Z-015 Temporary equipment – check list

U04 – High pressure cleaning equipment

Rev. 3, june 2004

Contractor: / Contact person contractor/telephone:
Container/equipment ID number: / Approve for location in zone:
(Zone 1, Zone 2 or non-hazardous area)
Company/installation container intended for: / Contact person/requisitioner in the company:
Person in the company responsible for prior approval, see 4.8.3:
Name: / Telephone: / Date approval received:

Status: OK=Approved, NA=Not Applicable, NC=Not Checked, D=Defective or missing

Ref.
Z-015 / Status
supplier / Receiving
control
(company) / Remarks
1-MECHANICAL
1.1 / Signs tagging/labelling / 4.6
1.2 / Annual control (lifting equipment, cert.) / 4.4.1
1.3 / Mech. cond. (lifting eyes/points, structure) / 4.4.1
1.9 / Noise / 4.4.8
2-FIRE, GAS AND SAFETY
2.1 / Gas detector in air inlet / 4.4.3
2.2 / Fire/smoke detector / 4.4.2
2.4 / Portable fire extinguisher / 4.4.2
3-ELECTRICAL
3.1 / Cables, nipples, equipment etc. / 4.4.6.1
3.2 / Insulation resistance - megging / 4.8.1
3.3 / Earthing (NB bonding of structure) / 4.4.6.3
3.4 / All external installation Ex-proof / 4.4.6.2
4-HOOK-UP TO INSTALLATION
4.1 / Power suply (voltage, freq., plugs) / 4.7
4.4 / Alarm signal to control room with plug / 4.7
5-EQUIPMENT
5.1 / Manual emergency stop / 4.4.8
5.2 / Manual shutdown of diesel supply / 4.3.1
5.3 / Drip trays / 4.3.1
5.4 / 'Rig saver' in combustion air inlet / 4.3.1
5.5 / Shutdown if loss o foil pressure / 4.3.1
5.6 / Shutdown if high cooling water temperature / 4.3.1
5.7 / Shutdown if overspeed / 4.3.1
5.8 / Diesel engine approved for zone 2 / 4.3.1
5.9 / Gas detector in combustion air inlet / 4.3.1
5.10 / Flame arrester in exhaust pipe / 4.3.1
5.11 / Spark arrester in exhaust pipe / 4.3.1
5.12 / Safety valve / 4.3.5
6-DOCUMENTATION
6.1 / Lifting certificate / 4.8
6.2 / Other technical doc. (drawings, data.) / 4.8
6.3 / Certificate for equip. with special requ. / 4.8
6.4 / Maintenance programme / 4.8
6.5 / Maintenance journal / 4.8
6.6 / User manual / 4.8
Competent
person for lifting gear/mechanical devices / Supplier
electrician / Company
receiving control
Date: /
Signature / Date: /
Signature / Date: /
Signature
Name in capitals /
Name in capitals /
Name in capitals

General commentary:

Side 1 of 2