Attachment A
Supplier PTI (Routine) Requirements for Category II Tools
Tool Number / Serial Number / Customer Serial Number / PTI Plan Revision / PTI DatePTI Type Major or Minor / Supplier Accept/Reject / Previous PTI Date / Tool Rejection Documents
(if applicable)
Reject Tag No.
SIR No.
Supplier Stamp and Date / Vought Stamp and Date
(if applicable) / Customer Stamp and Date
(if applicable)
Fill in all blanks below that apply to the type PTI being performed (Major/Minor).
PTI will not be accepted without applicable Quality verification stamps.
1) Latest Tool Design revision used ______
2) Record Level/Transit/Scale information as required:
a. Level Calibration Identification Number ______
b. Level Calibration Identification Number ______
c. Transit Calibration Identification Number ______
d. Transit Calibration Identification Number ______
e. Scale Calibration Identification Number ______
f. Scale Calibration Identification Number ______
g. Scale Calibration Identification Number______
3) Verify digital operator(s) certification is current. Stamp and date ______
4) Record Digital Equipment and Scale Bar as required.
a. Digital Equipment Calibration Number ______
b. Digital Equipment Calibration Number ______
c. Scale Bar Calibration Number ______
d. Scale Bar Calibration Number ______
Note:Scale bar should be the same material as the primary material of the tool. The scale bar should be allowed to ‘soak’ with the jig until it is at the same temperature (±1° f).
Scale bar and tool temperature within ±1 degree Fahrenheit prior to PTI. / Inspection Stamp and DateScale Bar calibrated length / Inspection Stamp and Date
Scale Bar measured length before PTI / Inspection Stamp and Date
Scale Bar measured length after PTI / Inspection Stamp and Date
.
5)
Optical equipment adapters have current calibration stickers / Inspection Stamp and Date6)
Digital equipment adapters have current calibration stickers. / Inspection Stamp and Date7)Record all temperatures in Fahrenheit
Note:Tool to be ‘soaked’ at 68° ± 5° F 24 hours prior to any PTI. Log temperature approximately every (4) hours during the use of Optical or Digital Equipment on an attached sheet or attach a continuous graph verified by quality to the PTI report.
TEMPERATURE RECORD
BEFORE PTI
/ AFTER PTIReading / Inspection
Stamp / Time / Date / Reading / Inspection
Stamp / Time / Date
CONTINUOUS TEMPERATURE RECORD
Reading / InspectionStamp / Time / Date / Reading / Inspection
Stamp / Time / Date
8)Optically Level and/or Plumb tool within .005 TIR.
Note:The tool will be leveled within the previous 24 hours prior to the start of any optical or digital PTI and re-verified every 8 hours until PTI is complete. Attach additional level and/or plumb as required to PTI report.
LEVEL RECORD
BEFORE / AFTERLocation / Reading / Inspection
Stamp / Date / Location / Reading / Inspection
Stamp
/ Date1 / 1
2 / 2
3 / 3
4 / 4
5 / 5
6 / 6
7 / 7
8 / 8
ADDITIONAL LEVEL RECORD
BEFORE / AFTERLocation / Reading / Inspection
Stamp / Date / Location / Reading / Inspection
Stamp
/ Date9 / 9
10 / 10
11 / 11
12 / 12
13 / 13
14 / 14
15 / 15
16 / 16
PLUMB RECORD (as required)
BEFORE /AFTER
Location / Reading / InspectionStamp / Date / Location / Reading / Inspection
Stamp
/ Date1 / 1
2 / 2
3 / 3
4 / 4
9) Visually inspect pins, bushings, master located details for wear or damage and ensure detail
acountability per current tool design.
Inspection Stamp / Date10) Ensure all details are clean, bolted and doweled per tool design.
Inspection Stamp / Date11)List coordinating Tools (Example: MG tooling part number serial number)
Tool Code / Tool Number / Tool Serial Number12) Verify reference system per tool design tolerence.
Inspection Stamp / Date13) Inspect tool per PTI plan or tool design.
14) Attach inspection report containing all verified actual dimensions.
15)Comments:
______