The proposals are listed in the order they appear on the hearing agendas.

Pool (TRACK 1)
Subject / Submitted by / Testimony / Probable date / CAH result
ADM 22 Part 5 / “owner’s authorized agent / Brazil/WABO / MT / Su Apr 21
ADM23 Pt 3 / Shifts burden from applicant showing how application complies, to BO stating why it doesn’t comply / Str Bldg Components / JS OPPOSE
Adm24 Pt 3 / Doesn’t allow BO to refuse frivolous request; can BO request bldg eval only if there had been a meeting? Adds liab/responsibility for RDP bc must list “potential noncompliance” / AIA / Monitor
ADM55 / AHJ BO / Brazil/WABO / MT / Su Apr 21
ADM 60
Part 5 / 202 Definition of “repair” doesn’t include repair of damage / MT/DPD / Su Apr 21
SP4 / Definition of “aquatic vessel”; MAKE CORRECTION TO TEXT & CHANGE TERM THROUGHOUT CODE / Pool Industry / MT SUPPORT / Su Apr 21
IFC (TRACK 1)
Subject / Submitted by / Testimony / Probable date / CAH result
G1 / IBC classification of spirits / MT/WABO / MT / Tu Apr 23
F285 / Storage of distilled spirits = Group H / Emerick / Monitor
F20 / Adopts WUIC by reference / Apfelbeck / LK OPPOSE / Tu Apr 23
F125 / Sprinklers for storage of distilled spirits / Emerick / Monitor
IRC-B (TRACK 1)
No. / Subject / Submitted by / Testimony / Probable date / CAH result
ADM5 Pt 2 / “Owner” / Muni Lawyers / Monitor
ADM8 Pt 2 / Add “earthquake, wind, radon” to scope / Bela / Monitor
ADM 22 Part 4* / “owner’s authorized agent
*will come after ADM18 on RB agenda / Brazil/WABO / MT / Th Apr 25
ADM23 Pt 2 / Shifts burden from applicant showing how application complies, to BO stating why it doesn’t comply / Str Bldg Components / JS OPPOSE
Adm24 Pt 2 / Doesn’t allow BO to refuse frivolous request; can BO request bldg eval only if there had been a meeting? Adds liab/responsibility for RDP bc must list “potential noncompliance” / AIA / Monitor
ADM27 Pt 2 / Permit exemption for accessory structures / Rick Davidson / Monitor
ADM 47 Pt 4 / Copyright / AIBD / OPPOSE/Monitor
ADM49 Pt 2 / C of O for change of use / J Anderson / Monitor
ADM50 Pt 2 / Unlawful to violate federal law / Natl Ctr for Healthy Housing / TN OPPOSE
ADM55 / AHJ BO / Brazil/WABO / MT / Th Apr 25
ADM 60
Part 4 / 202 Definition of “repair” doesn’t include repair of damage / MT/DPD / Th Apr 25
RB15 / Decks and balconies / Rick Davidson / JS OPPOSE
RB72 / Percent of openings measured per story / MT/WABO / RA/MT / Th/Fr Apr 25/26
RB67 / Eave protection / RA/WABO / Ray/Tim / Th/Fr Apr 25/26
RB83 / Protection of cantilevered bldgs / RA/WABO / Ray/Tim / Th/Fr Apr 25/26
RB104 / Open space for courts & yards / JS/DPD / Fr Apr 26
RB111 / Glazing; inconsistent with IBC / BCAC / MT OPPOSE / Sa Apr 27
RB203 / Mezzanines / MT/WABO / RA/LK / Sa Apr 27
RB206 / Protection of adjoining property / JS/WABO / JS / Sa Apr 27
RB207 / Site work / JS/WABO / JS / Sa Apr 27
RB228 / Retaining walls; excessive to req engineer for 2’ wall / BCAC / JS OPPOSE
RB260 / Location of deck hold-downs / HJ/WABO / LK / Sa Apr 27
RB261 / Height of deck with hold-downs / HJ/WABO / LK / Sa Apr 27
RB262 / Deck alternate WABO TO PROPOSE MOD to “flashing for water tightness with drip edge” / HJ/WABO / LK—MOD / Sa Apr 27
RB263 / Deck attachment; similar to RB261 / BCAC / Monitor / Sa Apr 27
IEBC (TRACK 2)
Subject / Submitted by / Testimony / Probable date / CAH result
ADM 56 / Add definition of “approved” / MT/DPD / Su Apr 21
