarks
DMC, PILANI / Smt.Sumitra Devi / Private / Permanent / 4500 / Mar., 2011 / Apr., 2011 / Apr., 2011 / Renewal under process
LPT, PILANI / Director, CEERI / Govt. / Permanent / 1050 / 03-06-2002 / 02-06-2002 / 02-06-2002 / Letter has been given but no response from owner
LPT, CHIRAWA / Sh. Suraj Bhan / Private / Permanent / 5500 / 31-08-2008 / 01-09-2008 / 01-09-2008 / Under process at the end of CE(NZ),Delhi
LPT, KHETRI / HCL, KCC / Govt. / Permanent / 1241 / 16-07-2014 / 17-07-2014 / 17-07-2014
LPT, JHUNJHUNU / Zila Parishad / Govt. / Permanent / 17500 / 31-08-2013 / 01-09-2013 / 01-09-2013
LPT, NAWALGARH / Sh. R.L. Saini / Private / Permanent / 7741 / 31-03-2013 / 01-04-2013 / 01-04-2013
LPT, CHURU / AIR, Churu / Govt. / Permanent / NIL / N.A. / N.A. / N.A. / Co-sited with AIR, Churu
LPT, RAJGARH / Panchayat Samiti / Govt. / Permanent / 4275 / 31-07-2000 / 01-08-2000 / 01-08-2000 / Renewal under process at the end of CCW,Jaipur
LPT, TARANAGAR / Smt. Roshni / Private / Permanent / 3000 / 31-10-2008 / 01-11-2008 / 01-11-2008 / Under process at the end of CE(NZ),Delhi
LPT, KOTPUTLI / PWD / Govt. / Permanent / 2700 / 08-01-1997 / 09-01-1997 / 09-01-1997 / Ownership disputed. Property declared as ‘NAZRUL SAMPATTI’ of State Govt.
LPT, NARNAUL / State Govt. / Govt. / Permanent / NIL / N.A. / N.A. / N.A. / On 99 years’ lease
LPT, BHIWANI / State Govt. / Govt. / Permanent / NIL / N.A. / N.A. / N.A. / On 99 years’ lease
LPT, MAHENDRAGARH / PWD / Govt. / Permanent / 4550 / 28-10-2003 / 29-10-2003 / 29-10-2003 / Letter has been given but no response from owner
VLPT, NEEM KA THANA / Municipal Committee / Govt. / Permanent / NIL / N.A. / N.A. / N.A. / Rent free
1
2. TECHNICAL
2.1 DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH OF AUGUST, 2012
LPT, PILANI / LPT, CHIRAWA / LPT, KHETRI / LPT, JHUNJHUNU / LPT, NAWALGARH / LPT, CHURU / LPT, RAJGARH / LPT, TARANAGAR / LPT, KOTPUTLI / LPT, NARNAUL / LPT, MAHENDRAGARHDD-1 / DD News
1 / Test Hours / 7.75 / 7.23 / 9.82 / 7.18 / 7.75 / 5.16 / 10.33 / 10.33 / 7.75 / 6.71 / 6.71 / 9.30
2 / Scheduled Prog. Hours / 609.42 / 609.06 / 909.60 / 608.86 / 608.95 / 608.18 / 608.46 / 599 / 611.03 / 609.50 / 559.03 / 609.37
3 / Gear Breakdown Hrs. / 0 / 0 / 0 / 0 / 0 / 0 / 0.21 / 0 / 0 / 0 / 0 / 0
4 / Power Supply Breakdown Hrs. / 0.02 / 0.88 / 0 / 0 / 1.53 / 0.38 / 0.25 / 0.80 / 2.08 / 1.85 / 1.76 / 3.20
5 / Other Causes Breakdown Hrs. / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
6 / Total Breakdown Hrs. (3+4+5) / 0.02 / 0.88 / 0 / 0 / 1.53 / 0.38 / 0.46 / 0.80 / 2.08 / 1.85 / 1.76 / 3.20
7 / Prog. Hours Radiated (2-6) / 609.40 / 608.18 / 609.60 / 608.86 / 607.42 / 607.80 / 608.00 / 598.20 / 608.95 / 607.65 / 557.98 / 606.17
8 / Total Hours of Working (1+7) / 617.15 / 615.41 / 619.42 / 616.04 / 615.17 / 612.96 / 618.33 / 608.53 / 616.70 / 614.36 / 563.98 / 615.47
9 / % B/D ={(Total B/D x 100)/
Scheduled Prog. Hrs.)} / 0.001 / 0.14 / 0 / 0 / 0.25 / 0.50 / 0.75 / 0.13 / 0.34 / 0.30 / 0.31 / 0.52
2.2 PROGRESSIVE TOTAL FROM APRIL OF CURRENT FINANCIAL YEAR
LPT, PILANI / LPT, CHIRAWA / LPT, KHETRI / LPT, JHUNJHUNU / LPT, NAWALGARH / LPT, CHURU / LPT, RAJGARH / LPT, TARANAGAR / LPT, KOTPUTLI / LPT, NARNAUL / LPT, MAHENDRAGARHDD-1 / DD News
1 / Test Hours / 38.25 / 35.55 / 48.02 / 35.59 / 38.25 / 34.25 / 50.99 / 50.99 / 38.00 / 32.92 / 32.92 / 46.30
2 / Scheduled Prog. Hours / 2909.06 / 2906.28 / 2907.20 / 2905.74 / 2906.45 / 2902.49 / 2904.37 / 2894.81 / 2910.53 / 2907.21 / 2765.06 / 2906.96
3 / Gear Breakdown Hrs. / 0 / 0 / 0 / 0 / 0 / 0 / 0.21 / 0 / 0 / 0 / 0 / 0
4 / Power Supply Breakdown Hrs. / 0.14 / 6.30 / 0 / 0 / 8.23 / 1.23 / 1.33 / 5.05 / 12.74 / 10.72 / 10.53 / 14.77
5 / Other Causes Breakdown Hrs. / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
