Stormwater Project Call for Express of Interest

-All Inclusive Hydrovac Services

Scope of Work

The Town of Wainwright is inviting Contractors to express interest in performing excavation of specified areas to support the flood control project in the Town of Wainwright on an as need basis.

The description of work is for illustration purpose and subject to any changes. Any questions should be directed to Banner Engineering.

Description of Work

This site requires a company who is able to supply the necessary hydrovac excavation services to support the construction of the Town of Wainwright’s Flood Control Project, within 24 hours of request.

The contractor will be able to provide hydrovac services including the following:

Day Lighting/Utility locates: Exposing sensitive pipelines and utility lines such as fiber optic.

Trenching/Excavation: Trenching and excavation to aid in the installation of pipelines and to facilitate utility and pipeline crossings

Specifications of Work

The work will include supplying and operating hydrovac equipment which will be used to support the construction of the flood control project. The non-mechanical, non-destructive process will be used to excavate and evacuate soil at several crossings throughout the Wainwright area to expose underground utilities as requested by the site Engineer. The estimated construction timeline for this work item is August 1, 2016 to January 1, 2019; Contractor will honor the quoted unit rate for the duration of the construction timeline (no price change up to January 1, 2019).

The contractor shall submit their per diem pricing based on an all-inclusive 10-hour day. This rate should include all labor, equipment, mileage, meals, accommodation, tools, water, and disposal.

Work Package

Hydrovac Excavation Services;

All costs to be inclusive of mileage, travel, accommodation, meal, tools, equipment, labor, disposal, water, etc for a 10-hour work day and available for 24-hour request.

Work Item / Measurement Unit / Qty Unit Price
PER DIEM
(10 HOUR DAY)
Work Package 1 Estimated Total
(Round to the Nearest Dollar)

Force Account Activities Rate

Force account rates are reserved for activities that are beyond the scope of the tender but are approved by the owner’s representative, such as labour. Contractor may elect to supply their own force account sheet (all-inclusive rates requested, submission of non-all-inclusive rates shall equal to non-compliance of the bid submission).Equipment rates shall not exceed the latest edition of the Alberta Road Builders and Heavy Construction Association rate schedules

Item Description / Hourly Bid Rate ($/hr)
All-Inclusive Equipment Costs
To include equipment, fuel, maintenance, operator, etc.
· Equipment Component #1
______/ ______
· Equipment Component #2
______/ ______
· Equipment Component #3
______/ ______
· Equipment Component #4
______/ ______
· Equipment Component #5
______/ ______
· Equipment Component #6
______/ ______
Item Description / Hourly Bid Rate ($/hr)
All-Inclusive Labour Costs
To include labour, travel and accommodations, mileage, etc.
· Labour Component #1
______/ ______
· Labour Component #2
______/ ______
· Labour Component #3
______/ ______
· Labour Component #4
______/ ______
· Labour Component #5
______/ ______
· Labour Component #6
______/ ______

Force account rates are reserved for activities that are beyond the scope of the tender but are approved by the owner’s representative, such as labour. Contractor may elect to supply their own force account sheet (all-inclusive rates requested, submission of non-all-inclusive rates shall equal to non-compliance of the bid submission).Equipment rates shall not exceed the latest edition of the Alberta Road Builders and Heavy Construction Association rate schedules

Item Description / Hourly Bid Rate ($/hr)
All-Inclusive Material and Material Suppliers List
To include all costs for material/material suppliers
· Material/Material Suppliers List Component #1
______/ ______
· Material/Material Suppliers List Component #2
______/ ______
· Material/Material Suppliers List Component #3
______/ ______
· Material/Material Suppliers List Component #4
______/ ______
· Material/Material Suppliers List Component #5
______/ ______
· Material/Material Suppliers List Component #6
______/ ______
Item Description / Hourly Bid Rate ($/hr)
All-Inclusive Subcontractor
To include subcontractor, travel, accommodations, mileage,etc.
· Subcontractor Component #1
______/ ______
· Subcontractor Component #2
______/ ______
· Subcontractor Component #3
______/ ______
· Subcontractor Component #4
______/ ______
· Subcontractor Component #5
______/ ______
· Subcontractor Component #6
______/ ______

Force account rates are reserved for activities that are beyond the scope of the tender but are approved by the owner’s representative, such as labour. Contractor may elect to supply their own force account sheet (all-inclusive rates requested, submission of non-all-inclusive rates shall equal to non-compliance of the bid submission).Equipment rates shall not exceed the latest edition of the Alberta Road Builders and Heavy Construction Association rate schedules

Item Description / Hourly Bid Rate ($/hr)
All-Inclusive Project Superintendent/Safety Office List
To include hourly rate, travel, accommodations, mileage,etc.
· Superintendent/Safety Office Component #1
______/ ______
· Superintendent/Safety Office Component #2
______/ ______
· Superintendent/Safety Office Component #3
______/ ______
· Superintendent/Safety Office Component #4
______/ ______
· Superintendent/Safety Office Component #5
______/ ______
· Superintendent/Safety Office Component #6
______/ ______

*Must provide list of key personnel’s credentials and experience