EB2 / Add section on maintenance to a section that applies to all methods / MT/DPD / Su Apr 21
EB3 / Accessibility for work area method; IFC chap 11 / AIA, Davidson / Against / Su Apr 21
EB4 / 301.1 eliminate redundancy / MT/WABO / MT / Su Apr 21
ADM36 Pt1 / Mold permits / Midwest Aerobiology / Monitor
EB8 / 602.3 Mold & moisture control / Nat’l Ctr for Hlthy Living / Against / Su Apr 21
EB34 / 805.3.1.1 #4—“community residence for the developmentally disabled” / MT/DPD / Su Apr 21
EB35 / Level 2 single exit R-1 & R-2 OPPOSE / S. Thomas / JS
EB7 / Scope of level 3 alterations; changing HVAC would be Level 3 alt / AIA / Against / Su Apr 21
EB51 / Level 3 energy upgrades / NBI, AIA, NTHP / Monitor
EB55 / 1009.1 “…comply with the intent of the IMC” / MT/DPD / Su Apr 21
EB57 / Grp A sprinklers on change of occ / BCAC / Monitor
Admin (TRACK 2)
Subject / Submitted by / Testimony / Probable date / CAH result
ADM5 Pt 1 / “Owner” / Muni Lawyers / Monitor
ADM8 Pt 1 / Add “earthquake, wind, radon” to scope / Bela / Monitor
ADM12 / Similar to F20 re adoption of IWUIC / Apfelbeck / OPPOSE
ADM14 / Change from IRC bldg to other occupancy Redundant / Colo Fire / Monitor
ADM22
Part 1 / “owner’s authorized agent / Brazil/WABO / MT / Su/Mo Apr 21/22
ADM23 Pt 1 / Shifts burden from applicant showing how application complies, to BO stating why it doesn’t comply / Str Bldg Components / JS OPPOSE
Adm24 Pt 1 / Doesn’t allow BO to refuse frivolous request; can BO request bldg eval only if there had been a meeting? Adds liab/responsibility for RDP bc must list “potential noncompliance” / AIA / Monitor
ADM25 / Repairs / Apfelbeck / JS OPPOSE
ADM27 Pt 1 / Permit exemption for accessory structures / Rick Davidson / Monitor
ADM28 / Delete permit exemption for prefab pools / Pool & Spa / TN OPPOSE
ADM39 / Occupancy prohibited before approval / Apfelbeck / Monitor
ADM42 / Construction docs include structural reports; consistent with WABO Group A proposal that was approved / Brazil / Monitor (JS for Sea will support)
ADM 46 / 107.3.4.2 Move def of “deferred submittal” to chapter 2 / MT/DPD / Su/Mo Apr 21/22
ADM 47 Pt 1 / Copyright / AIBD / OPPOSE/Monitor
ADM49 Pt 1 / C of O for change of use / J Anderson / Monitor
ADM50 Pt 1 / Unlawful to violate federal law / Natl Ctr for Healthy Housing / TN OPPOSE
ADM55
Part 1 / AHJ BO / Brazil/WABO / MT / Su/Mo Apr 21/22
ADM 60
Part 1 / 202 Definition of “repair” doesn’t include repair of damage / MT/DPD / Su/Mo Apr 21/22
ADM62 / Updates to standards; propose delete update to ACI 318 / ICC staff / JS PROPOSE MOD
RES Energy (TRACK 2)
Subject / Submitted by / Testimony / Probable date / CAH result
CE47 Pt2 / Unconditioned space includes periodically unoccupied, interesting concept, but vague / VBCOA / Monitor
ADM55
Part 2 (CE) / AHJ BO / Brazil/WABO / MT / We Apr 24
CE8 Part 2 (RE) / Historic bldgs; CE9 & CE10 are related. Lee will coordinate with proponents; TCD prefers WABO proposal / LK/WABO / TN / We Apr 24
ADM 60
Part 3 (RE) / 202 Definition of “repair” doesn’t include repair of damage / MT/DPD / We Apr 24
CE3 Pt2 / Delete existing bldg provisions; CE6 & CE19 are related CE3 only covers work area method—check whether IEBC chap 4 covers this subject / R Dahmen / RA OPPOSE
CE20
Part 2 / Change of occupancy / LK/WABO / TN / We Apr 24
CE28 Pt2 / Meet intent requirements of code / Energy groups / Monitor
