Structure:

  1. Prior to submitting an application
  2. Beneficiary’ s proposal on how information on implementation of the operation supported from the Fund or Funds will be communicated in practical terms
  3. No slogan/tagline has been indicated in the regulation – may each MS come up with its own?
  4. How to explain to the beneficiaries that the publicity should not be considered as something marginal.(Initial training sessions for applicants).
  5. Definition of publicity measures to be used by the beneficiary (to be done already at the stage of submitting the application?)

-Selection from different options put forward by M.A.

-Agreement upon beneficiary´s own proposal

-Should it be included as an eligible part of the contract (sanctions in case of non-respect?)

-Future placement of the plaque–CZ suggestion: GPS coordinates together with photographs documenting the “state before” and the course of project implementation to be attached to monitoring reports – it could be useful for creating electronic maps

  1. The approval for the publication in the list of operations
  2. The term “operation” is misleading for general public
  3. The name of the operation should be short, accurate, easily understandable (to avoid using highly technical and specific terms)
  1. When the operation is being implemented
  2. Information on the operation on the relevant websites
  3. Where the emblem should be put – in the above third of the home page?
  4. Placement of posters with information about the project
  5. Investment operationsforwhich the total public support to the operation exceeds EUR 500000 – a billboard
  6. Standardized downloadable templates
  7. The templates that will be designed in the Implementing act, would they be non-binding for MS?
  8. The size (does it correspond to the importance of the project)
  9. In the case when the operation is implemented at several locations
  10. “Line” constructions (roads, railways, cycle pathways)
  11. Slogan if more than one Fund supports an operation –reference to one relevant EU Fundonly?(logos clutter)
  12. Exchange rate €/national currency (to be defined if the project falls within this category)
  1. Documents
  2. Promotion giveaways
  3. Appropriate selection – related to the project goal, or reflecting regional features or specificity of the target group
  1. After the operation has been completed
  2. Investment operationsforwhich the total public support to the operation exceeds EUR 500000 –a permanent plaque
  3. Size – the minimum format (A4)
  4. Non-colour materials – inverse feature of EU logo is not admitted?
  5. Maintaining visual identity (5-year sustainability period)
  6. A plaque is the only “trace” that the operation was co-financed by EU funds