TABLE OF CONTENTS
PART I – ADMINISTRATIVE
Introduction 07/11
Table of Contents 07/11
Administrative Requirements 07/10
PART Ii – DESIGN REQUIREMENTS
Design Requirements - General 1 09/07
General Design Guidelines, Accessibility, Sustainable Materials
Design Requirements - Site 2 07/10
Site Utilities, Storm Drainage, Landscape, Parking/Circulation, Site Lighting &
Electrical, Waste Collection
Design Requirements – Building 7 09/07
Access to Natural Light and Views, Acoustics, Human Factors, Indoor Pollutant
Reduction and Control, Lactation Rooms, Maintenance, Laboratories
Design Requirements – Structural 11 09/06
General, Securing Non-Structural Elements
Energy Efficiency 12 07/10
General Requirements, Life Cycle Cost Analysis, Energy Conservation Measures
PART Iii – CONSTRUCTION DIVISIONS
Facility construction subgroup
Division 2 — existing conditions 09/06
Hazardous Material Assessment 02 26 00
Demolition 02 41 00
Division 3 — concrete 09/08
Concrete 03 00 00
Division 4 — masonry 09/06
Masonry 04 00 00
Division 5 — metals 09/06
Metals 05 00 00
Division 6 — wood, plastics and composites 09/06
Rough Carpentry 06 10 00
Finish Carpentry 06 20 00
Division 7 — thermal and moisture protection 07/11
Dampproofing and Waterproofing 07 10 00
Membrane Roofing 07 50 00
Joint Sealants 07 92 00
Division 8 — openings 07/11
Metal Doors and Frames 08 11 00
Specialty Doors and Frames 08 30 00
Aluminum Entrances, Storefronts and Curtain Walls 08 40 00
Automatic Entrances 08 42 29
Hardware 08 70 00
Division 9 — finishes 09/08
Plaster and Gypsum Board 09 20 00
Acoustical Ceilings 09 51 00
Resilient Flooring 09 65 00
Carpeting 09 68 00
Painting and Coating 09 90 00
Division 10 — specialties 07/11
Visual Display Surfaces 10 11 00
Signage 10 14 00
Toilet Compartments 10 21 13
Toilet Accessories 10 28 13
Fire Extinguishers 10 44 16
Division 11 — equipment 07/10
Laboratory Equipment 11 53 00
Division 12 — furnishings 09/07
Window Treatments 12 20 00
Site Furnishings 12 93 00
Division 13 — special construction 09/07
Controlled Environment Rooms 13 21 00
Division 14 — conveying equipment 09/06
Elevators 14 20 00
Facility services subgroup
Division 21 — fire suppression 07/11
Fire Suppression 21 00 00
Division 22 — plumbing 07/11
Common Requirements 22 05 13
Meters and Gages for Plumbing Piping 22 05 19
Hangers and Supports for Plumbing Piping and Equipment 22 05 29
Facility Drainage Piping Cleanouts 22 05 76
Plumbing Insulation 22 07 00
Commissioning of Plumbing 22 08 00
Facility Water Distribution 22 11 00
Facility Sanitary Sewerage 22 13 00
Facility Storm Drainage 22 14 00
Commercial Plumbing Fixtures 22 42 00
Emergency Plumbing Fixtures 22 45 00
Compressed Air Systems for Laboratory Facilities 22 61 00
Vacuum Systems for Laboratory Facilities 22 62 00
Gas Systems for Laboratory Facilities 22 63 00
Laboratory Chemical Waste and Vent Piping 22 66 00
Processed Water Systems for Laboratory Facilities 22 67 00
Division 23 — heating, ventilating, and air-conditioning 07/11
Common Motor Requirements 23 05 13
Meters and Gages for HVAC Piping 23 05 19
Vibration and Seismic Controls for HVAC Piping and Equipment 23 05 48
HVAC Piping Insulation 23 07 19
Commissioning of HVAC 23 08 00
Instrumentation and Control for HVAC 23 09 00
Instrumentation and Control for LAB HVAC 23 09 10
Facility Fuel-Oil Piping 23 11 13
Facility Natural Gas Piping 23 11 23
Hydronic Piping and Pumps 23 21 00
Steam and Condensate Piping and Pumps 23 22 00
Refrigerant Piping 23 23 00
HVAC Air Distribution 23 30 00
Fume Hoods 23 38 16
Fuel-Fired Heaters 23 55 00
Mechanical Refrigeration 23 60 00
Custom Packaged Outdoor HVAC Equipment 23 75 00
Decentralized Unitary HVAC Equipment 23 81 00
Computer Server Room Air Conditioners 23 81 23
Convection Heating and Cooling Units 23 82 00
Building Mechanical Rooms 23 90 00
