Trans-Canada Highway (PTH 1)

Trans-Canada Highway (PTH 1)

2013-14 HIGHWAY INFRASTRUCTURE CAPITAL PROJECT LIST

Trans-Canada Highway (PTH 1)

  • Micro-surface seven kilometres in Headingley from Goal Road to the CPR Crossing
  • Structure rehabilitation at Birch River located 4.8 km east of PR 506, east of Prawda
  • Commence grade widening of 32 km from Brokenhead River to Greater Winnipeg Water District Railway crossing
  • Commence intersection improvements in Headingley
  • Micro-surface 0.9 km from four km east of PTH 26 to 4.9 km, east of PTH 26
  • Micro-surface 8.5 km from Portage la Prairie to west junction of PTH 1A
  • Micro-surface eight km from PR 248 from 0.5 km, west of PR 332
  • Continue the culvert replacements from PTH 16 to the Portage Diversion
  • Structure rehabilitation at Assiniboine River located 6.6 km west of PR 430, east of Portage la Prairie
  • Pave 10 km of westbound lanes and shoulders from west of Portage la Prairie to PTH 16
  • Micro-surface 13.3 km from PTH 21 to west junction of PR 250
  • Continue paving the new service road in Brandon from Deer Ridge to one km east of east junction PTH 10
  • Minor structure rehabilitation at Assiniboine River located 0.7 km south of PR 459, west of Brandon
  • Pave 13.1 km on the westbound lanes from PTH 5 to 13.1 km east of PTH 5 including the shoulders.

PTH 1A

  • Pave 0.9 km in Portage la Prairie from Eighth Street to 18th Street on Saskatchewan Avenue
  • Pave 1.6 km in Brandon from 34th Street to 18th Street on Victoria Avenue

PTH 2

  • Complete structure replacement at Codner Drain in the vicinity of Starbuck
  • Micro-surface 15.3 km from PR 244 to PR 240
  • Commence structure rehabilitation at Souris River in the vicinity of Wawanesa as part of flood restoration

...2

- 2 -

  • Micro-surface 11.9 km from east junction of PR 256 to 11.9 km east, near the Reston access
  • Micro-surface 21.5 km from PTH 22 to PTH 10

PTH 3

  • Intersection improvements at PTH 23
  • Continue grade widening, base and paving of 21.4 km from east junction PR 254 to south junction of PTH 21, west of Deloraine

PTH 5

  • Pave 21.6 km from south junction PR 265 to PR 261
  • Structure rehabilitation at Shell River located 0.4 km east of PR 583, east of Roblin
  • Micro-surface 10.2 km from PTH 19 to PTH 50
  • Grade west of PTH 10, southwest of Ashville
  • Replace structure at drain located in the vicinity of Kelwood
  • Replace structure at Turtle River located in the vicinity of Laurier

PTH 6

  • Grade including base a 1.5 km new location in the vicinity of Woodlands
  • Micro-surface 24.7 km from 42.3 km north of PR 513 to 67 km north of PR 513
  • Micro-surface 25.6 km from Grand Rapids Drive to 25.6 km north of Grand Rapids
  • Micro-surface 29.8 km from PTH 39 to PR 373
  • Commence grading and culvert replacements of 25 km from Sasagiu Rapids to 25 km north

PTH 7

  • Pavement rehabilitation of 20.6 km from 1.6 km south of PTH 101 to 2.3 km north of
    PTH 67

PTH 9

  • Commence paving of 13 km from PTH 4 to three km north of Clandeboye

PTH 10

  • Micro-surface 22.2 km from south junction PTH 23 to south junction of PTH 2

...3

- 3 -

  • Culvert jacking from 6.7 km north of PTH 3 to 0.8 km north of south junction PTH 23
  • Minor structure rehabilitation at Souris River located south of south junction of PTH 2 as part of flood restoration
  • Commence grade widening, base and paving including the passing lanes of 15.6 km from 0.4 km north of PTH 25 to 4.5 km north of PTH 24
  • Structure rehabilitation at Bowsman River located 0.9 km north of PR 266, north of Bowsman
  • Grade north of Ashville
  • Pave 15 km from Overflowing River to 10 km south of PTH 60
  • Pave 19.8 km from 19.8 km south to Overflowing River
  • Various culvert replacements located south of The Pas from PTH 60 to PR 289

PTH 11

  • Commence structure rehabilitation at Powerview Creek, near Pine Falls
  • Micro-surface 14.2 km from 5.8 km west of the south junction of PTH 44 to the north junction of PTH 44

PTH 12

  • Commence structure replacement at West Pine Creek located 2.7k m east PTH 89, east of Piney
  • Commence structure replacement at East Pine Creek located 3.5 km east PTH 89, east of Piney
  • Commence structure replacement at Sprague Creek located 0.5 km west of PR 308, south of Sprague
  • Commence structure replacement at Mud Creek located 1.1 km west of PR 308, south of Sprague
  • Commence structure replacement at Seine River Diversion located 1.5 km south of
    PR 210, south of Ste. Anne
  • Micro-surface 40.2 km from PR 308 to PR 210
  • Replace structure at Rat River Diversion, southwest of Zhoda