6 / Total Breakdown Hrs. (3+4+5) / 0.14 / 6.30 / 0 / 0 / 8.23 / 1.23 / 1.54 / 5.05 / 12.74 / 10.72 / 10.53 / 14.77
7 / Prog. Hours Radiated (2-6) / 2908.82 / 2899.98 / 2907.20 / 2905.74 / 2898.22 / 2901.26 / 2902.83 / 2889.76 / 2897.99 / 2896.49 / 2754.53 / 2892.19
8 / Total Hours of Working (1+7) / 2947.07 / 2935.53 / 2955.22 / 2941.33 / 2936.47 / 2935.51 / 2953.82 / 2945.80 / 2953.29 / 2987.45 / 2787.45 / 2938.49
9 / % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)} / 0.006 / 0.21 / 0 / 0 / 0.28 / 0.01 / 0.05 / 0.17 / 0.43 / 0.36 / 0.38 / 0.50
2.3 DETAILS OF POWER OF TRANSMITTER FOR THE MONTH … AUGUST, 2012
LPT, PILANI / LPT, CHIRAWA / LPT, KHETRI / LPT, JHUNJHUNU / LPT, NAWALGARH / LPT, CHURU / LPT, RAJGARH / LPT, TARANAGAR / LPT, KOTPUTLI / LPT, NARNAUL / LPT, MAHENDRAGARH / VLPT, NEEM KA THANADD-1 / DD News
1 / Rated Power of Transmitter (in KW / Watts) / 100W / 100W / 350W / 495W / 100W / 500W / 100W / 100W / 100W / 500W / 500W / 100W / 10W
2 / Forward Peak Power of Transmitter
Video / 100W / 100W / 500W / 495W / 100W / 350W / 95W / 100W / 100W / 500W / 495W / 100W / 10W
Audio / 10W / 15W / 30W / 40W / 15W / 35W / 9W / 10W / 15W / 35W / 25W / 15W / 1.0W
3 / Reflected Power
Video / 1.0W / 2W / 4W / 2W / 2W / 3W / 3W / 2W / 1.5W / 1W / 3W / 2W / 0.1W
Audio / 0.1W / 0.3W / 0.5W / 0.5W / 0.3W / 0.3W / 0.5W / 0.3W / 0.2W / 0.1W / 0.3W / 0.3W / 0.05W
4 / Since when Transmitter is on less than rated power (if applicable) / - / - / - / - / - / - / - / - / - / - / - / -
5 / Reasons for less than rated power / - / - / - / - / - / - / - / - / - / - / - / -
6 / Reasons for high reflection, if any / - / - / - / - / - / - / - / - / - / - / - / -
2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER
(Sync Peak Video Power less than rated power)
LPT, PILANI / LPT, CHIRAWA / LPT, KHETRI / LPT, JHUNJHUNU / LPT, NAWALGARH / LPT, CHURU / LPT, RAJGARH / LPT, TARANAGAR / LPT, KOTPUTLI / LPT, NARNAUL / LPT, MAHENDRAGARH1 / Dates
2 / Duration / NIL / NIL / NIL / NIL / NIL / NIL / NIL / NIL / NIL / NIL / NIL
3 / Power (Radiation)
4 / Reasons
5 / Total duration of Low Power in hours during the month
6 / No. of occurrences
7 / Progressive total of occurrences of Low Power Radiation
8 / Progressive total of duration of Low Power Radiation
9 / Complaints of reception, if any & Reason of complaints
1
2.5 DETAILS OF MAJOR BREAKDOWN DURING THE MONTH
(More than 15 minutes)
LPTs UNDER DMC, PILANI
Date / Duration / Period / Reasons for B/D / Action taken to solve the B/D / Preventive action taken to avoid such breakdown in futureFrom / To
VLPT, NEEM KA THANA
Date / Duration / Period / Reasons for B/D / Action taken to solve the B/D / Preventive action taken to avoid such breakdown in futureFrom / To
NIL / NIL
2.6 CATEGORY-WISE BREAKDOWN DURING THE MONTH
LPT, PILANI
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 1 / 0.02 / 0 / 0 / 0 / 0
LPT, CHIRAWA
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 53 / 0.88 / 0 / 0 / 0 / 0
LPT, KHETRI
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
LPT, JHUNJHUNU
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
LPT, NAWALGARH
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 92 / 1.53 / 0 / 0 / 0 / 0
LPT, CHURU
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 23 / 0.38 / 0 / 0 / 0 / 0
LPT, RAJGARH
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 1 / 0.21 / 0 / 0 / 15 / 0.25 / 0 / 0 / 0 / 0
LPT, TARANAGAR
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 48 / 1.80 / 0 / 0 / 0 / 0
LPT, KOTPUTLI
GEAR / POWER SUPPLY / OTHER CAUSESMajor / Minor / Major / Minor / Major / Minor
No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur. / No. / Dur.
0 / 0 / 0 / 0 / 0 / 0 / 125 / 2.08 / 0 / 0 / 0 / 0
LPT, NARNAUL