Division 26 — ELECTRICAL 07/11
Low-Voltage Electrical Power Conductors and Cables 26 05 19
Grounding 26 05 26
Hangers and Supports 26 05 29
Raceway and Boxes 26 05 33
Underground Ducts and Raceways 26 05 43
Identification 26 05 53
Lighting Control 26 09 23
Medium-Voltage Transformers 26 12 00
Low Voltage Transformers 26 22 00
Switchboards and Panelboards 26 24 00
Electricity Metering 26 27 13
Wiring Devices 26 27 26
Low-Voltage Circuit Protection Devices 26 28 00
Enclosed Controllers 26 29 13
Variable Frequency Motor Controls 26 29 23
Packaged Generator Assemblies 26 32 00
Transfer Switches 26 36 00
Interior Lighting 26 51 10
Exit Signs 26 53 00
Exterior Lighting 26 56 00
Division 27 — communications 07/11
Communications 27 00 00
Division 28 — electronic safety and security 09/06
Fire Detection and Alarm 28 31 00
site and infrastructure subgroup
Division 31 — earthwork 09/08
Excavation and Fill 31 23 00
Trenching and Backfilling 31 23 33
Division 32 — exterior improvements 07/11
Bases, Ballasts and Paving 32 10 00
Aggregate Surfacing 32 15 00
Planting Irrigation 32 84 00
Planting 32 90 00
Division 33 — utilities 07/11
Utility Line Signs, Markers and Flags 33 05 26
Utility Meters 33 05 33
Water Distribution 33 11 00
Fire Suppression Water Distribution Piping 33 11 19
Domestic Water Piping Disinfection 33 13 00
Sanitary Sewerage Utilities 33 30 00
Storm Drainage Utilities 33 40 00
Natural Gas Distribution 33 51 00
Hydronic Energy Distribution 33 61 00
Steam Energy Distribution 33 63 00
Electrical Utility Poles 33 71 16
Electrical Underground Ducts and Manholes 33 71 19
Medium Voltage Wiring 33 71 49
Medium Voltage Utility Switchgear and Protection Devices 33 77 00
PART IV – Standard Specifications
Division 1
2004 CSI Format
TECHNICAL SPECifications
Selective Site Demolition 02 41 13 07/10
Selective Structure Demolition 02 41 19 07/10
Asbestos 02 82 00 07/10
Lead Remediation 02 83 00 07/10
Mold Clean Up 02 85 00 07/10
Water Resistive Barrier System 07 25 00 07/11
Cement Plaster Lathing and Lath Accessories 09 22 36.2 07/11
Portland Cement Plastering 09 24 00 07/11
Controlled Environment Rooms 13 21 00 07/10
Elevators 14 20 00 07/11
Commissioning of Plumbing 22 08 00 07/10
Commissioning of HVAC 23 08 00 07/10
Commissioning of DDC/EMS Systems 25 08 00 07/11
DDC/EMS General Requirements 25 95 00 07/11
DDC/EMS Hardware 25 95 30 07/11
DDC/EMS Software 25 95 50 07/11
Commissioning of Electrical Systems 26 08 00 07/10
Commissioning of Electrical Safety Security 28 08 00 07/10
Fire Detection and Alarm 28 31 00 07/11
Planting Irrigation 32 84 00 07/11
Planting 32 90 00 07/11
Manholes and Structures 33 05 13 07/10
Utility Line Signs 33 05 26 07/10
Commissioning of Utilities 33 08 00 07/10
Commissioning of Water Utilities 33 08 10 07/10
Commissioning of Sewer Utilities 33 08 30 07/10
Water Utility Distribution Piping 33 11 00 07/10
Backflow Preventers 33 12 13 07/10
Water Distribution Valves 33 12 16 07/10
Fire Hydrants 33 12 19 07/10
Water Utility Metering 33 12 33 07/10
Disinfection of Domestic Water Piping 33 13 00 07/10
Sanitary Utility Sewerage Piping 33 31 00 07/10
Sanitary Utility Sewerage Cleanout 33 39 23 07/10
Natural Gas Piping 33 51 13 07/10
PART V – drawings
Architectural – Recycling Cabinet Details A-01 09/08
Building Refrigeration - Typical Environmental Room "No Defrost" BR-01 07/11
Building Refrigeration - Typical Environmental Room "Requiring Defrost" BR-02 07/11
Chilled Water – Typical Ultrasonic Flow Meter CW-01 07/11
Chilled Water – Typical Insertion Flow Meter CW-02 07/11
Domestic Water – Double Check Valve Assembly Firewater Service DW-01 07/11
Domestic Water – Reduced Pressure Backflow Preventer (DW 3" & Larger) DW-02 07/11
Domestic Water – Reduced Pressure Backflow Preventer (2" & Smaller) DW-03 07/11
Domestic Water – Water Meter (2” or less) DW-04 07/11