PTH 13

  • Continue culvert jacking from Carman to Elm Creek

...4

- 4 -

PTH 16

  • Complete grade widening, base and paving of 18.2 km Binscarth to east of Foxwarren

PTH 20A

  • Intersection improvements in Dauphin at Mountain Road

PTH 21

  • Replace structure at Souris River located in the vicinity of Hartney as part of flood restoration

PTH 23

  • Continue the structure rehabilitation at Red River location 1.2 km east of PTH 75, east of Morris

PTH 34

  • Complete structure replacement at Gillespie Drain, south of Gladstone

PTH 44

  • Micro-surface four km from PTH 9 to PTH 59

PTH 59

  • Micro-surface eight km from two km north of PTH 101 to PR 213
  • Commence paving 28 km from north of the Brokenhead Ojibway First Nation to PTH 11

PTH 75

  • Commence intersection improvements at U.S. border

PTH 83

  • Grade reconstruction from 1.1 km north of PR 366 in the vicinity of Inglis
  • Commence grading, base and paving of 1.8 km from PR 366 to 1.8 km north PR 366 in the vicinity of Inglis
  • Complete grading, base and paving of 20.4 km from north of PR 367 to south of PTH 57, north of San Clara
  • Commence grading, base and paving of 8.5 km from PR 264 to north of PR 482

...5

- 5 -

PTH 100 (South Perimeter Highway)

  • Pavement rehabilitation at PTH 1 west junction, south Perimeter
  • Structure rehabilitation at east interchange of PTH 1, south Perimeter
  • Commence intersection improvements from Brady Road to PR 330, south Perimeter
  • Structure rehabilitation at PTH 75, south Perimeter
  • Continue intersection improvements at various median openings on the south Perimeter

PTH 101

  • Pavement rehabilitation of eight km from 0.9 km south of PTH 59 to 0.7 km north of PTH 15

PTH 110

  • Complete grading, base and paving of 4.1 km from Assiniboine River to PTH 1

PR 204

  • Minor structure rehabilitation at the Red River in Selkirk

PR 205

  • Micro-surface 13.1 km from 22 km east of PTH 3 to PTH 75

PR 207

  • Structure rehabilitation at Cordite Drain located north of PTH 15

PR 211

  • Structure rehabilitation at Winnipeg River, east of Pinawa

PR 213

  • Micro-surface 8.8 km from PTH 59 to PR 206

PR 221

  • Continue with the structures at CentrePort Canada Way
  • Continue paving at CentrePort Canada Way

PR 222

  • Replace structure at the Fish Creek drain located 1.7 km south of PR 324, south of Camp Morton

...6

- 6 -

PR 227

  • Continue replacing the structure at the Assiniboine River Diversion, north of Portage la Prairie as part of flood restoration

PR 243

  • Grade, base and pave one km in Reinland

PR 245

  • Grade 2.8 km from east junction of PR 242 to 2.8 km east

PR 246

  • Structure rehabilitation at St. Jean Baptiste as part of flood restoration

PR 251

  • Replace structure at Souris River located in the vicinity of Coulter as part of flood restoration

PR 253

  • Commence structure replacement at Pembina River located west of Pilot Mound

PR 255

  • Commence road improvements of various locations between PR 256 to PTH 83

PR 269

  • Micro-surface 14.6 km from south junction PTH 20 to north junction PR 364

PR 280

  • Continue grading from PR 391 to 174 km east of PR 391, cost-shared with Manitoba Hydro

PR 287

  • Replace structure at Cormorant Lake Narrows located 38.7 km north of PR 384, at Cormorant

PR 304

  • Continue grading improvements from Manigotagan to east of Wallace Lake

...7

- 7 -

PR 315

  • Continue grading improvements from PR 313 to Ontario boundary

PR 325

  • Road improvements of 10 km between 12.9 km east of PTH 6 to 38.7 km east of PTH 6

PR 334

  • Micro-surface 0.8 km from PTH 3 to PR 247

PR 340

  • Surface 10.4 km from PR 453 to 10.4 km north of PR 453

PR 348

  • Minor structure rehabilitation at Little Souris River located southwest of Brandon as part of flood restoration

PR 373

  • Continue surfacing 28.8 km from six km north of Rossville junction to Sea Falls, north of Norway House
  • Continue grading 21.8 km from Minago River to 21.8 km north of Minago River, north of Jenpeg

PR 384

  • Continue grading of the new location in the vicinity of Lobstick Creek

PR 391

  • Grade improvements of various locations from Thompson to Suwannee River

PR 392

  • Continue grading, base and paving of Hudson Bay

PR 481

  • Road improvement from Cayer to Crane River as part of flood restoration

PR 483

  • Surface various locations from PTH 10 to Sapotaweyak Cree Nation

...8

- 8 -

PR 513

  • Micro-surface from PTH 6 to 10.1 km east of PTH 6
  • Road improvements from east of PTH 6 to Dauphin River First Nation

PR 610

  • Intersection improvements in Brandon at 17th Street East (Richmond Avenue)

Winter Roads

  • Continue installing the structure at Panko Narrows