KaiserFoundationHospital Manteca/Modesto

Stockton Medical Offices

steam boiler equipmentFailure Plan

GENERAL INFORMATION:

In the event of a failure or total disruption of the Steam Boiler system, Engineering will direct repair/replacement activities to resume normaloperations with sustained reliability in a timely manner.

PREVENTATIVE MAINTENANCE:

  • Engineering follows standard procedures in theirefforts to resume sustained delivery of the Steam Boiler system to the facility.

FAILURE PROTOCOL:

  • In response to a leak, rupture, or system failure,Engineering will:

Inspect functionality of the system, controls, distribution system, valves, water levels, and (as needed) end user equipment.

Expedite needed repairs (in house or viaapproved, outside vendor).

Notify affected departments and the Support Services Assistant Administrator of issue, approximate down time, and whether or not a back-up system is in place.

Complete Unusual Occurrence Report and inform Chief Engineer and/or AssistantChief Engineer.

  • In the event of a large scale or facility wide disruption, theChief Engineer or designee will communicate with at least one of thefollowing: the Support Services Assistant Administrator, Facility Administration and/orthe House Supervisor (for hospitals).
  • If deemed necessary, Engineering will notify key personnel of the Steam Boiler system failureby initiating a Code Green: Utility Failure through an overhead page and the mass notification system.
  • If loss of Steam Boiler equipment cannot be restored in a reasonable time frame, the Incident Command Center will be activated. The mission of the Incident Command Center is to safely manage the operations of the facility during a Steam Boiler system failure and minimize time to restore service.

Recovery:

Considerations of the most efficient and timely recovery to normal operations will begin early in the emergency response, guided by the nature of the incident and existing Business Recovery Plans. As the incident evolves, the Business Continuity Branch in the Incident Command System structure will be activated to provide appropriate attention to recovery activities. Affected departments will activate department specific Business Continuity Plans.

Incident Response Plan: Steam Boiler Equipment Failure