Domestic Water – Reserved for Future Detail DW-05 07/11
Domestic Water – Water Valve and Valve Box DW-06 07/11
Domestic Water – Tee Connection @ Main DW-07 07/11
Domestic Water – Hydrant DW-08 07/11
Domestic Water – Thrust Block Horizontal DW-09 07/11
Domestic Water – Thrust Block Vertical DW-10 07/11
Domestic Water – Air Release DW-11 07/11
Electrical – Transformer E-01 07/11
Electrical – Transformer Pad E-02 09/08
Electrical – Building Electrical Meter & Utility Meters Connection Diagram E-03 07/11
Electrical – Building Electrical Meter & Utility Meters Connection Diagram Ion 7550/7650 E-04 07/11
Electrical – Duct Bank Cross Section E-05 07/11
Electrical – Grounding E-06 07/11
Electrical – Entry Through Footings E-07 07/11
Electrical – Light Pole Base E-08 07/11
Electrical – Manhole and Cable Rack Section E-09 07/11
General – Trench Single Utility G-01 07/10
General – Trench Double Utility Horizontal G-02 07/10
General – Trench Double Utility Vertical G-03 07/10
General – Pressure Pipe Over Structure G-04 09/08
General – Pressure Pipe Lowering G-05 09/08
General – Asbestos Cement Pipe Under Crossing G-06 09/08
General – Utilities Painting Standards G-07 09/08
Hardscape – Sidewalk Details H-01 07/11
Hardscape – Concrete Paving H-02 07/11
Hardscape – Concrete Mowband UCD Standard H-03 07/11
Hardscape – Concrete Mowband Plain H-04 07/11
Hardscape – Decomposed Granite with Redwood Header H-05 07/11
Hardscape – Area Drain H-06 07/11
Hardscape – Permanent Metal Bollard H-07 07/11
Hardscape – Removable Steel Bollard H-08 07/11
Hardscape – Removable Wood Bollard H-09 07/11
Landscape – Irrigation Shut Off Valve L-01 09/08
Landscape – Valve Box Installation L-02 09/08
Landscape – Sleeve Under Pavement L-03 09/08
Landscape – Irrigation Controller System Schematic L-04 09/08
Landscape – Irrigation Controller L-05 09/08
Landscape – Irrigation Controller Detail L-06 09/08
Landscape – Irrigation Controller Antenna L-07 09/08
Landscape – Flow Sensor Installation L-08 09/08
Landscape – Trenching Detail L-09 09/08
Landscape – Irrigation Wire Connection L-10 09/08
Landscape – Irrigation Gate Valve RCV's L-11 09/08
Landscape – Irrigation Remote Control Valve L-12 09/08
Landscape – Pop-up Sprinkler L-13 09/08
Landscape – Sprinkler on a Slope L-14 09/08
Landscape – Deep Root Watering System L-15 09/08
Landscape – Quick Coupling Valve L-16 09/08
Landscape – Tree Irrigation L-17 09/08
Landscape – Tree Planting Typical (Double Stake) L-18 09/08
Landscape – Shrub Planting Typical L-19 09/08
Landscape – Planting Triangular Spacing Diagram L-20 09/08
Landscape – Vine Planting Detail L-21 09/08
Landscape – Ground Cover Planting L-22 09/08
Landscape – Sod Lawn Detail L-23 09/08
Natural Gas – Gas Valve and Valve Box NG-01 09/08
Natural Gas – Typical Gas Service – Diaphragm Meter NG-02 07/11
Natural Gas – Typical Gas Service – Rotary Meter NG-03 07/11
Storm Drainage – Drain Inlet SD-01 09/08
Storm Drainage – Oil/Sand Separator SD-02 09/08
Sanitary Sewer – Manhole SS-01 07/10
Sanitary Sewer – Manhole Cover SS-02 07/10
Sanitary Sewer – Inside Drop SS-03 07/10
Sanitary Sewer – Service Lateral & Cleanout SS-04 09/08
Sanitary Sewer – Grease Interceptor SS-05 09/08
Steam – Vault Typical Layout ST-01 09/08
Steam – Vault Electrical ST-02 09/08
Steam – Condensate Cooler in Steam Vault ST-03 07/11
Steam – High Pressure Steam Trap Set ST-04 07/11
Steam – Pressure Reducing Station ST-05 07/11
Steam – Typical Steam Meter ST-06 07/11
Steam – Typical Condensate Meter ST-07 07/11
PART VI – appendixes
Abbreviations and Definitions A 07/10
Student Housing B 05/05
Animal Facilities C 07/10
Biological Safety Laboratories D 07/10
Trash Enclosures E 07/10
PART VII - Related Standards
Architectural Design Guidelines 09/03
Signage Standards 07/11
TABLE OF CONTENTS
July 2011