Unit 7 – Manufacturing Execution

Instructions: Choose the correct answers and explain why it is correct. Some questions have only one answer, others have more than one correct answer. Other questions require your written response.

1.Which of the following statements about Work Centers are correct?

(Choose all that apply)

  1. A cost center can be assigned to a work center
  2. People, Positions and Qualifications can be assigned to a work center on the Scheduling tab.
  3. Formula keys are used to calculate cost, calculate execution time and calculate capacity requirements
  4. Work Centers are used to maintain resource related data.

2.Which of the following are elements of a Production Order?

(Choose all that apply)

  1. A production order must have at least two operations
  2. Material components, PRTs and trigger points can be assigned to a Production Order
  3. Documents from the Document Management System can be linked to Production Orders
  4. Only Actual costs can be tracked on a Production Order
  5. The Production Order Status controls the allowed activities

3.Which functions of a production order can be automated?

(Choose all that apply)

  1. Order Release
  2. Material Staging
  3. Material Withdrawal Posting
  4. Goods Receipt.
  5. Order Settlement

4.Which documents are created as a result of Goods Issue Posting?

(Choose all that apply)

  1. Pick List
  2. Material Document
  3. Accounting Document
  4. Controlling Document
  5. Production Order Document

5.What status must a Production Order be at in order to complete Material Withdrawals?

(Choose the correct answer)

  1. Created
  2. Material Availability Check
  3. Settlement Rule Created
  4. Released
  5. Printed

6.A plant is a:

(Choose all that apply)

  1. Manufacturing facility
  2. DistributionCenter
  3. Plant Maintenance Plant
  4. Inventory

7.The Material Master can be created in two ways – what are they:

8.What kind of documents are created during goods issue for a production order?

(Choose all that apply)

  1. Purchase Requisition
  2. Material Reservation
  3. Controlling document
  4. Material Document
  5. Financial Accounting Document

9.What is the structure of a production order?

10.How would you describe the integration of the Vendor Master:

(Choose all that apply)

  1. Be directly used in production
  2. Groups of views for SD
  3. Groups of views for FI
  4. Be used to post directly in supplier or vendor accounting

11.Name the material master view that is responsible or relevant for integration with production?

(Choose the correct answer)

  1. Cost Planning
  2. Work Scheduling
  3. Sales and Distribution
  4. MRP

12.Name the material master views that are responsible or relevant for integration with production planning?

(Choose the correct answer)

  1. Cost Planning
  2. Work Scheduling
  3. Sales and Distribution
  4. MRP

13. What are the steps of Production Order Processing?
(Choose all that apply)

  1. Order request – from sales planning
  2. Order creation – from plan to production
  3. Availability checks (auto)
  4. Material reservation
  5. Order release (auto) – becomes executable – material & capacity
  6. Download to Production Data Control (PDC) system
  7. Order print (auto)
  8. Material staging
  9. Material withdrawal posting (auto) – post good issue
  10. Upload to PDC system
  11. Confirmation (auto) – recording of actual production data
  12. WIP determination (background)
  13. Good receipt (auto)
  14. Variance calculation (background)
  15. Order settlement (background) – post to GL account
  16. Archiving/deleting

14.The structure of the routing contains production operations that are to be performed. (True or false)

15.Upon creation of a production order, then the subsequent processes, such as printing the shop floor documents, component withdrawal, and order confirmation may occur. (True or false)

16.What are the elements of a production order?
(Choose all that apply)

  1. Order header
  2. Settlement rule
  3. Costs
  4. Operation sequences
  5. Operations
  6. Material components
  7. PRTs
  8. Document links

17.Standard operating times are defined in the ______. (Fill in the blank)

18.A work center controls parameters such as setup time and labor, which are maintained within the routing. (True or false)

19.What are the application modules that integrate with Manufacturing Execution?
(Choose all that apply)

  1. Inventory management
  2. Quality management
  3. Financial accounting
  4. Controlling
  5. Sales and distribution
  6. Project Systems
  7. Human capital management

20. Order confirmations are used for entering activities carried out within your company for an order, such as a production order. (True or false)

Unit 07Manufacturing Execution1/4