Test Facility Inspection Checklist
Internal Audit/Inspection Number: ______
1. Quality Assurance Program / Compliant / Comments / Initials/Date
(dd/mm/yy)Yes / No
QAU program in accordance with GLP Principles
QAU Manager designated by, and reports directly to management
QAU personnel independent of GLP study
SOPs for QAU procedures and responsibilities
QAU files/records in secure location
File with copies of GLFC GLP Documents
Copy of current GLFC GLP Organization Chart
File of current GLP Work Areas; including floor plans and maps with study identification
GLP Training Log
Log of Notification of Non-compliance to a SOPSOP Concurrence Log
SOP Checklist for Format and Content
Peer Review Log for SOPs, Study Plans and Final Reports
QAU Master List of SOPs and Reporting Forms
Current List of SOPs
Current List of Reporting Forms
SOP Manual
File of CFS Study Work Plans for current year
Study Plan Concurrence Log
Study Plan Checklist for Format and Content
Final Report Concurrence Log
Final Report Checklist for Format and Content
QAU file for each GLP study
Master Schedule Reporting Form Log
Master Schedule
File of Internal QAU Inspections/Audits
Internal audit/inspection results reported to management, SD, PI and others, as appropriate
File of Regulatory Inspections/Audits
File of Sponsor Inspections/Audits
Test Facility Inspection Checklist
Internal Audit/Inspection Number: ______
2. Archive / Compliant / Comments / Initials/Date
(dd/mm/yy)Yes / No
SOPs for Archivist responsibilities and procedures
Security and access controlled by ArchivistArchive Access Log
Sufficient space and appropriate storage facilities for the materials archivedProtection from untimely deterioration (e.g., water, humidity, fire, rodents, etc)
Materials indexed for orderly storage and retrieval
Log of Materials Received
Storage Requirements for Archived Materials
Retrieval of Archived Materials
Disposal of Archived Materials, justified and documented
Logbooks for Archive refrigeration equipment (current year)Equipment maintenance, use and calibration logs for Archive refrigeration equipment (historical records)
Hazardous Waste Log, for Archive materials
Hazardous Waste Logs, filed by name of SD
Master Schedules
Files of GLP Work Areas, including floor plans/maps indicating GLP work areas, Archive, DCO records, QA records; filed by study number
Organization Charts, current and historical
Designation of GLP Officials, current and historicalPolicy Documents, current and historical
Certificates of GLP Recognition, current and historical
SOPs, current and historical
Staff Records and GLP Training files for all study personnel and GLP officialsStudy Manuals; including all required elements; filed by study number.
Supporting study materials, including samples, specimens, test/reference items, etc; filed/stored by study number
Equipment Maintenance, Use and Calibration Logs for GLP studies; including manuals when retired/disposed; filed by name of SD and by equipment identifier
Test Materials and Reference Items Logbooks, filed by name of SD
Computer Validation Documentation (when not part of Study Manual), filed by name of SD and by equipment identifier
QAU Files for Internal Inspections/Audits
QAU Files for Regulatory Inspections/Audits
QAU Files for Sponsor Inspections/Audits
Duplicate Samples, taken by regulatory inspectors; identified by study number and reference to inspection
Lists of SOPs and Reporting Forms, current and historical
Study Work Plans
Log of Notification of Non-compliance to a SOP
DCO Records, including exact copies of all forms up to start of current year
Test Facility Inspection Checklist
Internal Audit/Inspection Number: ______
3. Document Control / Compliant /Comments
/ Initials/Date
(dd/mm/yy)Yes / No
SOPs for DCO responsibilities and procedures
DCO files/records in secure location
DCO Study Number Assignment Log
DCO Log of SOPs
DCO Log of Reporting FormsDCO SOP Manual
DCO Distribution Log
Test Facility Inspection Checklist
Internal Audit/Inspection Number: ______
Note: Use a page form for each GLP Work Area (i.e., suite of labs under the control of one Study Director or Principle Investigator)
4. GLP Work Areas(identify area: ______) / Compliant / Comments / Initials/
Date
(dd/mm/yy)Yes / No
Valid/current SOPs readily available and followed
Work areas of suitable design, size, location, separation, construction and cleanliness
Separate wet chemistry and instrument labs
Chemicals, reagents, solutions labeled and stored properly
Equipment in good working condition
Equipment Maintenance, Use and Calibration Logs
Test Material Receipt Log
Test Material Use and Distribution Log
Reference Item Receipt Log
Reference Item Use and Distribution Log
Adequate collection, storage and disposal of solvents and waste
Hazardous Waste Log
Sample Shipment and Storage Log
Sample Tracking Form (included in equipment logbook)
GLFC Radioisotope Inventory Record
Radioactive Contamination Monitoring Log
Safety Binder
GLP Form Number 0064/002 Page 1 of 5