CE35 Pt1 / RDP req’d for construction docs / Taylor / RA OPPOSE
CE38 Pt2 / Review & inspections / DOE / Ray OPPOSE
ADM 47 Pt 3 / Copyright / AIBD / OPPOSE/ Monitor
ADM22
Part 3 (RE) / “owner’s authorized agent / Brazil/WABO / MT / We/Th Apr 24/25
COMML Energy (TRACK 2)
Subject / Submitted by / Testimony / Probable date / CAH result
CE3 Pt1 / Delete existing bldg provisions; CE6 & CE19 are related CE3 only covers work area method—check whether IEBC chap 4 covers this subject / R Dahmen / RA OPPOSE
ADM 60
Pt 2 (CE) / 202 Definition of “repair” doesn’t include repair of damage / MT/DPD / Th Apr 25
CE8 Part 1 (CE) / Historic bldgs / LK/WABO / LK/RA / Th Apr 25
CE9 & CE10 / Similar to CE8--CE9 & CE10 are related. Lee will coordinate with proponents; TCD prefers WABO proposal / LK
CE20
Part 1 / Change of occupancy / LK/WABO / LK/RA / Th Apr 25
CE21 / Eqpmt bldgs exemt pfrom code / Fiberbond Co / Monitor
CE27 / Eqpmt bldgs exemt pfrom code / DOE / Monitor
CE28 Pt1 / Meet intent requirements of code / Energy groups / Monitor
CE35 Pt1 / RDP req’d for construction docs / Taylor / RA OPPOSE
CE47 Pt1 / Unconditioned space includes periodically unoccupied, interesting concept, but vague / VBCOA / Monitor
CE38 Pt1 / Review & inspections / DOE / Ray OPPOSE
ADM 47 Pt 2 / Copyright OPPOSE/MONITOR / AIBD / OPPOSE/ Monitor
ADM22
Part 2 (CE) / “owner’s authorized agent / Brazil/WABO / MT / Th/Fr Apr 25-26
CE88 / Component performance alternative / LK/WABO / LK/RA / Fr Apr 26
CE113 / Roof insulation must be 2 layers / NRCA / Monitor
CE168 / Air barrier testing / LK/WABO / LK/RA / Sa Apr 27
CE169 / Air barrier testing—Similar to CE168 / NBI, Mathis / no position / Sa Apr 27
CE190 / Vestibules / LK/WABO / LK/RA / Sa/Su Apr 27-28
CE296 / Daylight controls / DJ/DPD / Mo/Tu Apr 29-30
CE302 / Stairway lighting controls / DJ/DPD / Mo/Tu Apr 29-30
CE330 / Controlled receptacles / DJ/DPD / Tu Apr 30
CE332 / Escalators / LK/WABO / LK/RA / Tu Apr 30
CE360 / Metering / DJ/DPD / Tu Apr 30
CE361 / Solar zone / DJ/DPD / Tu Apr 30
IPMC (TRACK 2)
ADM36 Pt2 / Mold permits / Midwest Aerobiology / Monitor
UPC (IAPMO)
Subject / Submitted by / Result
Rainwater / Dave Cantrell

SBCC

Subject / Submitted by / CAH result
CE17 / Existing mechanical systems / TN/SBCC
CE18 / Existing lighting systems / TN/SBCC
CE26 / Semi-heated space / TN/SBCC
CE135 / Continuous insulation alternative / TN/SBCC
CE194 / Walk in coolers / TN/SBCC
CE269 / Water heater meters / TN/SBCC
CE291 / Automatic time clocks / TN/SBCC
CE292 / Occupancy sensors / TN/SBCC
CE295 / Daylight zone controls / TN/SBCC
CE298 / Daylight zone controls / TN/SBCC
CE301 / MOE lighting controls / TN/SBCC
CE305 / Area lighting controls / TN/SBCC
CE315 / line-voltage lighting tracks / TN/SBCC
CE318 / Exterior lighting / TN/SBCC
CE342 / C407.2 / TN/SBCC
CE345 / Software tools / TN/SBCC
CE349 / Exceptional calculation measures / TN/SBCC
CE358 / Service water commissioning / TN/SBCC
CE359 / Metering commissioning / TN/SBCC
F130 / Sprinklers in basements / JM/SBCC
F194 / Hoistway pressurization / JM/SBCC
CCC 13-CE1 / C405 title / TN/SBCC / Final result=AS (Code Correlation Committee)
HearingAttendance:
Tim, Jon, Rick Lupton / 4/21-30
Maureen / 4/21-29
Lee / Wednesday 4/24 – Tuesday 4/30
Andy / Thursday 4/25 through Tuesday 4/30
Ray / Friday 4/26 (midday) – Tuesday 4/30