University of Edinburgh
______
Stage: Acceptance
User Acceptance Test (UAT) Plan
[PROJECT NAME]
[PROGRAMME NAME]
[PROJECT CODE]
[ANNUAL PLAN NUMBER]
Document Version: [x.x]
Date: [dd/mm/yy]
______
Information Services - Template Revised August 2007
Acceptance: User Acceptance Test Plan [Project Name]
[Version: x.x]
______
Contents
1 Document Management 3
1.1 Contributors 3
1.2 Version Control 3
2 USER ACCEPTANCE TESTING 4
2.1 User Acceptance Definition 4
2.2 UAT Responsibilities 4
2.3 UAT STRATEGY 5
3 USER TESTING 6
4 UAT RESULTS 7
4.1 Open Issues 7
4.2 Document Sign Off 7
1 Document Management
When completing this document, please mark any section that is not required as ‘N/A’. A brief description of why the section is not required should also be included.
1.1 Contributors
Please provide details of all contributors to this document.
Role / Department / NameOwner / MIS
Contributor / <Business Partner>
Contributor / <Business Partner>
Contributor / <Business Partner>
1.2 Version Control
Please document all changes made to this document since initial distribution.
Date / Version / Author / Section / Amendment2 USER ACCEPTANCE TESTING
2.1 User Acceptance Definition
User Acceptance Testing should ensure that the application performs at an acceptable level for the Customer.
2.2 UAT Responsibilities
Role / Name / ResponsibilitiesProject Manager / Communication with Customer to agree format and scope of UAT
Agree acceptance criteria with the Customer prior to commencing UAT
Business Analyst / Assist Customer with the creation of a detailed test plan
Test Co-ordinator (Business) / Ensure that a detailed test plan is available for test users
Ensure that bugs identified during UAT are logged in the MIS Test Log
Ensure testing takes place within agreed timeframes
3 UAT STRATEGY
The User Acceptance Test Plan should be used to record the Customer’s sign off of the documented scenarios. It is recommended that detailed test plans be used to record the results of user testing.
The document is a high level guide, and is not intended as a replacement for any specific user acceptance testing procedures that individual areas might have.
Consideration / Date Agreed / DetailsTest Approach
Assumptions & Constraints
Setup of Test Environment
Test Scenarios
Test Period
4 USER TESTING
User testing should be based on the pre agreed test scenarios or acceptance criteria. It should be noted if the scenarios have been sourced from the BRD, or if they have been identified subsequently.
Identified in BRDScenario / Date Tested / Notes
Identified Post BRD
Scenario / Date Tested / Notes
Any issues identified during UAT should be added to the MIS Test Log. It may be agreed that UAT can be signed off while some issues remain – please add the test log reference to the appropriate section above if this is the case.
5 UAT RESULTS
5.1 Open Issues
Please insert a copy of any open issues from the Test Log, together with details of why these issues remain open at the sign off of the Acceptance Stage.
5.2 Document Sign Off
Business Project Manager / NameProject Manager / Name
______
Page 7 of 7