USF Campus Edge Enhancement Phase IIUSF Project 370

PROPOSAL COST FORM

The following Vendor, ______, submits a Proposal for the USF Campus Edge Enhancement Phase II Project and acknowledges and affirms this quote complies with the informationoutlined in ITN-MH-17-01.

The following forms are attached to this Proposal Cost Form:

Invitation to Negotiate cover Page (Signed)

Submittal Requirements Documentation

  • Qualifications – Experience
  • Qualifications – Similar Projects
  • Qualifications – Resumes
  • Ability – Plan to meet Project Requirements
  • Ability – Plan to implement Project
  • Proposal – Executive Summary
  • Proposal – Description of Services
  • Proposal Cost Form (this form)
  • Proposed Schedule

Minority Vendor and P-Card Certification

Certificate of non-Segregated Facilities

Bidder’s Affirmation

Small, minority or Woman Owned Business Form

Purchase Order Payment Preference

All issued Addendums to this ITN (Signed)

We hereby propose to provide the services required to provide a full and complete Project, including but not limited to all necessary site investigation, surveying, design and engineering, permitting, construction and project close-out.

$______= Total Base Bid

Breakdown of Bid:

$______= Surveying.

$______= Professional Design & Engineering.

$______= Permitting.

$______= Construction – Section C1 (Bruce B. Downs).

$______= Construction – Sections C2-6 (stopping at Leroy Collins Blvd = Fowler Ave – west).

$______= Construction – Sections C6-10 (starting at Leroy Collins Blvd = Fowler Ave - East).

$______= Construction – Sections C11-16 (50th Street).

$______= Construction – Sections C17-19 (Fletcher – west of Palm Dr.).

$______= Construction – Sections C19-22. (Fletcher – east of Palm Dr.).

$______= Project Close-out.

$______= General Conditions.

$______= Overhead & Profit.

$_____125,000.00______= Contingency.

$______10,000.00______= Testing Allowance.

$______= Other Costs (______).

Unit Prices:

$______= Cost to ADD one Brick Pier (Site Prep, Testing, Foundation, CMU, Brick, Cap, etc.).

$______= Cost to DELETE one Brick Pier (Site Prep, Testing, Foundation, CMU, Brick, Cap, etc.).

$______= Cost to ADD one panel of typical fencing panel and (1) additional post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).

$______= Cost to DELETE one panel of typical fencing panel and (1) post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).

$______= Cost to ADD one panel of “Bull U” fencing panel and (1) additional post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).

$______= Cost to DELETE one panel of “Bull U” fencing panel and (1) post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).

$______= Cost to ADD one man-gate and a 10’ long section of sidewalk (6” thick x 6’ wide). Man gate shall match the gate installed during Phase I at Fletcher near Bruce B. Downs. Include additional post(s) and foundations required and delete portion of typical fence section.

Clarifications or Qualifications:

Submitted by: ______Company Name:______

Title:______Company Address:______

Date:______

Phone No:______Email:______

Page 1 of 3